ML20210S375
| ML20210S375 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/15/1986 |
| From: | Widell R FLORIDA POWER CORP. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20210S378 | List: |
| References | |
| 3F058G-11, 3F58G-11, NUDOCS 8605210239 | |
| Download: ML20210S375 (1) | |
Text
e*
0 *,
OO 9 0 **
ee.
Power lih15,1986 3F0586-11 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555
)
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Reactor Vessel Material Surveillance Program:
Analyses of Capsules CR3-C and CR3-D
Dear Sir:
Attached as required by 10 CFR 50, Appendix H, are Reports BAW-1898 and BAW-1899 dated March, 1986. These reports should have been transmitted by Florida Power Corporation before the end of March,1986, but were delayed by an administrative oversight. We regret any inconvenience caused by the delayed transmittal.
Sincerely, R. C.NWidell Manager, Nuclear Operations Licensing and Fuel Management EHD/sdr Attachment k0$fl0500039g 860515
\\
P 0
PDR 0
1 I GEN ERAL OFFICE 3201 Thirty-fourth street south e P.O. Box 14042, st. Petersburg, Florida 33733 8 813-866-5151 h