Provides Status on Facility Containment Safety Study Initiatives,Including Performance Concerns Associated W/ Severe Accidents
ML20210T867
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 02/05/1987
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To: Muller D
Office of Nuclear Reactor Regulation
References
FVY-87-18, NUDOCS 8702180326
Download: ML20210T867 (2)


Text

o.

5 VERMONT YANKEE i

NUCLEAR POWER CORPORATION FVY 87-18 RD 5, Box 169, Ferry Road, Brattleboro, VT 05301 wo.

p ENGINEERING OFFICE 1671 WORCESTER ROAD -

FRAMINGHAM, MASSACHUSETTS 01701 TELEPHONE 6t? aT2-at00 February 5, 1987 U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn:

Office of Nuclear Reactor Regulation Daniel R. Muller, Director BWR Project Directorate #2 Division of BWR Licensing

References:

a)

License No. DPR-28 (Docket No. 50-271) b)

Letter, USNRC to VYNPC, NVY 85-187, dated 8/29/85 c)

Letter, VYNPC to USNRC, FVY 86-30, dated 3/31/86 d)

Letter, VYNPC to USNRC, FVY 86-81, dated 9/2/86 e)

Letter, USNRC to VYNPC, NVY 86-218, dated 10/24/86 f)

Letter, VYNPC to USNRC, FVY 86-117, dated 12/19/86 g)

Letter, VYNPC to USNRC, FVY 86-122, dated 12/19/86

Dear Sir:

Subject:

Vermont Yankee Containment Safety Initiatives - Status Update The purpose of this letter is to provide you with an updated status of Vermont Yankee's Containment Safety Study initiatives.

In our letter of December 19, 1986 [ Reference f)], we provided you with a summary of several of the major analyses and engineering studies initiated by Vermont Yankee to address containment performance concerns associated with severe accidents.

Vermont Yankee's progress to date and current plans [provided the schedular extensions requested in Reference g) are approved] related to these initiatives are as follows:

1.

Vermont Yankee proposes to implement a modification to the plant to insure a reliable and controllable alternate containment spray path.

Generally, this modification will involve providing an alternate source of p wer to four motor-operated valves to allow remote opera-tion of these valves in a station blackout type of scenario. Vermont Yankee will notify you of our schedule to implement this modification and the specific design upon completion of the engineering design effort (July 1987).

8702180326 870205 DR p

ADOCK 05000271

[ 0l PDR 6

' D

d e

l VERMONT YANKEE NUCLEAR POWER CORPORATION r

l U.S. Nuclear Regulatory Commission February 5, 1987 Page 2 2.

Vermont Yankee is continuing analyses and calculations addressing the

. performance characteristien of the diesel fire pump when used to pro-vide water via the service water, RHR service water, and RHR system to

-either the reactor vessel or containment spray header. These results will provide the criteria to determine modifications necessary to ensure the containment spray headers perform when required. Vermont Yankee will notify you of our schedule to implement modifications if required and the specific design upon completion of the engineering design effort (July 1987).

3.

Vermont Yankee proposes to implement a modification to the plant to I

ensure a reliable and controllable vent path from the containment wetwell. Our engineering study evaluating the details of this vent path is progressing on schedule.

The concept presently under eval-uation involves an independent pipe from the wetwell airspace with the appropriate valving and manual control circuitry to allow for ini-tiation and positive termination of venting, if required. Vermont Yankee will notify you of our schedule to implement this modification and the specific design upon completion of the engineering design effort (July 1987).

We trust that this information is of assistance regarding your con-siderations of our letter of December 19, 1986 (Reference g)] which requested modification of certain schedular commitments impacted by our past and con-tinuing safety initiatives. Should you have any questions or require additional information concerning these matters, please contact us.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION Jk/ LM _.

(h4 Warren P. MurpMy Vice President and Manager of Operati ns