ML20210T921
| ML20210T921 | |
| Person / Time | |
|---|---|
| Site: | 07000754 |
| Issue date: | 08/12/1999 |
| From: | Sherr T NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Meyers D NRC OFFICE OF ADMINISTRATION (ADM) |
| Shared Package | |
| ML20210T857 | List: |
| References | |
| NUDOCS 9908190190 | |
| Download: ML20210T921 (2) | |
Text
p
' August 12, 1999 l
f MEMORANDUM TO: David L. Meyers, Chief Regulatory Publications Branch Division of Freedom of information i
and Publication Services
. Office of Administration FROM:
Theodore S. Sherr, Chief Original signed by:
Licensing and intemational Safeguards Branch Division of Fuel Cycle Safety and Safeguards, NMSS -
l
SUBJECT:
FEDERAL REGISTER NOTICE, GENERAL ELECTRIC VALLECITOS LICENSE RENEWAL REQUEST SNM-960 (TAC NO. L31006)'
Attached 'please find one signed original of the subject Federal Reaister Notice for your transmittal to the Office of the Federal Register for publication. Also attached are five additional copies of the signed Notice and a 3.5" diskette with the Nctice in Corel Wordperfect 8.0.
l 1
i Docket 70-754
[
License SNM-960
)
...-Attachments: As stated j
CONTACT:
Andrew D. Rayland NMSS/FCSS.
'i (301)415-8102 Distnbution w/atts l
Docket 70-754 PUBLIC
. NRC File Center LIB R/F l.
. NMSS R/F Madams FCSS R/F Region IV p
[A:\\fr cover to publications.wpd]
4 h
.OFC LIB LIB.
'l,,5 LIB LIB u
NAME ARayland:mb PShea @
CEmeigh TShe f f k 8A /99 8// M T
DATE 8//k99' 8/pd99 l
9908190190 990812 PDR ADOCK 07000754 C
PM 4.
f* **%
4 p o-1 UNITED STATES
' j j
NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 2055EKm01 49.....,o August 12, 1999 MEMORANDUM TO: David L. Meyers, Chief Regulatory Publications Branch Division of Freedom of Information and Publication Services Office of Administration FROM:
Theodore S. Sherr, Chief Licensing and International
~
Safeguards Branch Division of Fuel Cycle Safety and Safeguards, NMSS
SUBJECT:
FEDERAL REGISTER NOTICE, GENERAL ELECTRIC VALLECITOS LICENSE RENEWAL REQUEST SNM-960 (TAC NO. L31006)
Attached please find one signed original of the subject Federal Reaister Notice for your transmittal to the Office of the Federal Register for publication. Also attached are five additional copies of the signed Notice and a 3.5" diskette with the Notice in Corel Wordperfect 8.0.
Docket 70-754 License SNM-960 Attachments: As stated CONTACT:
Andrew D. Rayland NMSS/FCSS (301)415-8102 l
fl 7590-01 NUCLEAR REGULATORY COMMISSION Docket No.70-754 Consideration of License Renewal Request for the General Electric Vallecitos Nuclear Center, and Opportunity for Hearing AGENCY: U.S. Nuclear Regulatory Commission ACTION: Notice of Consideration of License Renewal Request for the General Electric-Vallecitos Nuclear Center and Opportunity for Hearing The U.S. Nuclear R'egulatory Commission is considering renewal of Materials License SNM-960 which was issued to the General Electric Vallecitos Nuclear Center on February 8, 1994. The Materials License is for the operation of their Laboratory and General Services Operations facility in Sunol, California. The renewal application requests authorization to receive and possess special nuclear material and to use special nuclear material in research and development activities involving chemical and physical analysis. The license renewal application is dated January 21,1999, and is available for public inspection at the NRC's Public
. Document Room, the Gelman Building,2120 L Street NW, Washington DC 20555.
Prior to approving the renewal application, NRC will have made findings required by the Atomic Energy Act of 1954, as amended, and NRC's regulations. These findings will be documented in a Safety Evaluation Report. The renewal of the licensee will be documented in the issuance of a renewed SNM-960 license.
The NRC hereby provides notice that this is a proceeding on an application for renewal i
of a license falling within the scope of Subpart L," Informal Hearing Procedure for Adjudication j
in Materials Licensing Proceedings," of NRC's rules and practice for domestic licensing processing in 10 CFR Part 2.' Pursuant to Section 2.1205(a), any person whose interest may l
be affected by this proceeding may file a request for a hearing in accordance with 1
i n n -
m MUEl'1VI W
l i
2 Section 2.1205(d). A request for a hearing must be filed within thirty (30) days of the date of publication of the Federal Realster notice.
The request for a hearing must be filed with the Office of Secretary either:
- 1. By delivery to the Docketing and Service Branch of the Secretary at One White Flint North 11555 Rockville Pike, Rockville, MD 20852-2738; or
- 2. By mail or telegram addressed to the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555. Attention: Docketing and Services Branch.
In addition to meeting other applicable requirements to 10 CFR Part 2 of the NRC's regulations, a request for a hearing filed by a person other than the applicant must describe in detail:
- 1. The interest of the requester in the proceeding;
- 2. How that interest may be affected by the results of the proceeding, including the reasons why the requestor should be permitted a hearing, with particular reference to the factors set out in Section 2.1205(h).
- 3. The requester's areas of concern about the licensing activity that is the subject matter of the proceeding; and l
- 4. The circumstances establishing that the request for a hearing is timely in accordance with j
I Section 2.1205(d).
In accordance with 10 CFR Section 2.1205(f), each request for a hearing must also be served, by delivering it personally or by mail to:
(State Rout 84) Suno, Ca fo a 9458 en i n r Ben urr ;n l
y 4
'f:
A 3
. 2. The NRC staff, by delivering to the Executive Director for Operations, One White Flint North, 11555 Rockville Pike, Rockville, MD 20852, or by mail, addressed to the Executive Director for
~
' Operations, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555.
An'y hearing that is requested and granted will be held in accordance with the NRC's informal Hearing Procedures for Adjustications in Material Licensing Proceedings in 10 CFR
~ Part 2, Subpart L.
For further details with respect to this action see the application for renewal dated January 21,1999. This document is available for public inspection at the NRC's Public Document Room,2120 L Street N.W., Washington, DC 20555. Questions should be referred to the NRC's project manager for the General Electric Vallecitos Nuclear Center, Andrew D.
Rayland, at (301) 415-8102, Dated at Rockville, Maryland, this Iby of August 1999.
FOR THE NUCLEAR REGULATORY COMMISSION
- Theodore S. Sherr, Chief Licensing and Intemational Safeguards Branch Division of Fuel Cycle Safety -
and Safeguards, NMSS Docket 70-754 License SNM-960
,~
L 7
?
3
- 2. The NRC staff, by delivering to the Executive Director for Operations, One White Flint North,
~ 11555 Rockville Pike, Rockville, MD 20852, or by mail, addressed to the Executive Director for Operations, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555.
Any hearing that is requested and granted will be held in accordance with the NRC's Informal Hearing Procedures for Adjustications in Material Licensing Proceedings in 10 CFR Part 2, Subpart L.
For further details with respect to this action see the application for renewal dated January 21,1999. This document is available for public inspection at the NRC's Public Document Room,2120 L Street N.W., Washington, DC 20555. Questions should be referred to the NRC's project manager for the General Electric Vallecitos Nuclear Center, Andrew D.
Rayland, at (301) 415-8102.
I Dated at Rockville, Maryland, this 12 day of August 1999.
FOR THE NUCLEAR REGULATORY COMMISSION Original signed by:
Theodore S. Sherr, Chief Licensing and intemational Safeguards Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-754 License SNM-960 Distribution Docket 70-754 PUBLIC NRC File Center LIB R/F FCSS R/F NMSS R/F Region IV
[G:\\ lib \\fm-ge-cal.wpd]
OFC LIB LIB
,[g LIB,f LIS l
NAME ARayland:N PShe w 5 CEdiigh rdk DATE 8/fD99 8/tL99 8/
99 8/ M09 l
1
-