MONTHYEARPNO-II-99-045, on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph1999-10-18018 October 1999 PNO-II-99-045:on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph IR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph1999-09-15015 September 1999 PNO-II-99-037D:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph PNO-II-99-037E, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037E:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037F, on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037F:on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037H, on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph1999-09-15015 September 1999 PNO-II-99-037H:on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph PNO-II-99-037G, on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph1999-09-15015 September 1999 PNO-II-99-037G:on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph PNO-II-99-035, on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 9908311999-08-31031 August 1999 PNO-II-99-035:on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 990831 PNO-II-99-033, on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained1999-08-30030 August 1999 PNO-II-99-033:on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support ML20198P0261998-12-21021 December 1998 Notice of Violation from Insp on 981011-1121.Violation Noted:On 981030,licensee Failed to Correctly Shutdown & Verify That Unit 1 Standby Gas Treatment Sys in Standby Alignment Per Section 7.1 of Procedure 1OP-10 IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp PNO-II-98-050, on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary1998-11-24024 November 1998 PNO-II-98-050:on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20195G4191998-11-0909 November 1998 Notice of Violation from Insp on 980830-1010.Violation Noted:On 980916,licensee Failed to Perform Section 7.1.5 of Procedure OMST-RHR-28Q as Required When Returning Flow Transmitter E11-FT-3338 to Service IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-039D, on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens1998-08-27027 August 1998 PNO-II-98-039D:on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens PNO-II-98-039C, on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility1998-08-27027 August 1998 PNO-II-98-039C:on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility PNO-II-98-039B, on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported1998-08-26026 August 1998 PNO-II-98-039B:on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported PNO-II-98-039A, on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area1998-08-26026 August 1998 PNO-II-98-039A:on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area PNO-II-98-039, on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site1998-08-25025 August 1998 PNO-II-98-039:on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20237B9211998-08-11011 August 1998 Notice of Violation from Insp on 980607-0718.Violation Noted:Licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Documented Instructions in Procedures for Listed Examples IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236N9451998-07-0606 July 1998 Notice of Violations from Insp on 980426-0606.Violations Noted:On 980521,licensee Made Temporary Procedure Change That Altered Intent of Maint Surveillance Test 1MST-DG11R, DG-1 Loading Test,By Substituting 25 for 50 Horsepower Load IR 05000324/19983001998-06-15015 June 1998 NRC Operator Licensing Exam Repts 50-324/98-300 & 50-325/98-300 on 980508-15.Six SRO & Four RO Candidates Tested.All Passed Exam.One Candidate Identified as Having Some Performance Weaknesses ML20249A2191998-06-0101 June 1998 Notice of Violation from Insp on 980315-0425.Violation Noted:On 980331 Licensee Failed to Accomplish Scaffolding Erection Activities in Accordance W/Documented Procedure OMMM-022 IR 05000324/19980051998-06-0101 June 1998 Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing ML20216H4341998-04-16016 April 1998 Notice of Violation from Insp on 980209-13,0309-12 & 16-20. Violation Noted:On 970603,licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Procedure EGR-NGGC-0005 IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8011998-03-16016 March 1998 Notice of Violation from Insp on 980126-30.Violation Noted: Rev 46 to Licensee Emergency Plan Decreased Effectiveness of Plan That Adopted Regulatory Provision for Biennial Exercise ML20217C8061998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise ML20216B1741998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20216B1621998-03-0202 March 1998 Notice of Violation from Insp on 971228-980131.Violation Noted:On 971203 & 971230,for Unit 1 & 971203,971210 & 971220 & 980104 for Unit 2,Condition Repts Were Not Initiated to Address Repetitive Failures of Plant Computer ML20202D3161998-02-0505 February 1998 Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123 IR 07100109/20120271998-01-23023 January 1998 Notice of Violation from Insp on 971109-1227.Violation Noted:On 971209,inspector Determined That Licensee Had Not Maintained Data Sheets or Logs for Equipment Alignment ML20199G7501998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps ML20198N6461997-12-30030 December 1997 Notice of Violation from Insp on 971209-12.Violation Noted: on 971118,locked High Radiation Area Was Left Unattended & Entrance Was Not Secured W/Designated Special cal-core Locks Prior to Leaving Area Unguarded ML20198N6561997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20198P0561997-12-23023 December 1997 NOV from Insp Completed on 971113.Violation Noted:Licensee Failed to Promptly Correct Condition Adverse to Quality Re Unit 1 High Drywell Temp Condition ML20197H1691997-12-0808 December 1997 Notice of Violation from Insp on 970928-1108.Violation Noted:On 970923,torus Master clearance,2-97-555 Was Not Adequate to Prevent Draining of Water Into Unit 2 Torus 1999-09-15
[Table view] |
Text
-
1
w- . -- -w p CASE No. 2-96-036
,s>nm, e% s,' '. -
United States ki $
Nuclear Regulatory Commission \,,,,,/
. = .-
Report of Investigation BRUNSWICK STEAM ELECTRIC PLANT:
DISCRIMINATION AGAINST EQUIPMENT QUALIFICATION (EQ) ENGINEER FOR RAISING TECHNICAL CONCERNS REGARDING EO. PRACTICES Office of Investigations
.j ,
Reported by 01:
Ril EHCLOSURE l 9709150160 970529 PDR ADOCK 05000324 G PDR
7
,.~ --
Title:
BRUNSWICK STEAM ELECTRIC PLANT:
DISCRIMINATION AGAINST EQUIPMENT QUALIFICATION (EQ) ENGINEER FOR RAISING TECHNICAL CONCERNS REGARDING EQ PRACTICES Licensee: Case No.: 2 96 036 2C~/"
Carolina Power and Light Company Report Date: May 29, 1997 P.O._ Box 1551 Raleigh, North Carolina 27602 ,
Control Office: 01:RII Docket Nos,:
., . 50 324: 50 325 Status: CLOSED Reported by: Reviewed and Approved by:
/ .
VICW7& ,
\
d,afry'L, Jcbinson, Sp'ecial Agenf William J. McNJ1ty, Director \
Office of Investigations Office of Investigations }
Field Office, Region II Field Office, Region II q
i THE! CONTENTS OF/THIS REPORT QF INVESTIhATION OLffSIDE NRC WITHOUT AUTHORITY OF JHE APPROVING OFFICIAL Off THIS REPORT. UNAlRHORIZED DISCLOSURE MAY RESULT [N ADVERSE ADMINISTRAVVE'. ACTION AND/0R CRTHINAL- P ' ECUTION, y/--
(APPROVED FOR RELEASE _0N AUGUST 29,.1997)
m n
SYNOPSIS The Office of Investigations (01), U.S. Nuclear Regulatory Commission, Region II, initiated this investigation on September 26, 1996. An Equipment Qualification (E0) engineer, employed by Carolina Power and Light Company (CP&L) at the Brunswick Steam Electric Plant, alleged that he had received an adverse performance appraisal and had been subjected to a hostile working environment because he had identified E0 deficiencies to his CP&L supervision and management, and had highlighted some of these deficiencies as being violations of regulatory requirements.
01's efforts to accom)lish a voluntary interview of this engineer, both directly and through ais attorney, were unsuccessful. OI obtained and reviewed documentation of investigations of this issue conducted by the Wage
'~ ~
' and Hour Division of the Department of Labor and by the Office of General Counsel, CP&L. OI determined that this documentation was adecuate in scope, and contained sufficient evidence to reach a conclusion regarcing this engineer's allegation.
Based on 01's review of the evidence obtained in this matter, it is concluded that the allegation of discrimination is unsubstantiated.
[ f N0b.PUBLIC DISCEOSURE WIUiOUT~APPROVA Fi1 ELD OFFICE DIRECTOR,, OFFICE: OF INVESTIGATIONSp 4 O V V V , REGIONNII V G Case No. 2 96 036 1 J
~
,~ p t
i i
Tills PAGE LEFT BLANK INTENTIONALLY MOT FOR4DEUC DISCLOSUREsWITFIOUVAWROVAL 0%
IELD O y E'DIRECTO jRFFICE OF ESTIGATI0gREGIONIIN Case No. 2 96-036 2
~ ' ' ' ' ' - - - - - - '
' ~
('
TABLE OF CONTENTS Ea99 SYN 0PSIS................................................................. 1 DETAILS OF INVESTIGATION................................................. 5 Appl i ca bl e Regul ati ons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Pur>ose of Investigation........................................... 5 12
- Bactground........................:.'............................... 5 Efforts to Conduct Voluntary Interview of Alleger. . . . . . . . . . . . . . . . . . 5 Evidence...........................................................
Review of DOL Wage and Hour Division Investigation...........
6 6
Review of CP&L Office of General Counsel Inv 6 Concl usi on . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..................
. . . . . . . . esti gati on 6
SUPPLEMENTAL INFORMATION................................................. 7 LIST OF EXHIBITS......................................................... 9 i
i I
~
AQT FORJUBLICTISCLOSUREWHOUT APPROVAL 0F G JIELDOFF{CEDIRECTOR.OyICEOFINVESTIGATIONS.REGIONI(
v Case No. 2 96 036 3
p.
1 TlilS PAGE LEFT Bl>WK INTENTIONALLY
^
OT FOR PUBLICtISCLOSURE WI,TliOUT' APPROVAL %
FJE OFFICE (DI3ECTOR,OFFICEOpINVESTIGAT,I0NS,REGIONII/q-Case No. 2-96 036 4
DETAILS OF INVESTIGATION Applicable Re.gulatiolts Allegation: Alleaed Discrimination Acainst Eauipment Qualification (EO)
Engineer for Raisina Technical Concerns Recardina E0 Practices 10 CFR S 50.7: Employee protection 10 CFR S 50.5: Deliberate misconduct '
Purpose of Investiaation The Office of Investigations (01), U.S. Nuclear Regulatory Commission (NRC),
. _ _ . Region II (RII), initiated this investigation on September 26, 1996 (Exhibit 1), to determine if Maged F, GABALLA, Equipment Qualification (EQ)
Engineer at Carolina Power and Light Company's (CP&L) Brunswick Nuclear Plant (BNP) had received an adverse >erformance appraisal and had been subjected to a hostile working environment aecause he had identified EQ deficiencies to his CP&L supervision and management, and had highlighted some of these
- deficiencies as being violations of regulatory requirements.
I Backaround l On April 10, 1996, GABALLA's attorney, David K. COLAPINTO, of the Law Firm of i
Kohn, Kohn & Colapinto, contacted the hotline of the NRC Office of Inspector General and alleged the aforementioned discrimination, and EQ deficiencies at BNP, on behalf of his client. On May 1, 1996, this information was referred to RII for disposition. 01 initiated this investigation of the discrimination, and the RII inspection staff addressed the technical EQ issues. On May 15,1996, COLAPINTO filed GABALLA's discrimination complaint with the Wage and Hour Division of the Department of Labor (DOL), On July 7, 1996, COLAPINTO filed an amendaent to GABALLA's DOL complaint with the provision of clarifying information regarding the allegedly adverse performance appraisal.
Efforts to Conduct Voluntary Interview of Alleaer Numerous efforts by OI to contact GABALLA telephonically at both his place of employment and residence, in an effort to schedule an interview, were unsuccessful. Several 01 contacts with the Kohn, Kohn & Colapinto Law Firm, for the same purpose, were also unsuccessful. Finally, OI sent a certified letter (Exhibit 2) to GABALLA, requesting that he contact OI within 10 days of his receipt of the letter if he had any information regarding his allegation beyond that contained in his DOL complaints and DOL interview. GABALLA received this letter on April 8,1997 (Exhibit 3), and did not contact OI with any additional information. On April 29, 1997, Joyce CLARA, contacted 01 telephonically, identified herself as an associate of COLAPINTO, and requested that 01 not "close the case' on GABALLA.
[NOT FOR BUBCICSISCLOSURE11T110lR APPROVAL/1Fi
,, FIELD OFQC,EAIRECTOR.
E EICE OF INVES yTIONS, REG 3 H Case No. 2 96 036 5
4 CLARA made no effort to schedule an 0I interview of GABALLA, and was not certain that GABALLA could provide any additional clarifying information. The DOL interview report of GABALLA is Exhibit 4.
~ Evidence Review of DOL Waoe and Hour Division Investicatior OI obtained the DOL Wage and Hour Report of Investigation, and associated exhibits, from the DOL office in Raleigh, ' North Carolina. 01 review of this Reaort of Investigation of GABALLA's complaint (Exhibit 5), and the supporting ex11 bits determined that no supplemental investigation by OI was necessary, and that the evidence obtained during the DOL investigation was sufficient to support a conclusion regarding the allegation in this 01 case. The exhibits to the 00L investigation are available for review in the 01:RII- case file upon
~
request.
Rgview of CP&L Office of General Counsel Investiaation 01 also obtained a Report of Investigation of GABALLA's allegation, conducted under the auspices of the Office of General Counsel, CP&L (Exhibit 6). This report was obtained from the CP&L- Office of General Counsel, located at CP&L
corporate headquarters, Raleigh, North Carolina. OI review of this report and supporting exhibits provided supplemental evidence for 01 consideration in its conclusion regarding the allegation in this case. - As with the DOL' exhibits, the exhibits to this CP&L report are also available for review upon request.
Conclusion Based on 01's review of the evidence obtained in this matter, it is concluded that the allegation of discrimination is unsubstantiated.
^
NOT FOR,PtJBEIC DISCLOStlRE WITliolfT,APPF0 VAL OP 7 FIELD ICf? DIRECT ICE O ESTIGATIONSfGIONII j Case No.- 2 96 036 6
SUPPLEMENTAL INFORMATION The findings of the DOL Wage and Hour investigation, as documented by the September 4,1996, letter from the Assistant District Director, DOL Wege and Hour Division to COLAPINTO (Exhibit 7), were appealed by GABALLA, As of the date of this Report of Investigatiori, a final decision has not been issued by the DOL Administrative Law Judge.
l ,. Y ,
l_ -
OOT FOR EUBLIC,'DISCLOSufEWITHOUT4fMVALAQ
/ FIELD DEEICE4RECTOgRICE OFySTIGATy/REGIONp Case No. 2-96-036 7
O P
e THIS PAGE LEFT BLANK INTEfffl0NALLY i
M FOR PUBLiCTISCLOSURF WITHOUT APPROVAL 1h IONS, REGION
,, FIELD O g DIRECTOR, 3 CE'0F IN ,
Case No. 2-96-036 8
r p LIST OF EXHIBITS Exhibit No. Description 1 Investigation Status Record, dated September 26, 1996.
2 Letter from 01:RII to GABALLA, dated April 3, 1997.
3 Copy of Return Receipt, showing receipt of Exhibit 2, April 8, 1997.
4 DOL Personal Interview Statement, dated July 6,1996.
5 DOL Wage and Hour Report of Investigation, dated August 30, 1996.
6 CP&L Report of Investigation, dated May 20, 1996.
7 DOL Letter to COLAPIni0, dated September 4, 1996.
NOT FOR PUBLIC4ISCLOSURE)lMN0 TIT APPROVAL--OFs FIELD OFFICE OIRECTOR OFFICE,0F INVESTIGATIONS, REGIDN Q ~
j V U V ~
Case No. 2-96 036 9
.k