MONTHYEARML20134P9801996-11-26026 November 1996 Summary of 961023 Meeting W/Util to Discuss Construction Permit Termination.List of Attendees & Agenda Encl ML20247C4281989-05-17017 May 1989 Summary of 890111 Meeting W/Util in Rockville,Md Re Geoscience Program for Facility.Attendance List & Slide Presentation Encl ML20235P6361989-02-14014 February 1989 Summary of 890112 Meeting W/Util,Ebasco Svcs,Inc & Impell Corp in Rockville.Md Re Safe Shutdown Impoundment Deconvolution Analysis Issue for Plant.Attendees List & Viewgraphs Encl ML20151Z8611988-04-27027 April 1988 Summary of 880405 Meeting W/Util in Rockville,Md Re Geoscience Issues for Plant.Viewgraphs & Attendance List Encl ML20149E0521988-01-20020 January 1988 Summary of 871215 Meeting W/Util in Bethesda,Md Re Soil Structure Interaction/Deconvolution Analysis.List of Attendees & Viewgraphs Encl ML20236N3741987-08-0303 August 1987 Summary of 870708 Meeting W/Util in Bethesda,Md to Hear & Discuss Util Response to NRC Questions Q231.1,Q231.2,Q231.3, Q231.4,Q231.5 & Q231.7.List of Attendees & Viewgraphs Encl ML20203L8551986-08-25025 August 1986 Trip Rept of Plant Readiness Review Meeting in Walnut Creek, CA on 860801.Attendance List Encl ML20154D1881986-02-26026 February 1986 Summary of 860213 Meeting W/Util in Bethesda,Md Re Status/ Progress Rept on Engineering Assurance Program (Design Review).Presentation Included Difficulties in Establishing Documentation Data Base for Plant.Viewgraphs Encl ML20209F9831985-07-17017 July 1985 Trip Rept of 850701-02 Visit to Facility to Familiarize NRC W/Plant,Status & Methods Being Used to Preserve Equipment.Meeting Agenda & Viewgraphs Encl ML20128M1931985-05-16016 May 1985 Summary of 850430 Meeting W/Util Re Design Readiness Review Program Proposed for Implementation Beginning Jul 1985 & Jul 1986 for Units 3 & 1,respectively.Meeting Attendees list,near-term Activities List & Schedule Encl ML20098D1991982-04-23023 April 1982 Summary of 820423 Special Meeting of WPPSS Executive Board in Richland,Wa Re Financial Problems W/Continued Const of Facilities.Notices of Adjournment Encl ML20098D1371982-04-23023 April 1982 Summary of 820423,28 & 29 Regular Meetings of WPPSS Board of Directors in Richland,Wa Re Units 4 & 5 Termination Program, Claim Vouchers & BPA Finance Proposal.Notice of Adjournment for 820423 Meeting Encl ML20098D1121982-04-0505 April 1982 Summary of 820405 Special Meeting of WPPSS Executive Board in Richland,Wa Re Status of Projects,Selection of Cost Effectiveness Study Consultant,Bpa Draft Power Load Forecast & Units 4 & 5 Termination Program ML20210S5771978-03-16016 March 1978 Trip Rept of 780309 Site Visit to Inspect Faults Uncovered in Unit 3 Excavation Site.Site Originally Inspected for Faults on 771026.Description of Inspected Areas Provided. Further Mapping of Trenches Forthcoming.W/O Stated Encls ML20214G8141977-11-22022 November 1977 Summary of 771116-17 Meetings W/Washington Energy Facility Site Evaluation Council in Richland,Wa Re Status of Plant & Impact of Aid to Mitigate Socioeconomic Impacts Resulting from Plant Const ML20210S5081977-11-16016 November 1977 Summary of 771108 Meeting W/Util & Legal Consultant to Review Status of Cps.Info Re 771103 Site Visit & Insp of Unit 3 Excavation Site Faults Provided.Lists of Key Milestone Dates & Meeting Attendees Encl ML20210S4901977-11-0303 November 1977 Trip Rept of 771026 Site Visit & Insp of Faults Discovered in Unit 3 Excavation Site.Faults 1-3 & 2 Considered Incapable.Decision on Capability Reserved Until Addl Info Received & Site Inspected Again ML20210S6241977-09-28028 September 1977 Summary of 770915 Meeting W/Wppss & Ebasco to Discuss Draft Responses to NRC 770629 Request for Addl Info Re Fire Protection Program ML20210S8531976-03-16016 March 1976 Summary of ACRS 760304 Meeting to Consider CP Application. Seismic Concerns & Exclusion Area Control Discussed.Agenda Encl ML20210S8631976-03-16016 March 1976 Summary of ACRS Subcommittee 760224 Meeting in Richland,Wa, to Discuss CP Application.Attendance List Encl ML20210T1491975-11-19019 November 1975 Summary of 751022-23 Meetings W/Util & Ebasco in Bethesda,Md to Discuss Util 751002 Proposed Design Changes.List of Attendees & Info Re Cost Reduction Program Encl ML20210T1571975-11-0707 November 1975 Summary of 751002 Meeting W/Util,Ebasco & C-E in Bethesda,Md Re Outstanding Items in NRC Review of CP Application.List of Attendees Encl ML20210T1641975-10-17017 October 1975 Summary of 751001 Meeting w/util,EBASCO,C-E,Conner & Knotts & Woodward-Clyde in Bethesda,Md Re Util Proposed Design Changes to Reduce Costs.Agenda & List of Attendees Encl ML20210T2351975-09-0202 September 1975 Summary of 750804 Site Visit & ACRS Subcommittee Meeting W/Util,Ebasco & Woodward-Clyde Assoc Re CP Application. Agenda & List of Attendees Encl ML20210S8831975-07-0303 July 1975 Summary of 750612 Meeting W/Util & Ebasco in Bethesda,Md Re Proposed Groundwater Drainage Sys Design & LOCA Dose Calculations.Staff Concern Re Failure of Tank Containing Radioactive Liquid Expressed.Attendee List Encl ML20210S9541975-06-0606 June 1975 Summary of 750506 Meeting W/Ebasco Re Tornado Missile Protection Approaches for Plants.Attendance List Encl ML20198G4481975-05-14014 May 1975 Summmary of 750225 Meeting W/Wppss,Ebasco & C-E in Bethesda, MD to Discuss Proposed Rev to Design of Ultimate Heat Sink ML20210T4171975-03-14014 March 1975 Summary of 750225 Meeting W/Util & C-E in Bethesda,Md Re Proposed Rev to Design of UHS for Facility.List of Attendees & Documentation Encl ML20198G4551975-03-13013 March 1975 Summary of 750225 Meeting W/Wppss & Ebasco in Bethesda,Md, to Discuss Groundwater Drainage Sys ML20210T3051975-01-24024 January 1975 Summary of 750109 Meeting W/Util & Ebasco in Bethesda,Md Re Response to NRC Request for Addl Info.List of Attendees & Agenda Encl ML20198G5621975-01-24024 January 1975 Summary of 750109 Meeting W/Wppss & Ebasco in Bethesda,Md to Discuss Responses to NRC Requests for Addl Info. Attendance List & Agenda Encl ML20198G5801975-01-21021 January 1975 Summmary of 741220 Meeting W/Wppss,Ebasco & Woodward-Clyde in Bethesda,Md to Discuss Landslides & Slope Stability ML20210T0581974-12-12012 December 1974 Summary of 741119 Meeting W/State of Wa Geological Survey & Dept of Highways in Olympia,Wa Re Slope Stability & Existing Landslides in Area Near Proposed Facility Site.List of Attendees Encl ML20198F0801974-11-24024 November 1974 Summary of 741114 Meeting W/Potential Intervenor DF Finn in San Francisco,Ca to Discuss Issues of Mutual Interest Re CP Applications ML20210T0121974-11-11011 November 1974 Summary of 741104 Meeting W/Util,Ebasco & C-E in Bethesda,Md Re NRC Position on Auxiliary Feedwater Sys Design.List of Attendees Encl ML20210T0081974-11-11011 November 1974 Summary of 741024 Meeting W/Util,Ebasco & Woodward-Lundgren in Bethesda,Md Re Slope Stability & Landslides in Site Area. List of Attendees & Diagrams Encl ML20198G6631974-11-11011 November 1974 Summary of 741029 Meeting W/Wpps,Ebasco & Woodward-Lundgren in Bethesda,Md,To Discuss Slope Stability & Landslides ML20198G7381974-10-17017 October 1974 Trip Rept of 740916 Visit to Plant Site to Inspect Meteorological Program ML20210S9751974-10-17017 October 1974 Trip Rept of 740916 Site Visit to Inspect Meteorological Program & to Discuss Items of Concern ML20198G7871974-10-0202 October 1974 Rept of 740946-17 Visit to Plant Site to Discuss Site Safety.Addl Documentation Encl ML20198G8331974-09-30030 September 1974 Summary of 740917 Meeting W/State of Wa in Olympia,Wa to Discuss Earthquakes & Faulting in Lower Puget Sound Region. Attendance List Encl ML20198G7231974-09-30030 September 1974 Trip Rept of 740916 Visit to Site to Discuss Questions Re Seismology,Hydrology,Meteorology,Radiological Assessment & Accident Analysis ML20198G8151974-09-30030 September 1974 Summary of 740920 Meeting w/WPPSS,C-E & Ebasco to Discuss first-round Questions Re QA Mechanical Engineering & Effluent Auxiliary Power & Conversion & Containment Sys ML20210T3431974-09-30030 September 1974 Summary of 740920 Meeting W/Util,Ebasco & C-E to Discuss Draft First Round Questions Re QA Mechanical Engineering & Effluent,Auxiliary & Power Conversion & Containment Sys. Attendance List & Agenda Encl ML20210T3381974-09-30030 September 1974 Summary of 740917 Meeting W/State of Wa Dept of Natural Resuouces,Earth Sciences Div in Olympia,Wa to Discuss Earthquakes & Faulting in Lower Puget Sound Region of State. Attendance List Encl ML20198G7601974-09-27027 September 1974 Rept of 740916 Visit to Plant Site to Discuss Hydrologic Concerns ML20210T1141974-09-24024 September 1974 Trip Rept of 740903-05 Site Visit to Examine Site & Discuss Questions Re Geology.Agenda & Attendance List Encl 1996-11-26
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20134P9801996-11-26026 November 1996 Summary of 961023 Meeting W/Util to Discuss Construction Permit Termination.List of Attendees & Agenda Encl ML20247C4281989-05-17017 May 1989 Summary of 890111 Meeting W/Util in Rockville,Md Re Geoscience Program for Facility.Attendance List & Slide Presentation Encl ML20235P6361989-02-14014 February 1989 Summary of 890112 Meeting W/Util,Ebasco Svcs,Inc & Impell Corp in Rockville.Md Re Safe Shutdown Impoundment Deconvolution Analysis Issue for Plant.Attendees List & Viewgraphs Encl ML20151Z8611988-04-27027 April 1988 Summary of 880405 Meeting W/Util in Rockville,Md Re Geoscience Issues for Plant.Viewgraphs & Attendance List Encl ML20149E0521988-01-20020 January 1988 Summary of 871215 Meeting W/Util in Bethesda,Md Re Soil Structure Interaction/Deconvolution Analysis.List of Attendees & Viewgraphs Encl ML20236N3741987-08-0303 August 1987 Summary of 870708 Meeting W/Util in Bethesda,Md to Hear & Discuss Util Response to NRC Questions Q231.1,Q231.2,Q231.3, Q231.4,Q231.5 & Q231.7.List of Attendees & Viewgraphs Encl ML20154D1881986-02-26026 February 1986 Summary of 860213 Meeting W/Util in Bethesda,Md Re Status/ Progress Rept on Engineering Assurance Program (Design Review).Presentation Included Difficulties in Establishing Documentation Data Base for Plant.Viewgraphs Encl ML20128M1931985-05-16016 May 1985 Summary of 850430 Meeting W/Util Re Design Readiness Review Program Proposed for Implementation Beginning Jul 1985 & Jul 1986 for Units 3 & 1,respectively.Meeting Attendees list,near-term Activities List & Schedule Encl ML20214G8141977-11-22022 November 1977 Summary of 771116-17 Meetings W/Washington Energy Facility Site Evaluation Council in Richland,Wa Re Status of Plant & Impact of Aid to Mitigate Socioeconomic Impacts Resulting from Plant Const ML20210S5081977-11-16016 November 1977 Summary of 771108 Meeting W/Util & Legal Consultant to Review Status of Cps.Info Re 771103 Site Visit & Insp of Unit 3 Excavation Site Faults Provided.Lists of Key Milestone Dates & Meeting Attendees Encl ML20210S6241977-09-28028 September 1977 Summary of 770915 Meeting W/Wppss & Ebasco to Discuss Draft Responses to NRC 770629 Request for Addl Info Re Fire Protection Program ML20210S8531976-03-16016 March 1976 Summary of ACRS 760304 Meeting to Consider CP Application. Seismic Concerns & Exclusion Area Control Discussed.Agenda Encl ML20210S8631976-03-16016 March 1976 Summary of ACRS Subcommittee 760224 Meeting in Richland,Wa, to Discuss CP Application.Attendance List Encl ML20210T1491975-11-19019 November 1975 Summary of 751022-23 Meetings W/Util & Ebasco in Bethesda,Md to Discuss Util 751002 Proposed Design Changes.List of Attendees & Info Re Cost Reduction Program Encl ML20210T1571975-11-0707 November 1975 Summary of 751002 Meeting W/Util,Ebasco & C-E in Bethesda,Md Re Outstanding Items in NRC Review of CP Application.List of Attendees Encl ML20210T1641975-10-17017 October 1975 Summary of 751001 Meeting w/util,EBASCO,C-E,Conner & Knotts & Woodward-Clyde in Bethesda,Md Re Util Proposed Design Changes to Reduce Costs.Agenda & List of Attendees Encl ML20210T2351975-09-0202 September 1975 Summary of 750804 Site Visit & ACRS Subcommittee Meeting W/Util,Ebasco & Woodward-Clyde Assoc Re CP Application. Agenda & List of Attendees Encl ML20210S8831975-07-0303 July 1975 Summary of 750612 Meeting W/Util & Ebasco in Bethesda,Md Re Proposed Groundwater Drainage Sys Design & LOCA Dose Calculations.Staff Concern Re Failure of Tank Containing Radioactive Liquid Expressed.Attendee List Encl ML20210S9541975-06-0606 June 1975 Summary of 750506 Meeting W/Ebasco Re Tornado Missile Protection Approaches for Plants.Attendance List Encl ML20198G4481975-05-14014 May 1975 Summmary of 750225 Meeting W/Wppss,Ebasco & C-E in Bethesda, MD to Discuss Proposed Rev to Design of Ultimate Heat Sink ML20210T4171975-03-14014 March 1975 Summary of 750225 Meeting W/Util & C-E in Bethesda,Md Re Proposed Rev to Design of UHS for Facility.List of Attendees & Documentation Encl ML20198G4551975-03-13013 March 1975 Summary of 750225 Meeting W/Wppss & Ebasco in Bethesda,Md, to Discuss Groundwater Drainage Sys ML20210T3051975-01-24024 January 1975 Summary of 750109 Meeting W/Util & Ebasco in Bethesda,Md Re Response to NRC Request for Addl Info.List of Attendees & Agenda Encl ML20198G5621975-01-24024 January 1975 Summary of 750109 Meeting W/Wppss & Ebasco in Bethesda,Md to Discuss Responses to NRC Requests for Addl Info. Attendance List & Agenda Encl ML20198G5801975-01-21021 January 1975 Summmary of 741220 Meeting W/Wppss,Ebasco & Woodward-Clyde in Bethesda,Md to Discuss Landslides & Slope Stability ML20210T0581974-12-12012 December 1974 Summary of 741119 Meeting W/State of Wa Geological Survey & Dept of Highways in Olympia,Wa Re Slope Stability & Existing Landslides in Area Near Proposed Facility Site.List of Attendees Encl ML20198F0801974-11-24024 November 1974 Summary of 741114 Meeting W/Potential Intervenor DF Finn in San Francisco,Ca to Discuss Issues of Mutual Interest Re CP Applications ML20210T0121974-11-11011 November 1974 Summary of 741104 Meeting W/Util,Ebasco & C-E in Bethesda,Md Re NRC Position on Auxiliary Feedwater Sys Design.List of Attendees Encl ML20210T0081974-11-11011 November 1974 Summary of 741024 Meeting W/Util,Ebasco & Woodward-Lundgren in Bethesda,Md Re Slope Stability & Landslides in Site Area. List of Attendees & Diagrams Encl ML20198G6631974-11-11011 November 1974 Summary of 741029 Meeting W/Wpps,Ebasco & Woodward-Lundgren in Bethesda,Md,To Discuss Slope Stability & Landslides ML20210T3381974-09-30030 September 1974 Summary of 740917 Meeting W/State of Wa Dept of Natural Resuouces,Earth Sciences Div in Olympia,Wa to Discuss Earthquakes & Faulting in Lower Puget Sound Region of State. Attendance List Encl ML20210T3431974-09-30030 September 1974 Summary of 740920 Meeting W/Util,Ebasco & C-E to Discuss Draft First Round Questions Re QA Mechanical Engineering & Effluent,Auxiliary & Power Conversion & Containment Sys. Attendance List & Agenda Encl ML20198G8151974-09-30030 September 1974 Summary of 740920 Meeting w/WPPSS,C-E & Ebasco to Discuss first-round Questions Re QA Mechanical Engineering & Effluent Auxiliary Power & Conversion & Containment Sys ML20198G8331974-09-30030 September 1974 Summary of 740917 Meeting W/State of Wa in Olympia,Wa to Discuss Earthquakes & Faulting in Lower Puget Sound Region. Attendance List Encl 1996-11-26
[Table view] |
Text
. .. . . . . . _ - . ~.. - . . .
216 m6 DOCKLT 5 STN 50-509 APPLICANTS: Washington Public Power Supply Syste, et al (WPPSS)
FACILITY: lbcle,ar Project Nos. 3 and Nos. 5 (WNP-3 and WNP-5)
SMIARY OF AINISORY 03HITHI ON RFKIDR SATInIARDS >EETING 10 CONSIDER
}0CIIAR PinIDCf 10S. 3 AND 10S, S.
The Advisory Canadttee on Reactor Safeguards met on March 4,1976 to consider the construction permit application for the WNP-3 and WNP-5.
A detailed agenda is attachal.
We presental a stamary of the outstanling issues of which there were eight. We inlicated that we were awaiting further information with respect to one open its which addressed to controlling the aclusion arca a: prescribed by 10 CFR Part 100. Por this item the staff indicated to the Corrittee that the control of the exclusion area had to be sub-i stantiatal before the consttuction permits would N issued. On the other seven naas, the staff inlicatal that for six itms we had received further 1
informtion from the applicant and were reviewing the information. Our finiings on these itms would be reported in the supplanent to the Safety Evaluation Report. For the seventh item, it was indicated that for the construction pemit stage of review, the staff considered this its resolval. Ilowever, we would review this item as a post-constmetion permit itm. A further its that was discussed with the staff was the j pinbability of occurrence of the safe slutdown earthquake (SSE) 8esign of 0.32g or approximately an 81/4 Hodifial Mercalli (>W). We statal that this was an upper bount and a conservative design level and we were not in a position to report the probability of the SSE. However, we did state that (
order of 10gr 8to)H 10'gt.Aberdeen,
!ktrapolating Washington, beyont 8 the FN,probability was in the the staff indicated that the curve would drop very fast, but could not give a probability raaber.
icant presented talks em the subjects listed in the attached
};;.yf C%[v y s .W' -*
3 Nhe
.. . , ..u . ; W ~L
. ,<wn.. ,
, & ~-
~
W 8605290457 DR 760316 ADOCK 05000500 PDR
5 Pa 1 e nn I
i before the Joint Comittee on the f.tmic Energy) stated that the Committee would try to write a letter regarding the two units considered in this meeting.
Cr ' . ' . ;aed by:
Antaany Bournia ,
Anthony Bournia 2 Light Water Reactors Branch No. 3 Division of Project finnagment
Enclosure:
Agtmda
. , , , , , , . DlH:Lhlt #3
,,.m.a. Alk)dhiia:mj f
..,s 3/1L/76 f er a %I C.314 i t;es. 913) AB OE C 2 +v W u. e. cov e mmusm? Puentime carec er esta.sse.tes
TENTATIVE PRESENTATION SCHz._ E WASHINGTON PUBLIC POWER SUPPLY SYSTEMS UNITS 3 & 5 CONSTRUCTION PERMIT 1717 H ST., N. W., WASHINGTON, D. C.
191ST ACRS MEETING APPROXIMATE TIME 1.0 MEETING WITH APP 1TCANT AND NRC STAFF (OPEN SESSION) 1.1 Opening Statement by Chairman 5 mins.
1.2 Introductory Presentations By Applicant 20 mins.
Washington Public Power Supply Systems (NPPSS)
- Organization
- Previous nuclear experisnce Schedule General Plant Description and Layout Experience of Major Contractors and Key Contractor Personnel 1.3 Report by the NRC Staff 20 mins.
Outstanding / Unresolved Issues (detailed discussion)
Staff Conclusions 1.4 Applicant's Response to Staff Report 5 mins.
1.5 Technical Presentations by the Applicant with NRC Gtaff Response Site Characteristics
- Demography 5 mins.
- Seismicity (selection of the SSE and 45 mins.
significance of faulting near the site)
Ultimate Heat Sink 5 mins.
Nuclear Steam Supply System 20 mins.
- Exceptions taken to CESSAR (discuss changes and justification)
- Future changes anticipated
- Status of unresolved CESSAR issues
~% )
\
I
)
APPROXIMATE
, TIME s Balance of Plant -
20 mins.
- Containment design Offsite dose, calculations
- ESF Cystem cable separation The Applicant Should be Prepared to Discuss 20 mins.
The Following Itdast Interfaces between. NSSS s and BOP
- Auxillary feedwater by, stem design .
s Tornado missile protection, Offsite power reliability \s s Fire protection s
Emergency Planning N N
N
- Other items as requested by the Committee, 2.0 INDUSTRIAL SECURITY (CLOSED SESSION) 10 mins.
3.0 CAUCUS (CLOSED SESSION) 5 mins.
4.0 MEETING WITH THE NRC STAFF AND APPLICANT (OPEN SESSION) 5 mins.
Conclusions / remarks ,
5.0 ADJOURNMENT NOTES:
(1) The above schedule aqd agenda itema, will be re' viewed towards the end of the Februa N 4th Subcomm h ee Meeting and agenda items will be added or deleted as considered necessary by the Subcommittee Members.
I (t) A maximum of 30 minutes will be allowed for receiving oral statements from members of the public, if requested.
v (4) The speakers should have prepared presentations. An allowance amounting to approximately 50% of the presentation time should be made for questioning by the Committee and its consultants.
.