ML20210P441

From kanterella
Jump to navigation Jump to search
Forwards Revs to Fundamental Nuclear Matl Control Plan.Revs Withheld (Ref 10CFR2.790)
ML20210P441
Person / Time
Site: 07001113
Issue date: 04/01/1986
From: Winslow T
GENERAL ELECTRIC CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
26772, NUDOCS 8605130384
Download: ML20210P441 (1)


Text

C' 'f i*7

- ^, h* t' JENERAL $ ELECTRIC l

a j,.-

g s.

NUCLEAR FUEL MANUFACTdRING DEPA' MlNT

[d-g GENERAL ELECTRIC COMPANY - P. C. BOX 780 - WILMINGTON, NORTH CAROLINA 28402 April 1, 1986' b'\\. h RECByg f

Dr. J. Nelson Grace, Regional Director

' '3 '?

r7 g ) j U.

S. Nuclear Regulatory Commission, RII 0.s,7 met m g.

O s

P. O. Box 2203 CCw c m Atlanta, Georgia 30301 N

i b

I

Dear Dr. Grace:

t-('r

)

Reference:

NRC License SNM-1097, Docket #70-1113 j

Subject:

FUNDAMENTAL NUCLEAR MATERIAL CONTROL PLAN REVISIONS General Electric Company hereby submits revisions (dated 4/01/86) to the Fundamental Nuclear Material Control Plan (FNMCP) for the fuel fabrication facility in Wilmington, North Carolina. contains a descriptive listing of the changes made which do not require NRC approval prior to implementation, and contains the revised pages.

Icarsuant to 10 CFR 2.790(d), General Electric requests this information be withheld from public disclosure as this material identifies General Electric procedures for safeguarding licensed special nuclear material.

General Electric personnel would be pleased to discuss this matter further with you and your staff as you may deem necessary.

Very truly yours, GENERAL ELECTRIC COMPANY M

11 e

i T. Preston Winslow, Manager Licensing & Nuclear Materials Management M/C J88 TPW:bsd Attachments T

t cc:

Director, GNMSS S

pO 6*

b SGD-L ICCKng

{

us,y.?;

S i

8605130384 860401

=

s.m c.NO.5 h

M'y PDR ADOCK 07001113 N*m C

PDR

' #WM7 q;, %ia::tt

\\/

]&77)

,,