.5 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT NO.

86-02 O

STATION MANAGER 8

pg52l DOCK 05000280 O2s9 e6022e R

PDR

\\

\\

f.

i Page Section 1

Operating Data Report - Unit No. I 2

Operating Data Report - Unit No. 2 3

Unit Shutdowns and Power Reductions - Unit No.1 Unit Shutdowns and Power Reductions - Unit No. 2 4

Load Reductions Due to Environmental Restrictions - Unit No.1 5

Load Reductions Due to Environmental Restrictions - Unit No. 2 6

Average Daily Unit Power Level-Unit No.1 7

Average Daily Unit Power Level-Unit No. 2 7

Summary of Operating Experience 8-9 i

Facility Changes Requiring NRC Approval 10 Facility Changes That Did Not Require NRC Approval 10 - 11 Tests and Experiments Requiring NRC Approval 12 Tests and Experiments That Did Not Require NRC Approval 12 Other Changes, Tests and Experiments 13 Chemistry Report 14 Description of AllInstances Where Thermal Discharge Limits 15 Were Exceeded Fuel Handling 16 - 17 Procedure Revisions That Changed the Operating Mode Described 18 in the FSAR Description of Periodic Tests Which Were Not Completed Within the Time Limits Specified in Technical Specifications 19 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit No.1 - Mechanical Maintenance 20 - 26 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit No.1 - Electrical Maintenance 20 - 26 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit No.1 -Instrument Maintenance 20 - 26

  • s as Section Page Maintenance of Safety Related Systems During Outage or Reduced 27 - 35 Power Periods - Unit No. 2 - Mechanical Maintenance Maintenance of Safety Related Systems During Outage or Reduced 27 - 35 Power Periods - Unit No. 2 - Electrical Maintenance i

Maintenance of Safety Related Systems During Outage or Reduced 27 - 35 Power Periods - Unit No. 2 -Instrument Maintenance l

f O

+

O j

ADM l.g Page 1 of 35 A""!ACEMENT 5 Pcge 1 of 3 OPERATING DATA FSPORT FEB C2 tW D00KET NO. 50-280 DATE 3-4-86 COMPLETED BY V. Jones

"T* HONE 357-3184 OPERATING STATUS 1.

Unit Name:

Unit #1 (Surry)

Notes 2.

Reporting Period: 02-01-86 to 02-28-86 3.

Licensed Thermal Power (Wt):

2441 4

Nameplate Rating (Gross We):

847.5 5.

Design Electrical Rating (Net W e):

788 6.

Maximum Dependable Capacity (Gross MWe):

820 7.

Maximus Dependable Capacity (Not MWe):

781

~

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Rastricted If Any (Net MWe):

10. Reasons For Rastrictions, If Any:

This Month Yr.-to-Date Cummulative

11. Ecurs In Reporting Period 672.0 1416.0 115608.0 l
12. Number of Hours Reactor Was Critical 504.8 1047.9 73360.0
13. Reactor Reserve Shutdown Hours 0-0 3774.5 14.

Eours Generator On-Line 494.0 1014.7 71853.2

15. Unit Reserve Shutdown Bours 0

0 3736.2

16. Gross Thermal Energy Generr.ted (WE) 1145190.6 2319635.3 166202258.0
17. Gross Electrical Energy Generated (MWE) 383835.0 766915.0 53538848.0
18. Net Electrical Energy Generated (MWE) 364466.0 727070.0 50760413.0 l
19. Unit Service Factor 73.5 %

71.7 %

62.2%

20.

Unit Available Factor 73.5 %

71.1%

e5.4 %

1

.21.

Unit Capacity Tactor (Using MDC Nat) 69.4 %

65.7 %

56.9 %

22. Unit Capacity Factor (Using DER Net) 68.8 %

65.2 %

55.7%

23. Unit Forced Rate 2.1 %__

5.2%

18.9 %

24.

Shutdowns Scheduled Over Next 6 Months (Type Date, and Duratioc of Each):

Refueling 05-09 48 days 25.

If Shut Down At End Of Report Period Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved.

INITIAL CRITICALITY INITIAL ELECTRICIIY COMMERCIAL OPERATION (9/77)

21.'._. b

{

. Page 2 of 35 a...-

? age. cf 2 U C0 E 0?I?J.!!EC. DATA F.EPO?.T DO: TIT NO. 50-281 DATI 3-4-86 COXPLI'~iD BY V. Jones F r*HONI 357-3184 0?I?.ATING S':r"US l.

Unit Name:

Unit #2 (Surry)

Notes 2.

Reporting Period:

02-01-86 to 02-28-86 3.

Licensed Ther=al Fover (MW:):

2441 4

Kaneplate Rating (G css We):

847.5 5.

Design Ilee::1 cal Rating (Net MWe):

766 6.

Marizr.:= Dependable Capacity (Gross MWe): 820 7.

Maximus Dependable Capacity (Net We):

781 8.

If Changes Occur in C.apacity Ratings (;tems Eumber 3 Through 7) Since Las:

Report, Give Reasons:

9.

Power Level To Which Restricted If Any (Net MWe):

10. Reasons For Restrictions, If Any:

This Month Tr.-to-Date Cummulative

11. Ecurs in Reporting Period 672.0 1416.0 112488.0
12. Number of Ecurs Reactor Was Critical 481.9 1225.9 73168.6
13. Reactor Reserve Shutdown Hours 0-0 328.1 14.

Ecurs Generator On-Line 465.9 1209.9 71975.3

15. Unit Reserve Shutdown Bours 0

0 0

16.

Gross Thermal Energy Generated (EE) 1093580.8 2907920.4 168214951.0

17. Gross Electrical Energy 362090.0 959350.0 54547654.0 Generated (WE)
18. Net Elecr ical Energy Generated (WE) 343909.0 911789.0 51698372.0
19. Uni: Service Factor 69.3 %

85.5%

64.0 %

20.

Uni: Available Factor 69.3 %

85.5%

64.0%

.21.

Uni: Capacity Tactor (Using MDC Net) 65.5 %

82.8%

59.0%

22.

Unit Capacity Tactor 64.9 %

81.7%

58.3%

(Using DER Net)

23. Unit Forced Rate 0

0 13.3 %

24.

Shutdowns Scheduled Over Next 6 Months (T pe Date, and Duration of F.ach):

25.

If Shut Down A: End of Repor: Period Estimated Date of Startup:

26.

Units in Tes: Sta:us (Prior to Con:mercial Operation):

Forecast Ac'nievac INITIAL CR!!ICALITY INIIAL n TCRICITY COMMERCIAL 0?IRATION (9/77)

.____c,,

m e

lxx gr r so.

50-280-e (JNIT SilulDOWNS ANI) POWER REDUCTIONS tJNi r N A M I.

Surry # 1 DA~lE D3-04-AR COMPl.ETED Hy V. Jnnen REPOR1 MONIlg Fe b.

TELEPilONE f 804) M7 11Rd F.

E E

Licensee

[ r, K

Cause & Corecceive

$g 3

y [y"4 i

Actionto 2s Event g3 go No.

Date Q

3g i

Pievent Recurrence H

fE E

y 5, c Repost 3r wU o

u e

6 86-03 01-24-86 S

167.5 A

2 Continuation of snubber outage.

86-04 02-07-86 F

10.5 A

3 Reactor trip by turbine trip, caused by "C" steam generator high level during startup. liigh level caused by the "C" bypass valve falling open. Corrective action - technicians blew moisture out of sensing lines to the bypass valve.

~

N i

3 4

i 2

Method:

Exhibit G. Instructions 1 Manual for Picparation of Daia l'

fosced Reason:

t S: Stheduled A filospment Failure (Explain) 2 Manual Scram.

Enso Sheets for 1.icensec ll-Mainienance of Test 3 Automatic Scram.

Event Repo 1 (1.1:R) File (NURI G-C.Heluchng 4-Other (Explain) 01611 D. Regulatory Resisiction l' Opesator Training & ljeense Examination 2

5 F Adnumstrative IThihn 1 Same Sourte g

G Opesanonal 1:ssor (E xplain) a i

es/71) ll Other (Esplain)

?

u Gn t

e 50-281 OO CKl.I N O.

tlN1T SIlulDOWNS AND POWLR REDUCllONS tJNII N AMI.

Si bY #2 D A I t'.._ 03-94-86 COMI't.E llill isY V. Jones RI. PORI MONill Feb.

11.1.El'IlONE (804) 357-3184 w.

$g "g

E _;

I kcusce E v, 4

C.suse & Corset give E.

Date Q

3$

.E s 5 I; vent g,7 c3 3 As.Heni to bU Psevent Hecussente 5

3gg Reposi ##

in V F

u 6

Unit shutdown for snubber outage. Reactor 86-02 02-16-86 S

206.1 11 3

tripped on "B" SIG high level af ter the generator was off the line. Cause of S/G high level was excessive leakage thru the feed regulating and bypass valves.

Corrective action - maintenance performed on valves during outage.

I 3

4 I

2 Meilstal:

I sluta C Insieuctions 1 -Manual ton P cpa, anon of Daia i

l'. Irin seil Reason:

S Ssliceluted A 1 aguipment Failure (Emplain) 2 Manual Scram.

I niry Sliccis fue 1.icensec li. Maintenance or Tes 3 Automatic Scsam.

t vens Itepues 11.1.10 l'ile INult! G-C liefucimg D Regulainey itesuiction 4 Other (Emplaml Ollill y

ILOpesains Tsaimng & l.icense Examinanon 5

ao*

F. Ailnumsis ative I sIntus I S.nne Sour.c G Opesanonal I.esos (Explain)

[

j to//11 11 Othe II.mplani) f.a3 U1

i lO P gs 5 of 35 LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS l.

UNIT NO. 1 MONTH:

Februarv 7

DATE TIME HOURS LOAD W REDUCTIONS, W MWH REASON

' I NONE DURING TIIIS REPORTING PERIOD l

l r

I l

t

\\

j I

i

!1 s

j s

l c

t I

t f

.i 1-I i

t I

i I

t s -

I MONTHLY TOTAL

Pag 3 6 of 35 LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO. 2 MONTH: February 7

DATE TIME HOURS LOAD. MW REDUCTIONS. W MWH REASON l

NONE DURING THIS REPORTING PERIOD.

e i.

9 9

t t

e l

i l

s 6

I 1

l.

s s

i l-i S

MONTHLY TOTAL

l i

e V

"L 4 Av6Mib5 8' A l t. v tital l ennrg trv' t 5U94v Puwte slallON DHO bp A M NU44 bul (l \\ ' ' ) / d *= *.*

FFn uaRY 1996 OLPORTING MONIH -

o DO( n' t NO. S"-2dn DOLuki NO. 50-481 OAft "4PLH 3e &#3 0 *-

LUMPIEtto PV w.H.

JUNL5 U e4 1 ? ON E UN I T y w n Avr ga,r DAILY POWLR Lt EL A v F M Abf DAILv puwtp LEvtl s

DAY

-Mwo-N88-

- MW L - N' T -

fol.1 t

J.'w 0.0 763.6 s

J U.O 7655 J.U 702.7

)

J.0 ts'.'

To'.1 d

w.s 76'.O

/

v.J o

93 6-761.4

'd 367 3 7e4.5 lu F67 7 766.1 1.

177.J 767.*

1.

77a.1 766.M la 770 1 705.7 1%

776 0 704.1 15

'776 8'

7en.8 16 172 6 eso.R.

It

(* 5 0 to 171 4 1,

172.s

~.

?.

77$.9 c.

?.

775 5 6

2.

77*.9 6

lis.e

?*

Iss.o e.

?>

16o.5 146.6

'o 770 5 699.6 di F76 4 7F!.'

?o 776 3 77^.3 O

b k

In

o CD 9

O Ho Ca3 Us

__a_-.

. _ = _

_m-

.a

SUMMARY

OF OPERATING EXPERIENCE Paga 8,of 35 MONTH / YEAR Feb. 1986 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant

.non-load related incidents.

UNIT ONE 02-01-86 0000 This reporting period begins with the unit at CSD on RHR.

02-04-86 0156 Commenced filling RCS.

2220 Completed RCS fill and vent.

02-06-86 0313 RCS > 2000F.

0917 RCS > 3500F,450 psig.

2055 RCS at HSD.

02-07-86 1802 Rx critical.

2333 Generator on the line.

2338 Rx trip by turbine trip, "C" S/G high level 02-08-86 0446 Rx critical 1005 Generator on the line.

1118 Holding power at 30 %,165 MW's for chemistry.

02-09-86 0407 Commenced power increase at 3 % /hr.

02-10-86 0401 Unit at 100 %, 815 MW's.

02-28-86 2400 This reporting period ends with the unit at 100% power,815 MW's.

  • s

.s

SUMMARY

OF OPERATING EXPERIENCE MONTH / YEAR Feb. 1986 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

UNIT TWO 02-01-86 0000 This reporting period begins with the unit at 100 % power,805 51W's.

02-16-86 1200 Commenced rampdown at 150 51W/hr. for snubber outage.

1707 Generator off the line.

1709 Reactor trip by "B" S/G high level.

02-17-8G 0330 Commenced RCS cooldown.

0650 RCS < 3500F, 450 psig.

1800 RCS degassed.

2053 RCS < 2000F.

02-23-86 1700 RCS > 2000F.

2115 RCS > 350oF,450 psig.

02-24-86 0406 RCS at HSD.

1516 Rx critical 02-25-86 0710 Generator on the line.

0754 Holding power at 30 %, 210 51W's for chemistry.

2035 Commenced power increase at 100 51W's/hr.

02-26-86 0658 Unit at 100 % power,810 51W's.

l

.e Pag 310 cf 35 FACILITY CHANGES REQUIRING NRC APPROVAL MONTH / YEAR Feb. - 1986 NONE DURING T!!IS REPORTING PERIOD.

FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH / YEAR Feb. - 1986 DC 83-04 Interim Control Room Upgrade Units 16 2 This design change changed the background of instrument and control label tags to white and the lettering to black. Replaced priority alarm annunciator windows with white windows, and established consistent labeling guidelines. In addition, instrument and control functional grouping arrangements were shaded various color tones in an effort to coordinate interdependent systems.

Summary of Safety Analysis The modification improved the overall safety and reliability of the station by enhancing operator performance through improved labeling and color shading of instrument groups.

DC 84-06 Auto Actuation of Reactor Trip Breaker Shunt Trip Attachment Unit 1 This design change replaced the reactor trip breaker shunt attachment with a component which is safety related QA Category I Class IE. The reactor trip breaker shunt trip attachment will actuate automatically upon the receipt of a reactor trip signal Summary of Saftey Analysis The modification provides a higher level of reliability of reactor trip breaker operation and the operation of the reactor protection system. It will ensure successful operation of the reactor trip system during transient and accident conditions.

84-79 Auxiliary Feedwater Pump Valve Replacement Unit 1 This design change replaced existing auxiliary feedwater pump steam supply valves with valves that have greater seating force. The new valves are full port valves, eliminating a gasket system which was contributing to the valve failures. In addition, a high force piston actuator replaced the existing diaphragm actuator. Both seating surfaces, on the removable seating and the enlarged plug were hardfaced to reduce wear and prevent steam cutting.

Summary of Safety Analysis The modification is an enhancement over previous equipment due to improved availability of auxiliary feedwater pump.

i

l.

Page 11 of 35 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH / YEAR FEB. - 1986

[.

DC RG 1.97 Emergency Ventilation Damper Position Indication Unit 2 This design change provides position indications of emergency ventilation dampers and satisfied RG 1.97 and RG 1.89 requirements. Environmentally qualified limit switches were mounted on the dampers to provide position indication such that the original qualification and operation of the dampers is not degraded.

Summary of Safety Analysis The modification added limit switches, which are environmentally qualified to emergency ventilation dampers. It does not change the operation of the emergency ventilation dampers or the operation of other safety systems.

l i

r I

1

- -, _. b.

Page 12 of 35 TESTS AND EXPERIMENTS REQUIRING NRC APPROVAL Feb. - 198 6 MONTH / YEAR NONE DURING THIS REPORTING PERIOD

' )

TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH / YEAR Feb. - 1986 UNIT 1 1-ST-186 - Bolting Identification Test

o t

.g Page 13 of 35 OTHER CHANGES. TES13 AND EXPERIMENTS MONTH / YEAR Feb. - 1986 4

l NONE DURING THIS REPORTING PERIOD.

i i

i 4

5 i

1 i

a v

a

.l J

i 4

l l

l t

l 1

l i

4 t

I i

-i I

P3; 28-06 Page 14 of 35 VIRGIt'IA PG;ER SURRY POWER STATIO!!

CHDtIS"RY FIPORT 4

FEBRUARY 19 86 PPN ME U:: T 10.1 UITIT 10. 2 ANALYSIS FAXIMLN MINIh1B' A'ERAGE

!AXIFIN MINIFIE AVER 7EE Gross P=H rw-t., uCi/ml 1.51E+0 7.31E-2 6.53E-1 1.78E-1 1.54E-2 7.69E-2 Susr.=rdid Solids, t:an (A)

(A)

(A)

(A)

(A)

(A)

Aoss Tritiun, uCi/ml 3.48E-2 1.13E-2 2.63E-2 1.10E-1 9.93E-2 1.04E-1 131

]

Iodine uCi/ml 2.48E-2 1.18E-3 1.16E-2 3.28E-4 2.72E-5 1.31E-4 131 131 I

jy 0.20 0.09 0.15 0.27 0.02 0.11 Hvdrocen, cc/ke (1) 35.3 9.3(C) 24.8(B) 41.0 3.6(D) 25.1(B)

'ithitn, run 1.31 0.48 0.75 1.87 0.98 1.20 Boron-10, c:n*

244 23.0 106 375 107 184 i

Oxveen, (D.O.), een (2)

1. 2 (E) 0.005 0.122 0.005 0.005 0.005 i

Oloride, pan 0.01 0.01 0.01 0.01 0.01 0.01 oH @ 25'C 7.01 5.71 6.6 6.58 5.60 6.19

  • Bo::en-10 = Total Baron x 0.196 j

E 7.RKS: (A) 'PRA not run-vacinun cumo not workina. MR sinnitted for repair.

(B) Both units have a low average Hydrogen due to several sanples<25cc/kg while returning to spec durino/after startup or degassing for shutdown.

(C) U-1: minirun during startup after criticality. Hydrogen out of spec fran 02-07-86 @ 2000 to 02-11-86 0 0930.

(D) U-2:

minir.un occurred while shutdown. Hydrogen was in spec before criticality.

(E) High D.O. in U-1 durina startup after starting RCP's-Returned to 40.005 before exceeding 180*F.

Li additions: U-1: 02-05 @ 1310 1730g; 02-06 0 0410 318g, @ 2245 680g; 02-07 @

1250 350c; 02-08 @ 0945 325c; 02-09 @ 1810 245q. All additions were made during startup 1

fran snubber outaae. U-2: 02-23 @ 1200 12500; 02-24 @ 1020 1425g - kiditions made during l

startup from snubber outage. CAT Bed: U-1 placed in service on 02-19 fran 1715-2027 due to Li being high in band U-2 cat bed not placed in service on U-2.

i

e a

ag

.e DESCRIPTION OF ALL INSTANCES WHERE Page 15 of 35 THERMAL DISCHARGE LIMITS WERE EXCEEDED MONTH / YEAR Feb. - 1986 NONE DURING THIS REPORTING PERIOD.

(

1 I

i 1

e e

m--s-...

.y..

..,9

  • a, -, - - - - -.

y y

7y---

,,y y,,74,,yg_g,,,

._m.m--pp,,..wsyw&ar

- we w v w-w'me-t&w--"wM-'-

--W'c'--

N-'

--*=y-r

a

  • A FUEL HANDLING UNIT #

1 MONTH / YEAR Feb.,1986 DATE NO. OF ANSI NO.

NEW OR SPENT FUEL SHIPPED /RECEINED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVE*[

NONE DURING THIS PERIOD.

--m_

-w-----.

--'+v

  • g Page 17 of 35 FUEL HANDLING UNIT #

2 MONTH / YEAR Feb.,198 6 ANSI NO.

NEW OR SPENT FUEL DATE NO. OF,

SHIPPED / RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LE*Jf:

NONE DURIN' i THIS REPORTING PERII )D.

i

Pag 318 of 35 PROCEDURE REVISIONS THAT CHANGED THE OPERATING AIODE DESCRIBED IN THE FSAR 1

MONTH / YEAR Feb. - 1986 NONE DURING THIS REPORTING PERIOD.

i I

a J

e i

4 i

4 i

o h

Pag 319 of 35 DESCRIPTION OF PERIODIC TESTS WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH / YEAR FEB. -198 8 1-PT-24.39 High Pressure CO: System - Technical Support Center Vent Filters 1-PT-24.4 4 Emergency Switchgear Room Halon 1-PT-24.4 5 Emergency Switchgear Roon Halon 1-PT-24.4 6 Emergency Switchgear Room IIalon 2-PT-24.44 Emergency Switchgear Roon Halon 2-PT-24.4 5 Emergency Switchgear Room Halon 2-PT-24.4 6 Emergency Switchgear Room Halon

o Page 20 of 35 MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS

-j.

i I

UNIT NO.1 MONTH / YEAR Feb. - 1986 The below listed codes denotes the following departments:

'~

0228 or R03 Mechanical 0229 or R04 Electrical Instruments 0237 or T22 i

i l

l l

I

_c.,.

~

e JEPCO SAFETY RELATED DLRING REDUCED POER SORTED BY UNIT AND DEPARTMENT PROGRAM WPT09060 03/04/86 13:"J8 FROM 02/16/86 THtu 02/27/86 page 21 of 35 UNIT 02 SURRY RETlRNED TO WO DEPT SERVICE MARK NLMBER MJMBER WO TITLE HISTORY SLMMARY 0228 02/18/86 02-MS -TV -201A 025319 PACKING LEAK ON RIGHT HAND ADJUSTED PACKING ROCKER ARM 0228 02/18/86 02-RS -fMO -NA 017372 ROTATE SPECTACLE FLANGE REVERSED SPECTACLE TO BLAM( SIE FOR HYDRO. REVERSE BACK TO SPECTACL E AFTER HYDRO.

0228 02/18/06 02-RS -FNG -NA 017375 REVERSE SPECTACLE TO BLAM(

REVERSE SFECTACLE TO BLAM( SIDE FOR MJDRO, REVERSE BACK TO SFECTACLE FOLLOWING HYDRO 0228 02/18/86 02-RS -NOV -255A 030354 REFLACE 6 0F TE 8 STUDS WITH MODE /ECHANISM N/A B7 CARBON STEEL STuo STAPP STUD M) ON VALE BOMET AND VALVE, REMOVE STUDS DE AT A TIME l

AND REPLACED WITH B-7 STUDS AND TOR QLE TO 130 FT/LBS 0228 02/18/06 02-RS -MOV -255B 030391 REFtACE ALL 8 0F TE S.S.

MODE /ECHANISM N/A 1

STAPPED STUD NUMBERS ON VALVE AND BOMET REMOVED STUDS DE FLAT AT A TIE AND REPLACED WITH B-7 STUDS AND TCRGED TO 130 FT LB WITH 0228 02/19/86 02-CS -9

-3 029936 PM - ON DEMAND Ftt F9P IAW PROCEDLRE i 0228 02/19/86 02-SI -MOV -2860A 030392 REFtACE 2 0F TE 20 S.S. STUDS MODE!NA E CHANISM! NA STAPF STUD NO. ON VALVE BODY AND ON VALVE lOGET. REMOVE OLD STUDS AND REPLACE WITH EW STUDS AND MJTS.

TCROLE ALL NUTS 130 FT LBS 0228 02/19/06 02-SI -MOV -2860B 030390 REPLACE 3 0F TE 20 STUDS WITH MODE /ECHMISMt NA. STAPPED NUMBERS CARBON STEEL STuo ON VALVE BOWET AND FLANGE. REMOVED DE OLD STUD AT A TIE AND REPLACED WITH EW GE AND T(REED TO 139 FT L36. RETOR0 LED ALL STUDS 0228 02/19/86 02-SW -

-108 016922 CECK VALVE IS STUCK OPEN.

MODE: SEAT PIN. ECHANISM CWtROSIO N. FOLMD CECK VALVE SEAT HINGE PIN NOT IN VALVE. THIS CAUSED VALVE NOT TO SEAT PROPERLY. REPLACED C ECK VALVE WITH EW VALVE.AS LEFT: CECK 0228 02/19/84 02-SW -P

-10B 027546 PtfP IN ALERT RANGE REMOVED OLD Pt#F, INSTALLED SPARE F9F; TESTED SAT EXCEPT ECHANICAL i

EAL LEAKS.Wtc 331841 SUBMITTED MODEt VIBRATION LO D/P

O KPC0 SAFETY RELATED ISING REDUCED POER SORTED BY UNIT AND DEPARTMENT FROGRAM WT09860 03/04/86 15858 FROM 02/16/06 Tm u 02/27/96 i

UNIT 02 SURRY Page 21'of 35 RETlRED TO WO DEPT SERVICE MARK MMBER NUMBER WO TITLE HISTORY St#9tARY ECHANISMt WORN OUT 0229 02/19/86 02-SW -P

-10B 030703 PM - ON IOtAND CO@LETED PM IAW PROCEDlJtE SEAL LEAKS EC 331841 l

0229 02/20/86 02-SI -

-242 030952 REPLACE ALL STUDS WITH B7 CARBmMODE/ECHANISMt NA STA r VALVE BO K T AND VAL E WITH STEEL STUD STEAL STAWS. REMOVE DE STUD AT A TIE AND RETORGE. REFLACE WITH B-7 STUDS.TORKED ALL STUDS TO 700 FT/LB 0229 02/20/86 02-SI -

-82 030887 RERACE STUDS. RESULT OF MOM /ECHANISM NA 1

TESTINo RERACED STUDS DE AT A TIE AND TORGED TO 700 FT/LB 0228 02/21/06 02-CH -HCV -2310 030860 VALVE HAS BODY TO BO E T &

MOM /ECHANISMt NA. REMOVED OLD I

PACKING LEAK VALVE HAS BEEN STUI6 WE AT A TIE TO RDLACE WITH EW B7 STUDS TGt0E TO 533 FT LB I

FURMINATED ADD COPPER WASERS LMDER MJTS 0228 02/21/86 02-CH -MOV -2275A 026779 BROKEN CAP SCREW IN TOP COVER INSTALLED BG.T WICH WAS MISSING IN HANDieEEL CAP 0229 02/21/86 02-01 -TCV -2143 030452 REPLACE ALL 4 STUDS WITH B7 CHANGED OUT STUDS DE AT A TIE CARBON STEEL STuo MD TGt0ED TO 130 FT/LBS MODE /ECHMISMt NA 0229 02/21/86 02-FW -

-135 025954 VALVE IS MISSING HANDieEEL INSTALLED EW HANDieEEL j 0220 02/21/86 02-FW -

-144 029174 DISAMBLE AND INSPECT MODE! INSPECT ECHANISMt Em DISAGSEMLED VALVE CLEAED, INSPECT ED INTERNALS,BLLED SEAT, 00T 100%

BLE. REA69EMLED VALVE TORGED BOLTS TO 45 FT LBS NO BLOCKAGE 0229 02/21/86 02-FW -

-145 028179 FtLL VALVE INSKCT FOR K0CK-MODEt PtLL TO INSPECT.ECHANISMt NO AoE BLOCKAGE. REM 0ED BOMET FROM D0DY FOLMD NO KOCKAGE IN LIE ON EITER SIDE OF YAUE.KED SEATING SLRFACE FOUND TO HAVE 100% CONTACT. CLEAED 0229 02/21/86 02-FW -

-147 028176 PtLL VALVE INSPECT FORBLOCK-OPEED RVE ACCORDING TO FROCEDLRE AGE

, INSPECTED INTERNAL,BLLED SEATS.

VALVE SEATS SHOED 100% BLE AND INTERNALS ERE SATISFACTORY, CLOSED R VE A6 PER PROCEDLRE AND TOROLE 0228 02/21/86 02-FW -

-148 029173 OPEN R VE INSPECT FOR K OCK-REMOVED COVER REMOVED PLUG,CLEAED N E. I M CTED R W AGE INTERNALS AND PLUG SAT 100% BLLE TESTED.REASEEMBLED VALVE. CLOSED OUT NO BLOCKA E MODE! INSPECTION 0229 02/21/96 02-RC -

-11 030787 PACKING LEAK TIGHTEN PACKING MODEt LEAKING ECHANISMt NOMAL EAR 0229 02/21/86 02-RC -

-45 030786 PACKING LEAK TIG4 TEED PACKING MEET LEAKING ECHANISMt NWtMAL EAR.

0229 02/21/86 02-RC -FL -15 030791 BLANK FLANDE DOWNSTREAM OF 2-R TIGiTDED FLANGE BOLTS Cal 5 LEAKING MODEt LEAKING ECHANISMt LN(NOIM

.-..,.,_.n

SAFETY RELATED IUtING REDUCED F0ER SORTED BY LMIT AND DEPARTENT FROGRAM IFT09860 03/04/86 15:39 FROM 02/16/86 Tietu 02/27/86 Page 23 of 35 UNIT 02 SLRRY RETLRED TO WO DEPT SERVICE MARK NUMBER NLMBER WO TITLE HISTORY SLMMARY 0220 02/21/86 02-RC -HCV -2556A 030077 ADJUST PACKING LEAK MOIE: LEAK ECHANISM: EAR FOLMD PACKING LEAKING APPROX 15 DROPS MIN. ADAISTED PACKING TO STOP LEAK 4 FLATS 0229 02/21/86 02-RC -HCV -2557A 030079 PACKING LEAK--ADJUST FOLND PACKING LEAKING APPROX 20 I6t0FS MIN. ADJUSTED PACKING TO STOP LEAK APPROX 5 FLATS.

MOIE LEAK ECHANISM EAR 0229 02/21/86 02-RC -NOV -2594 030326 PACKING LEAK REPACK PER LER 86 REPACKED VALVE MOE: NA ECHANISM NA 0229 02/21/86 02-RH -

-5 030902 REPLACE STUDS MODE /ECHANISM N/A REMOVED STUDS OE AT A TIE AND REFtACED STUDS. TOROLED EACH STUD AS IT WAS CHANGED OUT TO 270 FT LB B7 STOCK 0229 02/21/86 02-RH -NOV -2720A 030921 STUD REPLACEENT PROICT MODE /ECHANISM: N/A CHANED OUT ALL STUDS DE AT A TIE TOROUED EW STUDS TO 3000 FT/LB 1

0229 02/21/86 02-RH -P

-1A 030061 FAB AND INSTALL SPACER BLOCK FABRICATED AND INSTALLED CLAfF MADE CLM F TO FIT. 2.975 SHAFT USIN G 3X3X1/2 NELE IRON WITH 2X1/2 BY 2" LONG FIR EARS FLAT BAR EIGHT IF ANILE IS 2" 3/4 BOLTS TO CLNF 0229 02/21/86 02-RM -P

-259 030635 REMOVE AND REPLACE BELTS NO ASSISTANCE REQUIRED NO WORK REQUIRED 0229 02/21/86 02-SI -

-130 030092 REPLACE STUDS. RESLLT OF MODE /ECHANISM NA. REPLACED STUDS TESTING WITH B-7 MTERIAL AND TORGED EACH STUD IN SEQUENCE TO 2400 FT/LBS 0229 02/21/86 02-SI -

-147 030093 REPLACE STUDS, RESLLT OF MODE /ECHMISM N/A TEsTrNo REMOVED OLD STUDS DE AT A TIE REPLACED WITH B-7 IN SEGENTIAL ORDER. TCRWKD EACH STUD TO 2400 FT/LBS 0229 02/21/86 02-SI -

-150 026913 EEDS TO BE REPACK VALVE MODE: N/A ECHANISM NA REM 0WED OLD PACKING. INSTALLED NEW PACKING. TIGHTE E D GLAND NUT.

0229 02/21/86 02-SI -

-230 030083 REPLACE N.L STUDS MOK/ECHANISM: NA.

REPLACED ALL STUDS DE AT A TIME.

TCROLED STUDS TO 700 FT/LB 0229 02/21/86 02-SI -

-79 030006 REPLACE ALL STUDS CHMGED DE STUD AT A TIE.

TORGED TO 700 FL/LBS MODE:NA ECHANISM NA 0229 02/21/86 02-SI -

-95 030080 REFtACE STUDS. RESLLT OF MOIE/ECHANISM NA. STNF STUD NO ON VALVE FLAME. REMIVE GE STUD AT A TESTING TIE AND REPLACED WITH B-7 STUDS.

RETOROLE TD 700 FT/LBS SGC-1312 ON TOROLE WRENCH.

0229 02/21/86 02-SI -

-98 025600 10DY TO BONET TOROLED VALVE CAP TO 750 FT LBS MODE: LEAKING ECMNISM: LM00M 0229 02/21/86 02-SI -

-94 030084 REPLACE N.L STUDS MODE ECHANISM NA. REPLACED STUDS WITH B-7 MATERIAL. CHANGED STUDS OUT IN SEGENCE AND T(ROLED EACH ST UD TO 700 FT/LDS

=

$CD SAFETY RELATED ItRING REDUCED POER SORTED BY UNIT AND DEPARTENT FROGRAM WPT09860 03/04/86 15 58 FROM 02/16/86 TEU 02/27/06 UNIT 02 SLRRY Page 24 of 35 RETIRED TO WO DEPT SERVICE MARK NLMBER NLMBER WO TITLE HISTORY StPMARY 0220 02/22/86 02-BD -

-4 031047 REPACK REPACKED VALVE PACKING WITH 3/4" PACKING 0229 02/22/86 02-BS -DR -HATCH 031028 MAKE REPAIRS AS ECESSARY FOR MOK/ECHANISM NA OP TESTED HATCH AND WAS SAT AS FER R. ALLEN 0220 02/22/86 02-RH -MOV -2700 030794 PACKING LEAK AND POSSIBLE MODE: LEAKING ECHANISM:NORML EAR 1 3/4X8-10"-16 REPACKED VALVE PACK ING. CHANGED OUT ALL STUDS AND NUTS EACH BG.T TORGED TO 2400 FT LBS 0220 02/23/86 02-BS -MISC-N\\A 031004 BOLTS ON HYDRALLIC MOTOR LOOSE TIGHTEED N L ALLEN EAD BG.TS ON DO(R RAM 3/4"X 5/8 TESTED AND CECK ED OK 0220 02/23/96 02-GN -

-1 024591 PACKING LEAK, ADEST REMOVED 6 RINGS OF PACKING. INSTALL ED 6 EW RING 6 0F 1/4" GARLOCK 98 PACKING. LUBRICATED GLAND STUDS AND VALVE STEM WITH N-5000 0229 02/24/86 02-BD -

-180 027031 FlRMANITED VALVE REPAIR TO FIRMANITED VALVE WAS REPLACED mtarm WITH A EW VALVE 2 NIPPLES AND PIPE CAP 0229 02/24/86 02-CC -PR -NA 031082 CC LIE TO MTR STATOR IS MISSINOFOLMD MOLMTING BRACKET TO BE MISSIN G FROM WALL. REMOVED AND STORED REST OF HMGER A6 PER EMY MOORE'S INSTRUCTICMS. SUBMITTED IR TO REPLA E HANGER PLATE AT REFELING 200034 0229 02/24/86 02-CH -HCV -2311 031000 BAD PACKING LENC ADEST OM.Y F0lMD PACKING LEAKING APPROX 10 DPM ADJUSTED PACKING TO STOP LENC 0229 02/24/86 02-CH -LCV -2460A 026111 VLV HAS SMALL PACKING LEAKS MODEt ECHANISMi NA 0FTED PACKING GLAND AND STEM AND PACKING STILL HAD FRESH N-5000 PACKING LOGED EW REMOVED DE RING AND INSTALLED (2) RINGS 0229 02/24/86 02-CH -RV -2203 030931 REFtACE STUDS REFtACED STUDG IAW PRnrmRE STUDS ARE 5/8"X11X51/2" fnd IM.ET FLANGE 8 EACH. FAILlRE MODE:DEGREGATED STUDSI FAILtRE MECH. VISUAL INSP.

0220 02/24/86 02-CH -TV -2204 031055 UALVE WILL NOT STROKE W[RKED ON DIAPEAGM OR.Y. DID NOT ESS WITH PACKING. REPLACED DIAPWA GM AND ALL DIAPEAGM CF BOLTING 0229 02/24/86 02-FU -P

-2 028172 PtLL C00LIR INSPECT FOR BLOCK-MODE! ECHMISM NA AGE REMOVED OIL COOLER FROM SYSTCM TESTED FOR BLOCFAGE. NO BLOCKAGE F0lMD. REINSTALLED IN SYSTEM 0220 02/24/96 02-FW -P

-2 031029 REPLACE NITRIGEN BOTTLE REPLACE NITROGEN BOTTLE MODEt E S TY ECHANISM!UK 0228 02/24/86 02-RC -

-17 031050 ADJUST PACKING ADJUSTED PACKING 6 FLATS TO STOP LEAK MODEt LEAK ECHANISMI NORMAL EAR

. o e,

KPCO SAFETY RELATED IUtING REDUCED POER SORTED BY UNIT AND DEPARTENT PROGRAM IFT09860 03/04/86 15858 FROM 02/16/86 TlftU 02/27/86 Page 25 of 35 LMIT 02 SWRY RETIRED TO WO KPT SERVICE MARK NLMBER NUMBER WO TITLE HISTORY SLD9tARY 0228 02/24/86 02-RH -MOV -2720A 030997 LEAKOFF LINE NEEDS REMOVING REMOVED LEM-OFF LIE TEN REINSTAL LED LIE AFTER STUD REPLACEENT.

1 MODE /ECHANISM NA 0220 02/24/86 02-SI -

-50 031052 STUD REPLACEENT MODE /ECHANISM NA REPLACED STUDS MD TORGED TO 103 1

0228 02/25/86 02-MI -MISC-STUDS 030483 PRECUT ALL B7 VALVE STUDS AS MOK/ECHANISM1 NA PER MMP-C-O-001 CUT STUDS AND STAW ED B-7 AND NUERICAL SE0LENCE ON STUDS FOR 42 (MIT STUD CHANGE OLH 0228 02/25/86 02-SI -

-241 030881 REPLACE ALL STUDS REPLACED STUDS AND NUTS AND TOROUE TO 700 FT LB MODE /ECHANISM: NA 0228 02/26/86 02-CH -

-291 030453 REPLACE ALL 12 STUDS WITH B7 C MODE /ECHANISM! NA BOLTS REPUCED WITH B-7 STUDS CARBON STEEL STUo N TO 130 FT W 0228 02/26/86 02-SI -

-109 030891 REPLACE STUDS. RESLLT OF MODE /ECHANISM N/A TESTING 43 STLE PM 3/4"TISEAD MJT F VALVE BODY. TAPED HOLE AND INSTALLED STUD. CHANE ALL STUDS DE AT A TIE Als TORGED TO 2300 FT/LB 0228 02/26/86 02-SW -P

-108 030759 REPLACE ECH SEAL MODE: SEAL LEAK ECHANISM BAD SEAL REMOVED MOTWt MS SLFPORT REMOVED Ptw FROM SYSTEM, INSTALLED SPARE Ptw Ape REll6TALLED lETWt AND SLFPORT,TmolED MOTOR SLFPORT TO 0228 02/27/06 02-CH -HCV -2310 031053 UAL W LtAKS, FURMANITE MODE: BODY TO BODGET LEAK.

ECHANISM: NMMAL EAR.

REINICTED BODY TO BWeET WITH FUtMANITE NUCLEAR ORADE COPPOLMD.

0228 02/27/86 02-MS -

-76 031226 FlRMANITE LEM MODE! PACKING LEAK ECHANISMt NWIMAL EAR.

REINECTED PACKING LEAK WITH FlRMMITE GRADE C0pF0lMD l

0229 02/20/86 02-CS -P

-3 029935 PM - (M DEMAND BRIDGED AND EIEERED MOTOR. INSTALL l

ED EW (NIEAGE. RAN MOTWt NFS ERE 1

SAT. PERFORED PM CS-P-E/R1 0229 02/20/06 02-HG -CP -RECOM 030946 PM CONTROL PAEL H2 RECORDER FERFORED PMS ON 2-HG-CP-RCOM-HYDROGEN RECOMBIE R. PMS WAS SAT AND CONTROL R0(M DID PT-37.1 IMICH WAS AL80 SAT 2/20/96 MODE! ECHANISM:N4 0229 02/20/06 02-RH -H

-1A 030706 CK. Rift MOTOR OIL LEVEL ADE D OIL TO MOTOR LEVEL INCREASED A LITTLE TE N STARTED LEAKING.0IL WAS COMING OUT OF INSIDE F MOTOR AT BAGE ADD APPROXIMATELY 11/2 GAL OIL WAS ABEIT 1/4 WAY LP SI(HT 0229 02/20/86 02-RH -M

-1B 030707 CK.RWt MOTOR OIL LEVEL OIL LEVEL OK PROPER LEVEL WAS IN SIGHT (LAGS.(MODE ECHMISM NOE) 0229 02/20/06 02-RP -REL -RLL 030872 C E CK OUT RELAY FOR PROPER RELAY RLL TESTED SATISFACTORY TIMrNO MODE /N/A

~

JEPCO SAFETY RELATED DURING REDUCED POWER SURTED BY UNIT AND DEPARTMENT PROGRAM WPT09860 03/04/86 15858 FROM 02/16/86 TlftU 02/27/86 UNIT 02 SURRY Page 26 of 35 RETURED TO WO DEPT SERVICC MARK NLMBER NLMBER WO TITLE HISTORY

SUMMARY

ECHANISM/N/A 0229 02/20/86 02-RP -REL -RLRX1 030874 62 MISC RELAY RACK RELAY RL-RX1 CECKED OUT SAT.

0229 02/20/96 02-SW -P

-103 030447 DISCOPOECT FOR ECHANICAL DEPT DISCGGECTED MOTOR FOR ECH RECG4ECTED MOTOR TOOK APFS READING. TAPED MOTW LEADS FWt 480V APPLICATION. OPS TEST RAN FUF SAT.

MODE /ECHANISM N/A 0229 02/21/86 02-VS -F

-60B 031021 SOLENDID IN AIR StFPLY LIE FOLMD SOV SHORTED. REPLACED WITH 1

EW SOV. FAILLRE MODE:WILL NOT OPEN l

FAILlRE ECHANISM: SHETED. TESTED CPENING AND CLO6ING OF DAPPER MOTOR WITH FAN ON AND OFF WORKED SAT.

0229 02/23/86 02-RM -HTT -259 030816 CECK OUT EAT TRACING ON LOAD CECKED TAKEN ON EAT TRACE.

P! PING DARWING 3.9 AfFS SHOWIE 117 FT EAT WORKING. APPROX LENGTH OF TRACE SHOWING EAT TRACE IS SAT.

0229 02/25/86 02-CH -TV -2204 031397 YALVE WILL NOT OPEN READ C-3 TO X-2 BEHIND VERT,BD IN C(MT R0(M SEEM6 TO BE AT VALVE.

ENT TO VALVE AND HAD (FS CYCLE.

SOV PICKED UP. DISCOP0ECTED AIR LIE FROM SOV TO VALVE AND GOT (FS 0229 02/25/86 02-EP -IER -10 030856 BREAKER TRIPPED INVESTIGATE MODE /ECHANISM NA. INVESTIGATED SUPPLIES POWER TO SAFETY NEMEt PROM D1 AT PM. 2-1 CKT 10 FOLMD BREAKER ON. CYCLED ALL VALVES RELATED VALVES THAT E RE FED OFF BREAKER 10 F0lMD NO PROBLEM WITH BREAKER AFTER 0229 02/25/86 02-EFM-REL -2HNT 030467 PERFORM SPECIAL "AS F0lMD" TES PERFORED A6 F0lMD TESTING ON 2H TESTrta LMDERV(LTA(E Als DEGtADED V(LTAE RELAYS. TESE RELAYS ERE TEN REPLACED LMDER DCP-66-02 MODE!ECHANISM: NA 0229 02/25/86 02-EFtHtEL -2. ANT 030459 PERFMM SPECIAL "AS F0lMD" TES PERFORED AS FOLMD TESTING ON TE TESTING 2J NTAE NS KGtAED VG. TAG E RELAYS.TESE RELAYS EFi TEN REP LACED LMDER DCP-86-02. MODE /EOiANI SM/MA 0229 02/25/86 02-RC -P

-1A 023530 FAILED HORIZONTAL FRN E MODE! DID NOT OPERATE ECHANISMt (#0(N0lm CALIBRATED VIBRATION ETER LMIT 2 BENTLY EUADA. VIBRATI(M PROBE MISSING (A) RCP MTR (M GtDER FR(M 0229 02/25/86 02-RC -P

-1B 031083 "B" RCP LFPER OIL SIGHTGLASS ADDED 2 GALLONS OF OIL TO UPPER 0229 02/25/86 02-RI -N#4 -CA1 030949 ALARM IN FOR N0 VN.ID REASON MOIE/ECHN4 ISM: M. VERIFIED ALARM i

CARD OKAY.

0229 02/25/86 02-RM -MISC-N/A 031027 REPLACE MOTGt BENtING REPLACED BEARINGS, TESTED, RAN SATISFACTGtY 1630500/620322 BEARIE i

1631140/620522 BEARING i

0229 02/25/86 02-RM -P

-259 025969 AS FER RANDY JORDAN MOTOR REMOVE (LD PILLY AND REPLACED WITH l

EW PtLLY AND ADESTED BELTS i

MODE! NWIMAL EAR EDtANISMI CRACK 0229 02/25/86 02-RP -BKR -BNORM 031049 MEAKER CONTRG. CIRCUIT BLOW 6 MODE!OPDED ECHANISM! END OF LIFE REPLACED FUGE AND CYCLED BREAKER i

APPROX 15 TIES NO FUGES ELD UP 0229 02/25/86 02-RP -REL -ISTDX 030871 DECK OUT RELAY FOR PROPER MODE!E04ANISM! NA OPEN N f, 02-ftP-REL-15TDK TESTED RELAY IN 1.5 SECOND6 RELAY OFF 29.7 SECONDS TIMING SAT.

0229 02/25/86 02-RP -REL -RLR-X 030873 DECK OUT RELAY FWt PROPER RELAY RLRX TESTED DR(FPED OUT IN OPENi.4 9 SEC. RELAY TESTED SAT. 2/20/86

O Page 27 of 35 MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO.

2 MONTH / YEAR Feb. - 1986 The below listed codes denotes the following departments:

0228 or R03 Mechanical 0229 or R04 Electrical 0237 or T22 Instruments i

KICO SAFETY RELATED I1 RING REDUCED POER SORTED BY UNIT AND DEPARTENT FROGRAM WPT09860 03/04/86 15:50 FROM 02/01/86 Ts u 02/09/86 I

Pa8e 28 of 35 UNIT 01 3.RRY RETIRED TO WO DEPT SERVICE MARK Hl.MBER NUMBER WD TITLE HISTORY

SUMMARY

0228 02/01/86 01-BD -TV -100A 029967 VALVE HAS PACKING LEAK VALVE PACKING LEAKING. REMOVED 4 RINGS OF PACKING AND ADIED 8 RINGS TO IT. PACKING NO LONGER LEAKING.

0220 02/01/86 01-CH -FCV -1122 030040 VALVE WILL NOT FULLY CLOSE.

ADJJSTED STROKE. VALVE STILL LEAKS BY. PLUG DOES MAKE CONTACT WITH SEA T. EED TO WORK V4LVE SEATS.

nR 4299539 SUBMITTED 0220 02/01/86 01-CH -P

-2A 029549 PM - ON IEMAND LUBRICATED COLFLING GUARD WITH AM0 LITH 42 GREASE 0220 02/01/86 01-MS -

-120 015898 VALVE IS VERY HARD TO A6 FOLMD PACKING GLAND ALMOST BOTT OPERATE GED GJT AND STEM WT GALLED. REMOV

)

ED HANDWEEL OPERATOR,AND STEM MJT DEBLERED STEM NUT TO PREVENT GALLIN G TO VN.VE STDI TWEADS AND LUIRICA 0220 02/01/86 01-SI -

-56 029794 REPLACE 20 0F 20 STUDS WITH STUD SIZE 1"X 6"-8 1

CARBON STEEL STUOS.

VOID PET REGJIRD. STIM ACCDTAILE 0220 02/01/86 01 -91 030014 REPLACE ALL STUDS (12)

REMOVED ORIGINAL STUD 6 OE AT A TIEMEPLACEB WITH B-7 STUDS, TOR-OLED TO 700 FT LB6. WITH SOC 41285 TORGE nRENCH EW STIES AND 12 EA.

1 1/4"X 8 6 1/2 LONG.

0220 02/01/86 01-SI -

-94 029982 REFLACE N.L 12 STUDS WITH B7 STUDB AND MJTS REPLACED AS PER WO CARBON STEEL SUTDS STUDS lERE B-7 MAT. TORG.E nR. SOC 1471 700 FT/LB6.

0228 02/01/86 01-SI -MOV -1864B 019837 OE PIN NOT C0ffLETELY REPt. ACED RGl. PIN IN SHAFT TO INSTALLED AT HANOWHEEL E

0220 02/01/86 01-nFP-PH -86 029889 NUT HISSING ON BOLT SIZE OF CUT 2 EW NUTS TO HALF SIZE IN sOLTS LATE. IN6TALLED EW NUTS WITH 2 5/16" SOCKET. JAP 9ED 2 ND HALF MJT AGAINST IST HALFNUT

0220 02/02/86 01-CH -

-430 030101 REFLACE 2 0F TE 12 STUDS S.S.

REFtACED N.L S11JDS AND MJTS WITH B-7 AND TOROLE TO 130 FT LBS FAILLRE MODE!NA FAILtRE ECHANISM NA 0220 02/02/86 01-RC -

-24 030017 REPLACE 12 STUD REMOVE MD REPLACE STUDS DE AT A TIE USING B-7 MATERIAL TOR 0 LED TO 150 FT LBS SOC-1087 0228 02/02/86 01-RP -BkR -A-BYP 029744 REPLACE WT COIL ON BREAKER SUBMITTED 89.15. INSTALLED W COIL G4 1-RP-BKR-A-BYPASS. 1/27/86.

TESTED LNTA. TESTED AS PER EPP-C-EP CR-69 AND OF-DB-E/A1 UVTA (FERATED SAT 2/1/86. MODE /ECHANISM NA 0228 02/02/86 01-SI -

-46B 029772 CHANGE 0UT 12 0F TE 20 S.S.

REMOVED OLD STUD 6, REPLACED WITH EW CARBON STEEL STUD AND MJTS TOREED A6 PER PROCEDLRE.

TORMED STUD 6 368FT/LBS.

0220 02/03/86 01-BD -TV -100E 019420 HIGH FLOW SOLENOID HA6 AIR NO AIR LEAK F0lMD ON VALVE OR LEAK BETWEEN IT AND TOP VALVE IMLDEID 1-BD-TV-100C FEEDIIE AIR TO TE VN.VE. OP SAT.

0220 02/03/96 01-CH -

-272 027054 PACKING R.AND STUD BROKE OFF REMOVED BRG(E STUD / REPLACED WITH EW STLE AND NL!T 0220 02/03/86 01-CH -

-309 030005 CHANGE 10LTING FROM B-6 TO B-7 REMOVED OLD STUD 6 AND INSTALL MATERIAL EW STUDS AND TORGED STUDS 130 FT/LB6

e

  • e 4

i KPC0 SAFETY RELATED DLRING PNTD POWER SORTED BY UNIT AND DEPARTENT PROGRAM WT09060 03/04/86 15:50 FROM 02/01/86 T)RU 02/09/86 LNIT 01 SLRRY Page 29 of 35 RETLRED TO WO IEPT SERVICE MARK NLMBER NLMBER WO TITLE HISTORY SUPMARY 0228 02/03/86 01-CH -

-312 030103 REFtACE 10F T1E 12 STAIM.ESS REMOVED TE 01 AND #2 STUD AND REPL STEEL STUDS WITH CARBON STEEL M STUN AW RETM.ED(E 43 STuo STUD PEMOVE ALL NLITS AND REMOVE VALVE CAP. REMOVED VALVE CAP.

REMOVED BROKEN STW INSTALLED EW 0229 02/03/86 01-CH -MOV -1296A 029770 STUD REMOYAL REPLACE 12 STUD 6 REMOVE 16 STUD 6 AND WTS AND REPLAED WITH 16 STUD 6 B7 AND 16 NUTS. STAWED FLANGES WITH TOROLE SEMENCE NLMBERS.

TOROLED STUD 6 270 FT/LBS.

0228 02/03/96 01-CH -MOV -1299A 029731 REPLACE 10 STUDS WHICH ARE MAR REPLACED STUD 6 DE AT A TIE.

MARKED WITH YELLOW WITH 0-7 T(REED STUD 6 AS PER T[RGE MATERIAL Fit 0CEDLRE. FAB TOOL TO T[REE TE STUD 6. TOROUED STUD 6 TO 1100 FT LB6 0229 02/03/66 01-CS -M(N -100A 030130 REMOVE AND REPLACE STUD 6 REMOVED 16 EA. 3/4"-10X3 1/2" EX EAR CM SCREW 6 (OE AT A TIE) RE-PLACED WITH 3/4"-10X4 1/2 B7 ALL-T) READ STUD 6. TOROLED SME TO 150 FT./LB.

0220 02/03/06 01-DA -TV -100A 030120 FABRICATE AND INSTALL LIMIT SW FABRICATED (3) NtM6 FOR LIMIT SWITCH SWITCES FR(M 21/2 X 1/4 FLAT BAR ELECTRICAL DEPT HA6 WO TO INSTALL TE (3) BRACKETS 0228 02/03/86 01-DA -TV -100B 029147 OVERHALA. 2"FISER-TYPE-667-ES REMOVE VALVE FROM SYSTEM,DISAMBLE VALVE LAP SEAT AND PLUG. PASS 16 4 TESTING BEFORE REINSTALLATION.

0229 02/03/84 01-E -

-63 030102 REPLACE 3 0F TE 12 S.S. STUD 6 REPLACED STUD 6 AND WTS WITH B-7 AN D TIROLED TO 150 FT LB6 WITH ANOTE R FINAL PA66.

0229 02/03/86 01-RC -HCV -1549 029917 BODY TO B0peET LEAK REMOVE VALVE BOP 0ET AND ACYUATOR ASSEMBLY FR(M SYSTEM. INSTALLED EW COPPRESS(R ASSEMBLY AND DIAFtRAGMQA ND REINSTALL BOGET ACTUST(R ASSEMB LY IN SYSTEM.

0229 02/03/86 01-RC -HOV -1535 030056 REFLACE 3 0F TE 12 STUD 6 WITH STUD 6 REPLACED WITH B-7 MATERIAL 8-7 CARBOld STEEL STuo AS PER WO. REPLACED ALL 12 STUDS T(ROLE STW6130 FT LB 0220 02/03/86 01-RC -MIN -1536 030055 REPLACE 3 0F TE 12 STUD 6 WITH 2-2-06COPFLETED PR AS PER P-7 CARBON STEEL STUO pgp.g.G-001.2 PN TOROLED STUD 6130 FT/LBS.

0220 02/03/86 01-RC -PCV -1456 030156 AIR LEM ON DOE REMOVED (1.D DIN 45tAGM INSTALLED EW DIAPP5tAGM. CECK F(R LEAK WITH OPERATIONS VALVING IN AIR. TEST 000D 0220 02/03/86 01-RH -

-2 030125 REPLACE ALL 20 STUD 6 S.S STUD 6 WORMED 01-RH-02 IN ACCORDANCE WITH PROCEDLRE P99-C-(H)01.2. REPLACED ALL STUD 6 AS PER PROCEDLRE.

TOROLED STUD 6 600 FT/LB6 0229 02/03/86 01-RH -RV -1721 030008 REPLACE 9 B6 STUD 6 WITH B7 VERTICAL FLANGE TAKES 3/4" X 4" MATERIAL BOLTS 8 STUD 616 WTS. HORIZONAL F1)NGE TAKES 3/4 X 51/4" BOLTS 8 STUD 616 WTS. NOTE VERTICAL FLMGE HAD BEEN LEAKING ALSO 0229 02/03/86 01-SI -

-130 029965 REPLACE ALL 16 STUDE WITH REPLACED ALL STUD 6 WITH B-7 AND CARBON STEEL STUO TOROLED TO 2400 FT LBS

JEFC0 SAFETY RELATED DWING REDUCED POER SORTED BY UNIT AND DEPARTENT PROGRAM WT09860 03/04/86 15:50 FROM 02/01/86 TWdJ 02/09/86 UNIT 01 SURRY Page 30 of 35 RETWED TO W

DEPT SERVICE MMK HlMBER NUMBER WO TITLE HISTORY

SUMMARY

0228 02/03/86 01-SI -

-229 030016 REPLACE 12 STUDS REMOVED OLD STUDS DE AT A TIE 12 EA AND REPLACED WITH EW B-7 1 1/4" 8 TW EAD X 6 1/2" LONG AND TORGED SAE TO 700 FT LBS 0228 02/03/86 01-SI -

-238 030012 RERACE ALL STUDS (12) 2-3 0530 CHANGED OUT STUDS 1

)

TEU 9 AND INITIAL T(RGE-TOOLS ON 4

STAGGING.2-3-06 CHANGED STUDS 10-12 AND FINAL TORGE ON ALL 700 FT/LBS 0228 02/03/96 01-SI -

-239 030013 RERACE ALL STUDS (12) 2-3-86 REPLACED STUDS AND TORGED S#E AS PER PROCEDWE PDF-C-G-001.2 TORGED 700 FT/LBS 0228 02/03/86 01-SI -

-240 029983 REPLACE ALL 12 STUDS WITH B7 REMOVE OLD STUDS AND RERACE WITH CARBON STEEL STUDS B-7 STUN AS pot PN TOROLE STUDS TO 700 FT/LBS 0228 02/04/86 01-DA -TV -100B 030206 FLANGE ON DOWN STREAM SIDE AS F0lMD, PACKING GLAND NOT PR(FERL LEAKS Y ADJETED. AI.2TED 18 FLATS. 3/8" 0F PACKING GLAND LEFT FOR FUTIRE ADJUSTENTS. AS LEFT, VALVE PACKING ADJJSTED AND NOT LEAKING.

0228 02/04/86 01-RC -PCV -1455C 030211 UALVE LIFTS AT 100 PSI RESET AS FOLMD! LLIFT PRESSLRE AT 52 PSI VALVE PLUO LIFT ADJETED LIFT PRESERE TO 55 LBS PSI. SET VALE STR(EE.AS LEFT VALVE OPERATI(MALLY SAT. LIFT TIE 1.5 SECONDS. PT REQUIRES MAXIltJM OF 1.7 0228 02/04/06 01-RC -PCV -1456 030202 CHANGE AIR LIES TO 3/8" CHANGED 1/4" FLEX SS AIR LIE FROM 80LEH0!D TO SIM4mAGM TO 3/8" 0228 02/04/86 01-RH -NOV -1720A 030019 CUT VM.VE LEAK 0FF LIE TO PACKING GLAle LEAK OFF LIE WAS IN FACILITATE STUO REPLACEMENT TE WAY F SYl2 REPLACEENT. CUT LIE BEHIND STUDS AT ELD AND CLEAN ED PIPIM. FIT AND M fn PIPING AFTER STUDS ERE REPLACED. CLEAED 0228 02/04/86 01-SI -NOV -1865A 030020 CUT VMNE LEAK 0FF LIE TO PACKING EJMD LEAK FF LIE WAS IN FACILITATE STUD REPLACEMENT TE WAY F CHMEIDE MJT STUDS. CUT PIPE OUT AT ELD BEHIND STUDS AND CLEAED PIPING. FIT AND ELDED PIPE BACK IN PLACE AFTER EW STUDS ERE 0228 02/04/86 01-SI -NOV -18658 030021 CUT VALE LEAK 0FF LIE TO PACKING GLAND LEAK OFF LIE WAS IN FACILITATE STUO REPLACEMENT TE WAY F CHANGIDE (RJT STUDS. CUT PIPE AT ELD BEHIND STUDS AND CLEAN ED PIPING. FIT AND WI rn PIPE BACK IN PLACE METR EW STUDS ERE INSTA 0228 02/04/86 01-SI -MOV -1865C 030022 CUT VALVE LEAKOFF LIE TO PACKING OLAND LEAK OFF LIE WAS IN FACILITATE STUD REPLACEMENT TE WAY F QWEIDE SJT STUN. CUT LIE IN ELD BENDS STUDS AND CLEAN ED PIPING. FIT AND Wlin PIPE BACK IN PLACE MTER STUDS ERE REPLACED 0228 02/05/06 01-BS -NISC-HATCH 030393 IteER DOOR (EERG.) HATCH DISASSDSLED LOCKING PIN F0lMD IRGEN 1/4" R(X.L PINS REPLACED ROLL LOCK!NG PIN BROKEN

f KPC0 SAFETY RELATED DLRING REDUCED POWER SORTED BY UNIT AND DEPARTENT FROGRAM 6FT09660 03/04/86 15:50 FROM 02/01/86 TMtu 02/09/86 Page 31 of 35 RETIRED TO W

DEPT SERVICE MARK MMBER EMBER WO TITLE HISTORY SUNRY PINS A6 INSTRUCTED BY J. WILLIAMS SUBMIT EWt TO EVALUATE TE SUIT-ABILITY OF TE SG.ID PIN 0229 02/05/86 01-CS -MOV -101B ' 030352 GCIR S86-12 2 STUD 6 HAE LESS REPLACED 66 AND $7 STUDS A E THEN MIN! MUM THREAD ENGAGEMENT I OA E AO E U S O l*2 TOROLED STUD 6 TO 150 FT/LBS 0220 02/05/06 01-RC -PCV -1456 030158 REPAIR AIR LIES FROM BOTTLES REMOVE OLD PIG FAIL LIE AND INSTAL TO PORVS AS NECESSARY TO STOP LED EW PIG TAIL AIR LIE FR(E AIR CYLIN0ER TO MANIFOLD.

ggag 0229 02/06/86 01-CS -MOV -100B 030349 GCIR 86-12, 23 STUD 6 HAVE LESS REMOVED Dm.TS AND REPLACED B-7 STUD 6. TOROLED TO SPEC'S TGt0ED STUD 6150 FT/LBS.

0229 02/06/86 01-DG -

-66 030360 REPLACE COVER GASKET REPLACED Q.D GAGKET WITH EW GASKET MADE FROM 1/16" SEET MATERIAL TORGE NUTS TO 45 FT/LBS i

0229 02/06/86 01-SI -

-241 030l?2 INSPECT YN.VE IAW PT 19.11 INSTALLED 12 EW STUDS & 12 EW EITS 1 EW GASKET. ALSO TORGED EACH ST W TO 700 FT/LBS AND THAN ON E COPF. PASS 0220 02/06/86 01-SI -

-58 030353 GCIR 86-13 2 STAIM.ESS STEEL CHNGE STUD 6 AS PER PfF-C-G-001.2 STuo TORGE TO 270 FT LDS 0229 02/04/86 01-VS -MOV -100B 030403 ADAET PN: KING ADAETED PACKING G.AND FM i M11 TIR N WTS 6 FLATS EA04. 5/16" (F PACKIE ADJETENT REMAINIE 0229 02/07/86 01-BD -TV -1004 023490 TV-BD-100A INDICATES INTER-ENT INTO CART AND LOCATED YALE.

MEO! ATE WHEN OPEN EPOVE SWITCH COVER AND FGMD SWITC H MODE A6 PER ESR. SWITCH WAS CLEAN WITH NO MOISTLRE. PROBLEM D(M'T SEE N TO E IN SWITQi 0228 02/07/86 01-BD -TV -100B 030341 ADlET PAD;ING ADE6T PACKING GLAND F(LLOER MJTS B FLATS. LEAK (FF WA6 MytRE20US BEFWlE ADAETPENT. LEAK SLOED TO A FEW DNPS, Fm.LDER HA6 OM.Y APPR OX. 3.8" TRAWL LEFT.

0228 02/07/86 01-BS -MISC-NA 030399 SLPPORT PLATE WT IS LOOGE T(RGE BE.TS DE BG.T HAS ROLMDED FLATS. TIOHTEED THAT (BE STUD WTI L SElG 1/2" STW 3/4 WTS 55 FT LB 0229 02/07/86 01-CH -

-314 030399 ADJUST PMXING ADJETED PN: KING A6 PER WD. WAITED

  1. PROX 3 MIN. RETUDED AND CECKED FGt CONTIEJOUS LEAK. FEMD NOE.

NOTE. PACKING ADJJ6TPENT NLITS ALMOS T TO TEIR FIA.L ADal6T LFON CDPFLET 0229 02/07/96 01-04 -EV -1310A 030107 BODY TO 90>0ET LEM PACKING RETORGED VALVE BOP 0ET MJTS LEAK NO LAGGING OR STA00!NG NEEDED 0229 02/07/06 01-CH -P

-1A 029574 INSTALL MD REMOVE VENT RIG INSTALLED VENT RIG SECLRED R##(

FUM0E AT VENT RIG SITE. REMOVE VENT RIG AND ST(RE IN QBICLE l

1

O r

JEPCO SAFETY RELATED DLRING REDUCED POWER SORTED BY IMIT AND DEPARTENT PROGRAM l@T09860 03/04/86 15850 FROM 02/01/86 TMtu 02/09/96 LMIT 01 SLRRY Page 32 of 35 RETLRNED TO WO DEPT SERVICE MARK MMBER MMBER WO TITLE HISTORY SLMMARY 0229 02/07/96 01-IC -MISC-D4 030394 THIMBLE D4 HAS LEM AT SEAL MMfED OUT TE SEAL TABLE FOR LEAKS t

E HAW 3 THAT HAW HDISTlRE (ETESS) AROLMD TE AXIS OF TE FITTIN06 2/5/86 0229 02/07/96 01-RC -

-77 030397 ADJU6T PACKING ADW6TEDPACKINGASPEkWD. WAITED APPROX 3 MIN. RETIRED Ape CECKED F FOR CONTIMJOU6 LEAK. NOE FOLHD.

NOTE PACKING ADJJSTENT MITS ERE ALMOST TO TEIR FILL ADESTENT 0229 02/07/96 01-RC -PCV -1455A 022765 BODY TO BOMET LEAK REMOVE RVE B000ET FROM SYSTEM.

(MABLE TO CECK PLUG & CAGE DLE TO BOTH READING 10R ON CCNTACT. REPLAC E STEM, PLUG, CAGE Ale ALL GASKETS CECK GAGKET SLRFACES.

0220 02/07/86 01-RC -PCV -1455C 029759 DISCG;ECT REC 0p0ECT SR SOV SUBMITTED 99.15 1/27/86 REMOVED LIMIT SWITDES FROM PCV.

REPLACED LIMIT SWITDES. HAD CONTRO L ROOM CYCLE FGt LIGHT VERIFICATION M. MVE (PERATED SATISFACTGtY.

0228 02/07/96 01-RC -PCV -1456 030070 DIAPWtM 3 AIR LEAKS p%RKED TIGITDED BOLTS AROLDO DIAPHtA6M TO l

WITH RED TAPE STF LEM i

! 0229 02/07/86 01-RC -PIPE-NA 029740 INSTALL STAND PIPE AfG VENT INSTALLED DE VENT RIG IN TE j

PRESSLRIZER CUBICLE Ape OPE IN C LOIPO R0(M A6 PER DIRECTION F H.

PO(RE.

1 0229 02/07/86 01-RS -MOV -155A. 019953 TCP (MIWRSM. BOTTOM PIN MISSamPIN NOT FLUSH AGAINST REACH ROD 4

A COTTER PIN ATTACEENT. A6 LEFT! IROVE PIN IN AND INGERTED COTTER PIN.

MS INEERTED PIN 0229 02/07/96 01-SI -MOV -1995A 030173 COWR PLATE BG.TS MISSING FOLAS 2 B(LTS MIS 6ING GJT F LFPER

(

EARIPE CAP. INSTALLED 2 3/8 X 1 1/4 SOCKET E AD CAP SCE W6.

0228 02/07/96 01-SI -TOV -1995B 030174 COVER PLATE BG.TS MISSING FOLBC 2 BE.TS MISSIMi OUT F LFPER BEMtING CAP. INSTALLED 2 3/8 X 11/4 900ET EAD CAP SQtEWS 0229 02/07/96 01-SI -MOV -1985D 030135 REM (NE & INSTN.L KW POSITION IEWVED POSITION IDSICAT(R FROM YALVE. RECGtDED DIENSIONS F IN-DICATCR (M PAPER F(R UEE IN MANU-FACHRE F GE.

0229 02/01/86 01-BD -TV -1004 030003 RENNE LIMITS F(R ECH. REINST IE WVED LIMIT PLATE HAD TO MOVE REINSTALL WHEN REQUESTED.

MTTG4 9WLM TO ET PLATE FF.

90LLD IEPUCE ALLEN EAD 5/16" WIT H EX EAD ALLEN EAD BEHIND SWITCH REPUED LIMIT SWITDES.

0229 02/01/86 01-RP -BNR -AN(RM 029687 PM - (M DEMNO PERFCRED PftfC-DD-E/A1 COPFLETED 2/1/86 0229 02/02/86 01-RP -BKR -A-BYP 029685 PM - ON DEMAND SLAMITTED 99.15. CopFLETED PMS PC-DD-E/A1 BREMER TESTED SAT INSTRLDENT DEPT P0tFGDED PT 81 IREMER (P0tATED SAT.

0229 02/02/86 01-RP -IWGt -NORM 009958 REPLACE A MD 9 PHAGE NtC ARC DEUTES REPUED 1/28/86 (M A AND D PHME FOLSE CRACKS IN PGtCELIN MODEt CRAQ(S EDMNISMI EAR, AGE

- -~. - -.- -----..._-.-.--..-

O Is KPC0 SAFETY FELATED ttIRING Rmrrn POER SORTED BY UNIT AND DEPARTENT FROGRAM WPT09060 03/04/86 15:50 FROM 02/01/86 Tm u 02/09/96 Page 33 of 35 UNIT 01 SLERY RETURED TO WO KPT SERVICE MRK NUMBER NUMBER WO TITLE HISTORY

SUMMARY

0229 02/02/06 01-RP -BKR -B-BYP 029686 PM - ON K MAND 89.15 SUBMITTED PERFORED PM-PC-DB-E/A1 OH 1-RP-l*R-B-BYP TW U STEP 5.23.6 COW LETED PMS PC-DB-E/A1 BRENER OPERATED SAT. FW INST DEPT FERFORMED PT 8.1 BREAKER OF1 RATED 0229 02/02/96 01-RP -BhR -BNORM 029600 PM - ON IEMAND FttS COWLETE TEST SAT. itEFtACED LN COIL WO 3800030092 0229 02/02/86 01-RP -BKR -BNORM 030092 REFtACE TNT COIL ON BREAKER REFtACED LNT COIL 1/30/96 09.15 ATTAGED TO WO 3800029688 MODEt OUT OF SPEC ECHNIISMt OUT OF SFEC 0229 02/04/86 01-BS -MISC-HA 02MG6 DISCO >eECT PLANER FOR REMOVAL FEMOVED WIRING. DISC 066ECTED LIQUID TITE CONDUIT ID BRENER SPARE 0229 02/04/06 01-CH -HTT -MISC 023902 PM. 2A2 CKT 18 HAS LOW READING CKT 2A2-18 CECKED SAT LAEN 1-PT-27I WAS PERFORED 1/21/86 0229 02/04/86 01-CH -NOV -1289A 029961 INTEREDIATE LIGHT INDICATION OFERATED IN CONTROL ROOM. EVERTHING RAN SAT AND WA6 ACCEPTED BY SHIFT SLFERVISOR HANICUT AND SIWSON 0229 02/04/86 01-DA -TV -100A 029958 ADJUST LIMITS VALVE SHOWS INTE REPLACED ACTUATING ARM. CYCLED INTERMEDIATE EVERTHING SAT. ARM HAD FALLEN (FF OF VALVE STEM, THATS WY VALVE MD INTEREDIATE LIGHTS.

0229 02/04/96 01-EPC-REL -RT2 030153 CLEAN RELAY VACLADED AND CLEAED RT2 XA.-YA 0F ACCUMA.ATED DUST 2/1/86 CLEAED N4D VACULDED BOTTOM OF CABIET 0229 02/04/86 01-EPC-REL -RT3 030151 CLEAN RELAYS VACultE RELAYS AND CLEAED RT3 XA-YA RT4 XA-YA AND RT5 XA-YA 0F ACCLMA.ATED DUST 2/1/86 CLEAN AND VACUUED EGITOM OF CABIETS.

0229 02/04/96 01-EFC-REL -1XB 030150 CLEAN RELAYS VACULDED 44D CLEANCD RELAYS 1XB-YB/6XB-YB/7XB-YB CLEANED NID VACUUMED BOTTON OF CABINETS.

0239 02/04/86 01-EPC-REL -2XB 030140 CLEAN REl.AY 2XB-YB VACLAAED AND CLEAED RELAYS 2XB-YB. CLEAED AND VACLAAED MTTOM OF CABIETS.

0229 02/04/86 01-EPC-REL -3XB 030149 CLEAN RELAYS VActMED AND CLEMED RELAYS 3XB-YB 4XB-YB 5XB-YB 2/1/96 CLEMED AND VACLADED BOTTOM OF CABIETS 0229 02/04/86 01-EPD-IC -1A1 024089 EWRE B4-140, LOWER TE HI VOL-ALARH: PICK-lP 140V DR(P OUT 134.5V TAGE alt.RM SETPOINT MTED AS PG INSTRLETIGd MAWAL POER CONVERSION PRODUCTS INC.

ADJUSTENT BAND ON ALARM DROP OUT WASN'T WIDC ENOUGH TO ADJJST DROP 0229 02/04/86 01-EPD-Z -1A2 024069 EW 84-140, LOER TE HI VOL-SET TE PROPER SET POINT ACCORDING TAGE ALARM SETPOINT TO MAWAL 1/28/06 SET HIGH VtX.TAGE ALARM 135 0 LOW 140 HIGH. HIGH VOLTAGE SWT DOW 145. LNABLE TO OBTAIN TE 136V DROP OUT OF TE 0229 02/04/06 01-EPD-BC -1B1 024070 Em 04-140, LOER TE HI VOL-DROP OUT f 135.3 V PICK-lP 140.0V TAGE ALARM SET!'OINT TIC LRT (XJT POTENTIAL 0ETER RANGE IS NOT WIDE ENOUGH TO DROP TE LIGH

A E

,e KPCD

" SAFETY Rf1ATED DURING REDUCED POWER SORTED BY UNIT AND DEPARTMENT FROGRte WPT09860 03/04/86 15:50 FROM 02/01/86 TlftU 02/09/86 LMIT 01 SLRRY Pago 34 of 35 RETLRED TO 60 IEPT SERVICE MARK NLMBER NLMBER WO TITLE HISTORY SQ9tARY T OUT 9136 V HVS SWT OFF AC BREAK ER 9 144.9VDC ADJUSTED ALARM POINT 0229 02/04/86 01-EPD-BC -1E2 024071 EnR 84-148, LOER TE HI VOL-DR T S OUT 9 134.3V PICKS LF 9 139.9 TAGE ALARM SETPOINT TE MW M POTENTIALGETDt M IS NOT WIDE ENOUGH TO DROP TE LIGH TS OUT E 136V. HSV SHJTS OFF AC BREAKER 9144.9 DC. ADJUSTED ALARM 0229 02/04/86 01-FW -MOV -151D 029937 DISCG4ECT FOR ECH. REC 004ECT DISC 014ECTED MOTOR AND LIMIT SWITCH 1/28/96. REMOVED LIMITS SWITCH AND WHEN REQUESTED TGt0LE SWITCH ALSO REPOVED MOTOR FOR ECHANICAL DEPT 1/29/86. HunKED LP AND PERFORED EF-C-MOV-11 SAT 0229 02/04/86 01-MS -MtV -101A 012695 REPLACE FEEDER BREAKER FROM INSTALLED EW 175 AW BREAKER, STOF9ED AT 61 ON PROCEDLRE 1/28/86 t2s eo i 7 s A:,

MOTOR ROTATION WAS CORRECT. TOOK A LOAD DECK. WORK PERFWtED IAW TYPE 1 TLRNOVER N-592 W-1099 0229 02/04/86 01-MS -MtV -101B 012696 REFtACE FEEDER BREAKER FROM REPLACED 125 A BREAKER WITH 175 A BREAKER EG CABLE WAS LMABLE TO 125 to 175 AMP CYCLE. MOTGt ROTATION WAS CGIRECT TOG ( A LOAD CECK. W[RK PERFGtED IAW TYPE 1 TLRNOVER N-592,r-1099 0229 02/04/06 01-MS -MtV -101C 012697 REPLACE FEIDER BREAKER FROM MOTOR EATERS nERE OUT OF LMIT BEF0 RE ANY WORK WA6 PERFWtED. Q.D FEEDER BREAKER WA6 REMOVED AND REPLACED A6 PER PROCEDLRE EF-C-EPL

-73 1/28/96 STOPPED AT 6.1 ON PROCE 0229 02/04/86 01-RP -REL -RLL 029376 CECK RELAY FOR PROPER OPERATI TIMING F RELAY CECKED AND WWtKED AND TIMING PROPERLY. INSTRLMNT TECHS ERE FRESENT IN TIMING CECK OF RELAY 1/30/86 0229 02/04/86 01-SS -TV -106A 011446 CLOSED INDICATION NOT WORKING ENT TO CONTROL ROOM AND CYCLED VALVE TMtEE COMPLETE TIES. LIGHT INDICATION FROM TE CONTROL ROOM WIRKED SAT. NO WORK PERFORED 0229 02/04/06 01-VS -MOV -100D 029999 VALVE' TCf51ES OUT IN CLOSED NtIDGE T1-2 6.62 T1-3 6.66 T-2-3 2

DIRECTION 6.62 MTL CKT 0 fu CGfiRG. CKT 12 M R INSTALLED EW MOTOR AND TEST MOV FOLMD WATER IN LIMIT SW COWARTENT CLENED MID DRIED LIMITS AND TORQlE 0229 02/04/86 01-VS -MOV -100D 030099 PERFORM PMB VS-MOV-E/A1 PMS MOV COELETE TEST SAT.

WORK COPFLETED ON WO 029999 0229 02/05/86 01-BS -MISC-HATCH 027647 BlLD6 ButNT OUT Gt MISSING RELA W INDICATING LAES STOCK 4 3450942 / 3451030 0229 02/05/86 01-CH -HT -2B2 021736 EAT TRACE CIRCUIT DID NOT REPLACED APPROX 6' 0F EAT TRACE FALL WITHIN TOLERANCE 0229 02/05/86 01-DA -TV -100B 030340 INVESTIGATE nMY VALVE CLOSES SET LIMIT SWITDES VALEE DECK GOOD 0229 02/05/86 01-SS -TV -100A 026652 VLV JLDFERED CLOSE INDICATES AILAJSTED LIMITS AND CECKED OPEN PRTUt LIG4T INDICATIGI 0229 02/06/86 01-DA -TV -100B 029799 DISC 0f0ECT AND RECOPOECT REMOVED SOY LIMIT SWITDES FROM TRIP VALVE.

0229 02/06/86 01-EPH-

-1JAO 030067 ROCESTER UNDERVOLTAGE RELAYS RELAYS TESTED AND CALIBRATED 0229 02/06/86 01-EPH-REL -UV1H 029824 TEST UNDERVOLTAGE AND DEGRADED TESTED LMDERYOLTAGE AND DEGRADED RELAYS.

l i

, T.

JEFt0

  • SAFETY RELATED DURING REDUCED POWER SORTED BY UNIT AND 1(PNtTENT Fit 0 GRAM WPT09860 03/04/96 15 'O FROM 02/01/96 TMtu 02/09/86 LMIT 01 SWRY Page 35 of 35 RETURED TO WO IEPT SERVICE MARK MMER MMBER WO TITLE HISTORY

SUMMARY

0229 02/07/86 01-BS -MISC-NA 030100 INSTALL EATERS FRISKING AREAS MOLMTED 2 SINGER 480 VOLT EATERS-RLN 10/4 AND 12/4 CORD DVEREAD. GA IN FOER FROM 3PH DISCOPOECT THAT FED TE m.D WASHING MACHIE.

CE ONRATION. OK 0229 02/07/86 01-BS -MISC-NA 030269 CECK MOTOR NtIIGE #iD EGGER MOTGt. FOLND DE FHASE TO GROLMD 2/3/96. BRIDGE A 36 B 15 C 9. EGGER C PHASE.45 TO GROU ND. CONTACTED PAYTON NOTTINGHAM ON 2/3/86 AND E IECRPED E THAT 0229 02/07/86 01-EP -EP -1C 030200 PEETRATION FAIL TO HOLD REQUI TIGHTEN COP 0ECTIONS AND SHOFPED LET SIT Fm A CEFLE (F MUtS F1tESSLRE RED PRESSURE FOR TIME LIMIT SPEct-" W RESIU f G EVERYTHIts SAT.

FIEo 0229 02/07/96 01-EPC-

-D12 030168 BAD READING READ RPI PRIMARY 40.s8t SECONDARY 56.3, SEARCH COILS 11 3R CH.

0229 02/07/86 01-EFC-

-F-12 030170 BAD READING READ RPI PRIl%RY 41 5 SEL M Y 58.2R, SENtCH COIL 14.8R CH.

0229 02/07/86 01-EPC-

-H10 030169 BAD READING READ RPI PRIMARY 40.9 SECON!WtY 53 3 SEARCH COIL 38.7 2/2/86 0229 02/07/86 01-EPL-REL -MG2 030216 PERFORM Fit 0CEDLRE 1-DP-P-RT-4 PERF(RPED PROCOURE 1-EtF-P-RT-44 SATISFACTORILY.

0229 02/07/86 01-FP -PS

-1 030118 LOSS OF P0bER TO PAEL CHANGE GA P0lER SlFPLY. SY17325 TEST 3AT AE PER PT 24.18 0229 02/07/86 01-RC -PCV -1455C 030273 ADJUST LIMIT SWITC E S ADJUSTED LIMITS A6 ECESSARY 0229 02/07/86 01-RC -TI -412 030462 IPPLEENT EWt 86H)50 VOID WORKED LMDER 3800030419.

0229 02/07/86 01-SS -TV -100A 026532 ESK6CD LEAK 100AC3 LIFTED BEHINOCLEARED JA9ER AND HAD TO ADJJST No. 1 VENT. 80.

026652' i

o

-w

.w

-..m I

(

._m i

M_

VIMOINIA EI.ECTRIC AND POWEN COM1*ANY Ricuwonn,VtwoixtA 28t261 i

W. L. S1rmwant vic 1......"'

March 14 1986 Nt ca..A. Or.. arson.

8 4

i e

5 Mr. Maurice R. Beebe Serial No.86-151 Office of Resource Management N0/JDH:acm U.S. Nuclear Regulatory Commission Docket Nos. 50-280 j

Washington, D. C. 20555 50-281 License Nos. DPR-32 DPR-37 i

Dear Mr. Beebe:

i VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 MONTHLY OPERATING REPORT l

Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. I and 2 for the month of February,1986.

Very truly yours,

\\ DR

\\.

\\'

W. L. Stewart i

Enclosure (3 copies) cc:

Mr. James M. Taylor, Director (12 copies)

Office of Inspection and Enforcement i

l Dr. J. Nelson Grace (1 copy)

Regional Administrator Region II Mr. Donald J. Burke (1 copy)

NRC Resident Inspector Surry Power Station 1

I Q

/

\\

l