MAY 21B6
'Decket No. 50-440
. DISTRIBUTION L
<, Docket J u e; BGrimes NRC POR M0'Brien Local 1PDR JStefano Mr. Murrhry R. Edelman PD#4 Reading ACRS(10)
Vice President - Nuclear Group RBernero HSmith Th( Cleveland Electric Illuminating Company '
Woodhead,0 ELD SScott P.O. Box 5000 JPartlow Cleveland, Ohio 44101 EJordan
Dear Mr. Edelman:
The Comptroller General in a Report'ta the Congress dated September'19, 1984, stated "NRC needs better management controls to ensure implementation of ger.eric, issue solutions." To correct.this situation, the Nuclear Regulatory Commission is working on a long-term' program which will improve its documentation on the status of power reactor licensees' implementation of approved regulatory improveinents.
To assist me in developing this information for the Perry Nuclear Power Plant, please review the enclosed plant-specific list, add omitted significant actions to the list, and provide the date that all aspects of each identified requirement were completed / implemented or are expected to be completed. For each requirement 1
that has been completed, enter " completed" under the Status column and the date
'thR item was completed.
For requirements that have not been completed / implemented, prov*de the projected date and enter " projected" under the Status column.
I do not expect or want a major effort made-to obtain precise dates. Rather, I will accept-readily 4nown or best-estimate dates for 6ctions that have been completely implemented. for example, the ye4r only would be acceptable for completions prior to 1984; the month as well as year is needed for requirements completed after that time. For projected completions /!mplementations in 1986,.use month and year. Use year only for projections thereaftec. Please provide a response in the format enclosed by May 31, 1986. Should there be any questions or clari-fication needed, please have your staff set in touch with me. 'Tne need for this information request has been discussed with your' staff.
4 In the future, NRR will need 'estfriated dates prior to issu'ance of the safety i
evaluation reports so that the estimated schedule may be -included in safety evaluation reports and supplements thereto.-
i This request is covered by 0MB Clearance Number 3150-0011, which expires !
September 30, 1985.
Si ncerely,~
Original sigMd %
8605130144 860502 PDR A')DCK 05000440,
John J.-Stefano, Project Manager PDR A
f_
Division of.BWR Licensing BWR Project Directorate No. 4 ^
Enclosure:
" As stated ct:< See next page
'4/PM PD#4/D
/
/
JStefano:lb WButler (G05/02/36 05/p8'6
, du 4 5
((%>ua s
o UNITED STATES g
g NUCLEAR REGULATORY COMMISSION 5
E WASHINGTON, D. C. 20555
\\ **"* /
MAY 21986 Docket No. 50-440 Mr. Murrary R. Edelman Vice President - Nuclear Group The Cleveland Electric Illuminating Company P.O. Box 5000 Cleveland, Ohio 44101
Dear Mr. Edelman:
The Comptroller General in a Report to the Congress dated September 19, 1984, stated "NPC needs better management controls to ensure implementation of generic issue solutions." To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation on the status of power reactor licensees' implementation of approved regulatory improvements.
To assist me in developing this information for the Perry Nuclear Power Plant, please review the enclosed plant-specific list, add omitted significant actions to the list, and provide the date that all aspects of each identified requirement were completed / implemented or are expected to be completed. For each requirement that has been completed, enter " completed" under the Status column and the date the item was completed.
For requirements that have not been completed / implemented, provide the projected date and enter " projected" under the Status column.
I do not expect or want a major effort made to obtain precise dates. Rather, I will accept readily-known or best-estimate dates for actions that have been completely implemented. For example, the year only would be acceptable for completions prior to 1984; the month as well as year is needed for requirements completed after that time. For projected completions / implementations in 1986, use month and year. Use year only for projections thereafter. Please provide a response in the format enclosed by May 31, 1986. Should there be any questions or clari-fication needed, please have your staff get in touch with me. The need for this information request has been discussed with your staff.
In the future, NRR will need estimated dates prior to issuance of the safety evaluation reports so that the estimated schedule may be included in safety evaluation reports and supplements thereto.
This request is covered by OMB Clearance Number 3150-0011, which expires September 30, 1986.
Sincerely, y
e
.- w(
LL'"
John J. Stefano, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing
Enclosure:
As stated cc: See next page
-e,
F Mr. Murray R. Edelman Perry Nuclear Power Plant The Cleveland Electric Units 1 and ?
Illuminating Company cc:
Jay Silberg, Esq.
Mr. Larry O. Beck Shaw, Pittman, A Trowbridge The Cleveland Electric 1800 M Street, M. W.
Illuminating Company Washington, D. C.
20006 P. O. Box 97 E-210 Perry, Ohio 44081 Donald H. Hauser, Esq.
The Cleveland Electric Mr. James W. Harris, Director Illuminating Company Division of Power Generation P. O. Box 5000 Ohio Department of Industrial Cleveland, Ohio 44101 Relations 2323 West 5th Avenue Resident Inspector's Office Post Office Box 825 U. S. Nuclear Regulatory Commission Columbus, Ohio 43216 Parmly at Center Road Perry, Ohio 44081 Regional Administrator, Region III il. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Donald T. Ezzone, Esq.
Assistant Prosecuting Attorney 105 Main Street Lake County Administration Centet Painesville, Ohio 44077 Ms. Sue Hiatt OCRE Interim Reoresentative 8275 Munson Mentor, Ohio 44060 Terry J. Lodge, Esq.
618 N. Michigan Street Suite 105 Toledo, Ohio 43624 John G. Cardinal, Esq.
Prosecuting Attorney Ashtabula County Courthouse Jefferson, Ohio 44047
Enclosure Action Action Item Completed Implemented Reference / Status 1.
Separately itemize applicable sections of NRC Generic Letters by Generic Letter No. and Section (e.g. GL 83-28, Section 1.1, 1.2, 2.1, 2.2; GL 82-33, etc.)
L 2.
All applicable TMI Action Plan Items listed in the Perry SER and SER Supplements.
3.
LRG-II related BWR/6 multi-plant generic issue items (cross reference with TMI Action Plan Items, etc. as appropriate.
4.
The following Multi-Plant Activity Items 'MPA #) some of which may be cove;ed under 1 thru 3 above:
A-01, Inservice Testing Program A-02, 10CFR50, Appendix I A-1A, 10CFR50.55g, ISI A-17, Instru. to follow course of accidents
- A-18, TS affected by 10CFR50.72 and 50.73
- A-20, Implementation of ATWS Rule "B-17, TS Surveillance for Hydraulic Snubbers "B-22, TS Surveiilence for Mechanical Snubbers
- B-24, Venting anc Purging at Full Power
- B-59, Masonry Wall Design B-77, 2.1 Equip. '; lass / Vendor Interface-RTS B-78,3.1.1/.2 Post Maint. Test Proced.
B-79, 3.1.3 Post Maint.-TS-RTS B-80, 4.1 RTS Reliability-Vendor Mods.
l B-81,4.2.1/.2 Preventative Maint.-TS
- B-83, 0737TS (GL 83-36/-37)
B-84, Insp. of BWR Stainless Steel Pipe "B-85, 1.2 Post Trip Review-Info Capability l
B-86, 2.2 Equip. Class / Vendor Interface
- B-87,3.2.1/.2 Post Maint. Test Proced.
- B-88, 3.2.3 Post Maint. Test Proced/TS B-89,4.2.3/.4 Maint. Reactor Trip Breakers
- B-92, 4.5.1 RTS Functional Testing B-93,4.5.2/.3 RTS Funct. Test-Alternatives C-07, Fuel Handling Accident in Containment
& *E-04, BWR Single Loop Operation
'F-4a, Revised E0P Tech Guidelines F-5, Proced. Generation Packages
'F-8, TMI I.D.1 (DCRDR)
'F-14, TMI II.D.1.2 RV/SV Tests
'F-19, TMI II.E.4.2 (all sections)
- F-26, Instru. for Detection of ICC j
'F-55, TMI II.K.3.28
- F-57, TMI II.K.3.30
- F-58, TMI II.K.3.31
- F-68, TMI III.A.2.2 l
- F-71, (same as F-8) i l-6 6