ML20210T568
| ML20210T568 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/29/1997 |
| From: | Hebdon F NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20210T573 | List: |
| References | |
| NUDOCS 9709150228 | |
| Download: ML20210T568 (6) | |
Text
Parog g
t UNITED STATE 8 u
E NUCLEAR REGULATORY COMMISSION D
E WASHINGTON, D.C. sotaHoot
\\**.*/
FLORIDA POWER CORPORATION CITY OF ALACHUA (ITY OF BUStiNELL
{JTY OF GAINESVILLE CITY OF KISSIMMEE CITY OF LEESBURG CITY OF NEW SMYRNA BEACH AND UTILITIES COMMISSION. CITY OF NEW SMYRNA BEACH CITY OF OCALA ORLANDO_ UTILITIES COMMISSION AND CITY OF ORLANDO SEli1N0LE ELECTRIC COOPERATIVE. INC.
CITY OF TALLAHASSEE DOCKET NO. 50-302 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT l
AMENDMENT TO FAClllTY OPERATING LICENSE Amendment No.157 License No. DPR-72 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The a> plication for amendment by Florida Power Corporation, et al.(tie licensees) dated August 4,1997, as supplemented August 16, 1997, complies with the standards and requirements of the Atomic Energy Act of 1954, at +; ended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the nealth and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9709150228 970829 PDR ADOCK 05000302 P
_j
. 2.
Accordin 1, the license is amended to allow a temporary change to the i
Technica { pecification Surveillance Requirement 3.3.8.1 frequency as indicated in the attachment to this license amendment.
Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. g7 are hereby incorporated in the license.
Florida Power Corporation shall operate the 'Tacility in accordance with the Technical Specificationr..
3.
This license amendment is effective as of its date of issuance and shall be implemented within 5 days.
FOR THE NUCLEAR REGULATORY COMMISSION 0
.Y Frederick J. Heb on, Director
[
Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation l
Attachment:
Changes to the Technical Specifications Date of Issuance: August 29, 1997 t-
ATTACHMENT TO LICENSE AMENDMENT N0.157 FACILITY OPERATING LICENSE NO. OPR-72 DOCKET NO. 50-302 Replace the followin the attached pages. gJages of the Appendix "A" Technical Specifications withT1e revised pontain vertical lines indicating the area of change.
The corresponding spillover page is also provided to maintain document completeness.
Remove Insert 3.3-21 3.3-21 B 3.3-71 B 3.3-71 B 3.3-72 B 3.3-72*
a
EDG LOPS-3.3.8 i
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.8.1
NOTE--------------------
When EDG LOPS instrumentation'is placed in an inoperable status solely for performance of this Surveillance,-entr3 into associated Conditions and Required Actions may be delayed as follows: (a) up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for the degraded voltage Function, and (b) up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for the loss of voltage Function, provided the two channels monitoring the Function for the bus are OPERABLE or tripped.
Perform CHANNEL FUNCTIONAL TEST.
31 days D.B
..---NOTE-----
Not effective-after November 23, 1997.
60 days SR 3.3.8.2
NOTE--------------------
Voltage sensors may be excluded from CHANNEL CALIBRATION.
)
Perform CHANNEL CALIBRATION with setpoint 18 months Allowable Value as follows:
a.
Degraded voltage 2 3933 and s 3970 V with a time delay of 5.0 seconds i 0.5 seconds; and -
b.'
Sudden loss' of voltage from full voltage to 0.0 V with a time delay of 7.8 seconds 0.55 seconds at 0.0 V.
Crystal River Unit 3 3.3-21 Amendment No. 157
=.
EDG LOPS B 3.3.8 BASES ACTIONS C.d 1
(continued)
I Condition C is the default Condition should Required Action A.1 or B.1 not be met within the associated Completion Time.
Required Action C.1 ensures that Required Actions for affected diesel generator inoperabilities are initiated.
Depending on MODE, the Actions specified in LCO 3.8.1, "AC Sources-Operating," or LCO 3.8.2, are required to be entered immediate y.
1 SURVEILLANCE 1R 3.3.8.1 REQUIREMENTS l
A CHANNEL FUNCTIONAL TEST is performed on each required EDG LOPS channel to ensure the entire channel will perform the intended function. This test ensures functionality of each channel to output relays.
The Frequency of 31 days is considered reasonable based on the reliability of the components-and on operating experience.
A temporary extension of the frequency has been made to indicate "31 days or 60 days" as the frequency. This temporary condition applies-to a.one-time performance of the surveillance on each diesel generator and will not be effective after November 23, 1997.- The need for this temporary extension of the frequency became evident during replacement of the radiator on the EDGs.
This activity had a minimum duration of 42 days, which was in excess of-the 31-day frequency. Performance of the surveillance on one EDG with the other EDG inoperable because of the radiator replacement was considered as not the safest and most prudent course of action. A note has been added to the frequency to indicate that the 60-day frequency is not effective. after November 23, 1997.
A Note has been added to allow performance of the SR without taking the ACTIONS for an inoperable instrumentation channel' although during this time period the relay instrumentation cannot-initiate a diesel start. This allowance is based on the assumption that-4 hours is the average time required to perform channel Surveillance. The 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> testing allowance does not significantly reduce the availability of the-EDG.
(continued)
Crystal River Unit 3 B 3.3-71 Amendment No. 157
EDti LOPS B 3.3.8
'(
BASES SURVEILLANCE REQUIREMENTS A CHANNEL CALIBRATION is a complete check of the instrument channel, including the sensor. The setpoints and the response to a loss of voltage and a degraded voltage test shall include a single point verification that the trip occurs within the required delay time, as shown in Reference 2.
The 18 month Frequency is based on operating experience and industry-accepted practice.
A Note has been added indicating the voltage sensing device (bus potential transformer since these transformers ar)e passive, inherently stablemay be exc devices which cannot be calibrated.
In the event of l
transformer failure, the corresponding degraded voltage or
. loss of voltage relays would trip on low voltage, actuating the associated channel condition. In addition,(i.e., the channels fail in the safe transforme)r or associated circuits would be provided via theannu l
channel monitor relay, identifying to-the operator a failure 1
within the loss of voltage or degraded voltage channels.
REFERENCES 1.
FSAR, Chapter 14, 2.
FSAR, Section 8.3.
q
+
Crystal River Unit 3 B 3.3-72 Amendment No. 157-l 1