ML20210T781

From kanterella
Jump to navigation Jump to search
Ack Receipt of 870127 Supplemental Response to Violations Noted in Insp Repts 50-321/86-06 & 50-366/86-06.Results of Evaluation Will Be Forwarded Separately
ML20210T781
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/10/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
References
NUDOCS 8702180307
Download: ML20210T781 (1)


See also: IR 05000321/1986006

Text

r

-

o

FE8101987

Georgia Power Company

-

l

ATTN: Mr. James P. O'Reilly

Senior Vice President-Nuclear

Operations.

P. O. Box 4545

Atlanta, GA 30302

>

Gentlemen:

SUBJECT:

REPORT NOS. 50-321/86-06 AND 50-366/86-06

Thank you for your supplemental response of January 27, 1987, to our Notice of

Violation issued on May 28, 1986, concerning activities conducted at your Hatch

facility.

We are in the process of evaluating your response and will inform you

of the results of our evaluation by separate correspondence.

Weappreciateyourcooperationinthismatter.

Sincerely,

J. Nelson Grace

Regional Administrator

cc:

J. T. Beckham, Vice President,

Plant Hatch

H. C. Nix, Site Operations Gereral

Manager

A. Fraser, Acting Site QA: Supervisor

L. Gucwa, Manager, Nuclear Safety

and Licensing

bec: Hugh S. Jordan, Executive Secretary

IE File

NMSS/SGPL

NRR/DL/SSPB

Document Control Desk, 016

NRC Resident Inspector

State of Georgia

RI

RII

-RI

RII

RII

()

l

OnMA

Y

Cur"er RCMb

JPY

OMasny/87k:cdg #DThompson

G ire

ine

02/4

U 02/oV87

02/0h/87

026$/87

02/6/87 02/j/87

r

-

I

RII

RI

RII

RII

ggSTCebter

VBro nlee

Reyes

G

MErnst

02/ /87

02/q /87

02/f/87

02/;g87

02/ /87

ggg21gggg{ 738@

1

,

G

\\ \\

1

I

~ GeCfG a A *ef COPctey

0

,

333 P eQFC*t Ave %7 -

,

,

Ara ta Georg a 103C8 -

-

  • "

4sececne ca 126 *M*

.-

Va 4 og AJa< ass

.k. N a M [ $ 2

ENCLOSURE CONTAINS SAFEGUARDS-INFORMATION

UPUN 5EPARATION THIS PAGE DECONTROLLED

i

James P. O'Reilly

.

3ea or V,ce Prestceat

-

"' O " o"5

SL-1865

0061b

.

,

u

,

January 27, 1987

]

c-

r,

.

cm

..

U.S. Nuclear Regulatory Commission

w.

li

ATTN:

Document Control Desk

%8'

1

y

'

Washington, D.C. 20555

Sz

=

"

e i

NRC DOCKE3 50-321, II 50-366

OPERATING LICENSES DPR-57, II NPF-5

6B

M

EDWIN I. HATCH NUCLEAR PLAN UNITS 1, 2

INSPECTION REPORT 86-06

Gentlemen:

This letter is in response to Inspection Report Nos. 50-321/86-06 and

50-366/86-06 and the Notice of Vi lation, dated May 28, 1986, and the request

for additional information dated December 23, 1986.

The referenced report

relates to an NRC inspection condureted on February 24-28 and March 18-19, 1986,

t

As noted in the response to ;nspection Report 86-37, and as indicated in

previous correspondence

and meetings,

Georgia

Power

Company

(GPC)

has

undertaken numerous security improvements at both Plant Hatch and Plant

Vogtle, and at cur Corporate off-ice to further enhance the Nuclear Security

Program. We specifically wish to note that GPC has created and ful_ly staffed

a

corporate

nuclear

security

orga.nization

that

monitors

and

provides

assistance and direction ' to Plant Security Operations.

The recent Regulatory

Effectiveness Review of Plant Hatch, which concentrated on actual physical

security issues, resulted in a f=avorable p_reliminary report on the security

operation of the plant.

We beliewe this review 'is but another confirmation of

our efforts to achieve excellence and the exemplary results accomplished in

the past year.

-

The Georgia . Power Company does not wish to pursue our request for

mitigation on problems identified in early 1986 any further even though our -

-

view has not changed.

The Georgiu Power Company has Tocused its attention on

excellence

in

1987

and

plans

not

only

to

fully

meet

NRC

security

interpretations and standards inut to exceed them in areas and matters

important to our circumstances and needs.

ENCLOSURE CONT 7AINS SAFEGUARDS INFORMATION

UPUN btPANATILUM IMIb PAUL DEGUMIMULLED

h

-

OPP-

-

-

_

~

.

.:

U.S. Nuclear Regulatory Commissie,

January 27, 1987

Page two

The enclosure addresses additional information related to Violations II.8,

II.D. II.E in Inspection Report 86-06.

The enclosures contain safeguards

information and should be withheld from public disclosure in accordance with

the requirements of 10 CFR 2.790(d) and 10 CFR 73.21.

GEORGIA POWER COMPANY

By:

m k. LOM. I d .

Ja s P. O'Reilly

MJB/sjb

Enclosure

c: w/o Enclosure

Geortia Power Company

U S. Nuclear Regulatory Commission

Mr. U. T. Beckham, Jr.

Regional Administrator, Region II

Plant Hatch Senior Resident Inspector

_

O

e

f

e

4p

e

ENCLOSURE CONTAINS SAFEGUARDS INFORMATION

UPUM btPANAllUM IMIb PAGt Ib ULLUMIMULLLU

i

.