ML20210U573
| ML20210U573 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/29/1986 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20210U577 | List: |
| References | |
| NUDOCS 8606030023 | |
| Download: ML20210U573 (2) | |
See also: IR 05000423/1986015
Text
.-
-
';4;,'::.
us 25. sos
)
Docket / License: 50-423/NPF-49
(
'
,
Northeast Nuclear Energy Company
,
ATTN: Mr. John F. Opeka
t
Senior Vice President-Nuclear
Engineering and Operations Group
P.O. Box 270
Hartford, Connecticut 06101-0270
Gentlemen:
Subject:
Correction to Inspection Report 50-423/86-15
In the duplication of the subject inspection report, Page 1 was inadvertently
covered by a note.
Please replace that page with the enclosed page.
I apologize for any inconvenience this has caused.
Sincerely,
f& S ' ,
Edward C.
zinger, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosure:
Inspection Report 50-423/86-15, Page 1
cc w/ encl:
V. Papadopoli, Construction Quality Assurance Supervisor
E. R. Foster, Director of Generation Construction
W. J. Mroczka, Vice President, Nuclear Operations
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
W. D. Romberg, Station Superintendent
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector
State of Connecticut
9606030023 060529
ADOCK 0500
3
p
[ *, i :
a.
Northeast Nuclear Energy corapany
2
bec w/ enc 1:
Region I Docket Room (with concurrences)
. Management Assistant, DRMA (w/o enc 1)
DRP Section Chief
L. Prividy,-RI, BV-2
T. Rebelowski, . SRI, Millstone 1&2
8..Doolittle, LPM, NRR
R. Keinig, DRSS
RI:DRP
RI:DRP
RI:DI.
o
W
i
r'
e,,1c1L1ecm