Forwards Proprietary Ofc of Investigations Rept Case 1-85-019, Peach Bottom Atomic Power Station:Alleged Threats to Employees to Prevent Disclosure to NRC, Per 860530 Enforcement Conference.Rept Withheld (Ref 10CFR2.790)
ML20210P985
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/22/1986
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19292G733 List:
References
NUDOCS 8702170063
Download: ML20210P985 (3)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ __

Docket Nos. 50-277 2 SEP 1966 50-278 Philadelphia Electric Company ATTN: Mr. S. L. Daltroff Vice President Electric Production 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:

Subject:

Investigation No. 50-278/1-85-019 Enclosed is a Report of Investigation concerning alleged threats to employees to prevent disclosure of possible overexposure information to the NRC. The investigation sought to determine if the employment of a Bartlett Nuclear Inc.

(BNI), contract Senior Health Physicist (HP) was terminated at the Peach Bottom Atomic Power Station (PBAPS) as a result of his engaging in a protected acti-vity. A second objective of this investigation was to determine if the BNI HP was " blackballed" following his termination from PBAPS when he attempted to gain employment at another nuclear facility. The investigation disclosed that the BNI HP did have legitimate concerns stemming from an incident which took place in the PBAPS, Unit 3, recombiner offgas tunnel on March 1, 1985. A summary of the investigation was provided to you by letter dated May 20, 1986 and an enforcement conference was held with your staff on May 30, 1986. At the timo of this enforcement conference there was a question of whether or not you had all the facts needed to fully respond to the safety concerns of the NRC.

Accordingly, the investigative report and its exhibits are being provided at this time.

When you have reviewed the attached report and are prepared to discuss its findings please contact us for the purpose of scheduling a second enforcement conference.

In accordance with 10CFR ?. 790(a), a copy of this letter and the enclosure will be placed in the NRC Public Document Room unless you notify this office by telephone, within ten days of the date of this letter and submit written application to withhold information contained therein within thirty days of the date of this letter. Such application must be consistent with the requirements of 2.790(b)(1). The telephone notification of your intent to request withholding, or any request for an extension of the 10 day period which you believe necessary, should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5223.

8702170063 861022 PDR ADOCK 05000277 o PDR OFFICIAL RECORD COPY INV PB - 0001.0.0 09/17/86 -

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ . _ _ _ _ . J

Philadelphia Electric Co. 2 cc:

R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station John S. Kemper, Vice President, Engineering and Research{w(titDI M Troy B. Conner, Jr. , Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electri(W(ruovr-G. Leitch, Superintendent Nuclear Generation Division Eugene J. Bradley, Esquire, ssistant General Counsel (Without Report)  %

Raymond L. Hovis, Esquire w rt}tcxyr R6A46 .

Thomas Magette, Power Plant W. M. Alden, Engineer in Charge, iting,NuclearEvaluations(WithoutRep}

Licensing Section (dpT /4/betr ort)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania bcc w/eftet---

Region tdf Ro$ (MA)CL-I Docket L om with concurrences)

Management Assistant Section Chief, DRP Robert J. Bores, DRSS C. White, OI T. Murley T. Martin R. Gallo P. Eselgroth l

a s ,_ w _I: . ,

~

RI:RP

.a RI:DRS m.

9////86 9/{}/86 9/\'\/86 p911/86 9/ /86 0FFICIAL RECORD COPY INV PB - 0002.0.0 09/17/86

Philadelphia Electric Co. 2 2 SEP 1986 Your cooperation with us in this matter is appreciated.

Sincerely, Siame4 BTI William F. Kane, Director Division of Reactor Projects Attachments: As stated cc:

R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station John S. Kemper, Vice President, Engineering and Research (Without Report)

Troy B. Conner, Jr. , Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric (Without Report)

G. Leitch, Superintendent Nuclear Generation Division Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

W. M. Alden, Engineer in Charge, Licensing Section (Without Report)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania bcc w/out enc 1.

Region I Docket Room (with concurrences)

Managetant Assistant Section Chief, DRP

( Robert J. Bores, DRSS l C. White, OI i T. Murley l T. Martin l R. Gallo j P. Eselgroth SEE: PRB-woos conconssec=5 a g/a RI:DRP RI:DRS RI:0I RI y:RC h R Eselgroth/emw Gallo White Gutierrez K a 9/ /86 9/ /86 9/ /86 9/ /86 9/11 /86

0FFICIAL RECORD COPY INV PB - 0001.1.0 l 09/17/86 i

. - -