APPENDIX B NOTICE OF DEVIATION Boston Edison Company Docket No. 50-293 Pilgrim Nuclear Power Station License No. DPR-35 As a result of the inspection conducted on July 8, 1986 - August 4, 1986 and in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C), the following deviation was identified:
The licensee committed in a letter to the NRC, dated March 1, 1977, to conduct fire brigade training in accordance with item B.6.e.2 of NRC Branch Technical Position APCSB 9.5-1, Revision 1.
Item B.6.e.2 states that training can only be accomplished by conducting drills several times a year (at least quarterly) so that all members of the fire brigade have had the chance to train as a team, testing itself in the major areas of the plant.
Contrary to the above, as of August 4,1986 all members of the fire brigade team had not participated in brigade drills. During calendar year 1985 thirty of sixty-nine team members did not participate in any drill.
Fourteen team members had not participated in a drill during the nineteen month period preceding July 31, 1986.
Boston Edison Company is not required to submit a written statement or explanation in reply, provided that the response solicited in inspection report 86-21 includes; (1) the corrective steps which you have taken and the results achieved; (2) corrective steps which will be taken to avoid further deviation; and (3) the date when corrective actions will be complete.
4 8610060762 860925 PDR ADCCK 05000293 G
PDR1 0FFICIAL RECORD COPY IR PILGRIM 86 0005.0.0 09/08/86 I