ML20210T859
| ML20210T859 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/09/1987 |
| From: | Mcdonald R ALABAMA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20210T864 | List: |
| References | |
| NUDOCS 8702180325 | |
| Download: ML20210T859 (1) | |
Text
.
Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 352910400 Telephone 205 250-1835
-AlabamaPower hWW M2sp nio V ce r sident Docket No. 50-348 10CFR50 Appendix J February 9,1987 i
U. S. Nuclear Regulatory Commission Ai;tention: Document Control Desk Washington, D. C.
20555 Gentlemen:
Joseph M. Farley Nuclear Plant - Unit 1 Reactor Containment Building Integrated Leakage Rate Test Pursuant to the requirements of 10CFR50, Appendix J, Section V.B.
Alabama Power Company herewith submits the Joseph M. Farley Nuclear Plant Unit 1 third periodic Reactor Containment Building Integrated Leakage Rate Test report. This report describes and summarizes the Integrated Leakage Rate Test (ILRT) activities performed as a part of the ten-year ISI work during the Unit 1 seventh refueling outage. This test was completed on November 11, 1986.
Other pertinent report information, including, as applicable, test plans.
and schedules, test results and reports and test methods and procedures is available at Farley Nuclear Plant for review.
If there are any questions, or if additional information is needed, please advise.
Yours truly b
R. P. Mcdonald RPM / STB:cs1/D395 Enclosure cc: Mr. L. B. Long Dr. J. N. Grace, w/1 enclosure Mr. E. A. Reeves Mr. W. H. Bradford p'
l 8702180325 870209 gDR ADOCK 05000348 PDR 3
e