Forwards Alternate to 860509 Equipment List for Seismic/Pump & Valve Operability Audit.Forms Should Be Completed for Listed Components by 8606l3
ML20210U370
Person / Time
Site: Vogtle  
Issue date: 05/29/1986
From: Mark Miller
Office of Nuclear Reactor Regulation
To: Conway R
GEORGIA POWER CO.
References
NUDOCS 8606020305
Download: ML20210U370 (4)


Text

-

Docket Nos.: 50-424 2 9 M'SV "#;

50-425 Mr. Richard Conway Vice President and Project General Manager Georgia Power Company Box 299A, Rt. 2 Waynesboro, GA 30830

Dear Mr. Conway:

SUBJECT:

Transmittal of Alternate Equipment List for Vogtle Seismic /

Pump and Valve Operability Audits By letter dated May 9,1986, the staff transmitted the equipment list for both the seismic and pump and valve operability audits.

Based on subsequent con-versations with your staff, we have learned that certain components are unavail-able. Therefore, Enclosure 1 contains a list of alternate BOP and NSSS equipment for the seismic audit. contains an alternate component for the pump and valve operability audit. Long fonns should be completed for the components and submitted to the staff with a copy to EG&G Idaho, Inc., by June 13, 1986.

If there are any questions regarding this information, contact me at (301) 492-7357 4

Sincerely, 6\\

[

Melanie A. Miller, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A

Enclosures:

As stated cc: See Next Page DISTRIBUTION:

7 Docket Files ;NRC PDR B. Grimes

- PWRN R/F' Local PDR E. Jordan MMiller PRC System OELD MDuncan J. Partlow ACRS (10) l

)

i

  • SEE PREVIOUS CONCURRENCE PWR#4/DPWR-A PWMhPWR-A EB/DPWR-A PWR#4/DPWR-A

+41 tiler:lr Mbuti n

  • GBagchi

/BJYoungblood 5/23/86 5/ 7 /86 5/23/86 5/lf/86 8606020305 860529 PDR ADOCK 05000424 A

PDR

i Mr. R. E. Conway e

Georgia Power Company Vogtle Electric Generating Plant cc:

Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Comission Georgia Power Company P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - Licensing Office of the Consumers' Utility Vogtle Project Council Georgia Power Company /

Suite 225 Southern Company Services, Inc.

32 Peachtree Street, N.W.

P.O. Box 2625 Atlanta, Georgia 30303 Birmingham, Alabama 35202 James E. Joiner Mr. Donald 0. Foster Troutman, Sanders, Lockerman,

-Vice President & Project General Manager

& Ashmore Georgia Power Company Candler Building Post Office Box 299A, Route 2 127 Peachtree Street, N.E.

Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Douglas C. Teper Mr. J. A. Bailey Georgians Against Nuclear Energy Project Licensing Manager 1253 Lenox Circle Southern Company Services, Inc.

Atlanta, Georgia 30306 P.O. Box 2625 Binningham, Alabama 35202 Billie Pirner Garde Citizens Clinic Director Ernest L. Blake, Jr.

Government Accountability Project Bruce W. Churchill, Esq.

303 10th Street Shaw, Pittman, Potts and Trowbridge Augusta, Georgia 30901 1800 M Street, N.W.

Washington, D. C.

20036 t

Mr. G. Bockhold, Jr.

Vogtle Plant Manager Georgia Power Company Route 2, Box 299-A Waynesboro, Georgia 30830 Regional Administrator, Region II U.S. Nuclear Regulatory Comission 101 Marietta Street, N.W., Suite 2900 Atlanta,' Georgia 30323

ENCLOSURE 1 Alternate Equipment List for Vogtle SQRT Audit NSSS Equipment l

Number Equipment Training No.

Description Manufacturer NSSS-1A 11206J6003 Spray Nozzle Spray Engineering NSSS-2A 11204U6090 8" Check Valve Westinghouse and Operator 80P Equipment 80P-1A 116040PCPA Contair. ment Consip Hydrogen Monitor Panel B0P-2A 11821U3001 Safety Features Consolidated Control Safeguard Board BOP-3A 11087Y3IA11 Uninterruptible Elgar Corporation Power Supply

ENCLOSURE 2 ALTERNATE EOUIPMENT LIST FOR V0GTLE PVORT AUDIT B0P EOUIPMENT MASTER LIST PAGE EQUIPMENT TAG NUMBER DESCRIPTION MANUFACTURER SYSTEM 134 11305U4071 16" Check Anchor Darling Condensate Valve and Feed-Water m