ML20210Q090

From kanterella
Jump to navigation Jump to search
Initial NSHC Determination & Noticing Action Re Util 860424 Application for Amend to License DPR-72 Re Plant Operation W/Redesigned Reactor Coolant Pump Supports.Amend Involves NSHC
ML20210Q090
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/01/1986
From: Scinto, Silver H, Stolz J
NRC, NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To:
Shared Package
ML20210Q042 List:
References
NUDOCS 8605130608
Download: ML20210Q090 (2)


Text

. _ _ _

DLOP 228. Rev. 1 INITIAt.

NO SIGNIFICANT HAZARDS. CONSIC]_ATION DETERMINATION AND NOTICliiG ACTION Crystal River Unit No. 3 Docket lio. 50-302 Facility:

Nuclear Generating Plant Licensee: Florida Power Corporation Date of application: April 24,1986 Request for:

Plant operation with reactor coolant pump supports redesigned in accordance with the recently noticed amendment to GDC-4.

(See attached notice or press release for more details.)

Initial Detemination:

4

( X) Prooosed detemination - amendment request involves no significant hazards considerations (NSHC).

4

(

) Final detemination - amendment request. involves significant hazards considerations (SHC).

Basis for Detemination

(

)' Licensee's HSHC discussion has been reviewed and is accepted.

_ amendment request.

See attached (X ) Basis for this detemination is presented in the attached notice.

'(

) Other (state):

vW I

e>

t

{

q et j

I (Attach additional sheets as needed.)

Initial Hoticing Action:

(Attach appropriate notice or input for monthly FRN) i 1.

(

) Monthly FRM.

Notice of opportunity for hearing (30 days) and request.

for comments on proposed NSHC detennination - monthly FRN input is attached (Attachment 8).

2.

(

) Individual FRN (30 days).

Same notice matter as above. Time does not allow waiting for next monthly FRN (Attachments 9a and 9b).

(THIS FORM SHOULD BE TYPED EXCEPT FOR UNUSUAL, URGENT CIRCUMSTANC 8605130608 860502 PDR ADOCK 05000302 P

PDR g

O

Attachm:nt 4 page 2

.Js OLOP 228. Rev.1 3.

(

) local media notice.

Valid exigent circumstances exist (evaluated below).

Local media notice requesting public comments on proposed NSHC determination is attached (Attachment 10).

4.

(

) No notice.

A valid energency situation exists (evaluated below) and there is no time for public notice on proposed NSHC determination.

j (No attachment.)

5.

(

) Individual FRN (30-daysl. Licensee's claim of exigent or emergency I

circumstances is invalid (evaluated below).

Notice of opportunity for

~

hearing (30 days) and request for comments on proposed NSHC detemina-tion is attached (Attachments 9a and 96).

Letter of explanation to licensee is also attached.

6.

(

) Individual FRN (30-davsl.

The amendment request involves SHC. Notice l

of opportunity for prior hearing is attached (Attachment 5). Letter to licensee also attached.

t 7.

()( ) Individual Short FRN. Valid emergency circumstances exist (evaluated

[

below).

There is no time for the usual 30-day FRN.

(Attachment 16).

j Evaluatio'n-of exigent or emergency circumstances (if applicable):

e i

Until publication of the amended GDC-4 role in the FR on 4/11/86, licensee had requested exemption to the existing GDC-4 on February 1,1985.

The new rule supplementory information requires a license amendment.

Amendment request submitted 4/24/86.

During replacement of the RCP pump shafts, licensee has replaced RCP supports with the redesigned supports.

Approved supports required by Mode 4 during restart, currently expected j

5/30/86. Normal notice period will delay restart.

Acorovals:

Date 1.

Harley Silver f.

S/[/86 2.

John F. Stolz 5///86 (Director) j jr/

3.

S 9ch tD (3(Tit 2001/tJdEL [///fk (GELD)

Additional acoroval (for noticing actions types 3, 4.- 5, 6 and 7):

4.

(Assistant Director)

Additional aoproval (for noticing action types 4 and 5):

5.

(Director. Division of Licensing)

Attachment:

as indicated Original - Docket File (with note " Docket File only")

cc:

Project Manager Licensing Assistant Branch Files 4

m.

m

.