Requests Markup by 860531 of Encl Draft plant-specific List, Including Omitted Significant Actions & Info on Generic Actions Not Yet Implemented,To Assist NRC in Developing long-term Generic Issues Solution Program
ML20210P226
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/02/1986
From: Stern S
Office of Nuclear Reactor Regulation
To: William Cahill
GULF STATES UTILITIES CO.
References
TASK-***, TASK-TM NUDOCS 8605130131
Download: ML20210P226 (5)


Text

- -..

?

-MAY 2 1996-Docket No. 50-458 SStern

~"

NRC'P ACRS-(10)

Mr. William J. Cahill, Jr.

Local PDR Dewey,0 ELD 1'

Senior Vice President PD#4 Reading HSmith j

l River Bend Nuclear Group RBernero SScott i

Gulf States Utilities Company JPartlow JJaudon,Rgn IV i

P.O. Box 2951 EJordan Beaumont, Texas 77704 BGrimes l

ATTN: Mr. J. E. Booker M0'Brien I

Dear Mr. Cahill:

The Comptroller General in a Report to the Congress dated September 19, 1984,

.i -

stated "NRC needs better management controls to ensure implementation of generic issue solutions." To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation c

on the status of power reactor licensees' implementation of approved regulatory i

improvements.

s To assist the staff in developing this information for River Bend Station, j

please review the enclosed " rough cut" plant-specific list of NRC approved multiplant actions. Please add omitted significant actions to the list and c

provide the status information as identified in the enclosure.

Since the list of NRC approved multiplant issues reflects many issues which l

were incorporated into the licensing review of River Bend Station, please provide information, at this time, on those generic actions which either' have yet to be implemented, are conditions 01 the River Bend license, or are

~

identified in the River Bend SER for implementation. Please provide a response j

in the form of a marked up listing by May 31, 1986.

In the future, the staff expects to incorporate estimated implementation schedules in SERs.

This request is covered by OMB Clearance Number 3150-0011, which expires September 30, 1986.

l We appreciate your cooperation with us in this matter.

Sincerely, i

i 8605130131 860502

'riginal signed by i

PDR ADOCK 05000458 l

P PDR Stephen M. Stern, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

l As stated j

t cc:

5qe next page PDF /P PD#4/D SSI jlb WButler ]\\)

05/ /86 05/g/85

o UNITED STATES

~,,

[

g NUCLEAR REGULATORY COMMISSION O

j WASHINGTON, D. C. 20555

\\...../

=

m Docket No. 50-458 Mr. William J. Cahill, Jr.

Senior Vice President River Bend Nuclear Group Gulf States Utilities Company P.O. Box 2951 Beaumont, Texas 77704 ATTN: Mr. J. E. Booker

Dear Mr. Cahill:

The Comptroller General in a Report to the Congress dated September 19, 1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions." To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation on the status of power reactor licensees' implementation of approved regulatory improvements.

1 To assist the staff in developing this information for River Bend Station, please review the enclosed " rough cut" plant-specific list of NRC approved multiplant actions. Please add omitted significant actions to the list and provide the status information as identified in the enclosure.

Since the list of NRC approved multiplant issues reflects many issues which were incorporated into the licensing review of River Bend Station, please provide information, at this time, on those generic actions which either have yet to be implemented, are conditions of the River Bend license, or are identified in the River Bend SER for implementation. Please provide a response in the form of a marked up listing by May 31, 1986, t

In the future, the staff expects to incorporate estimated implementation schedules in SERs.

This request is covered by OMB Clearance Number 3150-0011, which expires September 30, 1986.

We appreciate your cooperation with us in this matter.

Sincere M

Mr

'S ph n M. S ern, roject Manager BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated cc: See next page

Mr. William J. Cahill, Jr.

Gulf States Utilities Company River Bend Nuclear Plant cc: ~

Troy B. Conner, Jr., Esq.

Ms. Linda B. Watkins/Mr. Steven Irving Conner and Wetterhahn Attorney at Law 1747 Pennsylvania Avenue, NW 355 Napoleon Street Washington, D.C.

20006 Baton Rouge, Louisiana 70802 Mr. William J. Reed, Jr.

Mr. David Zaloudek Director - Nuclear Licensing Nuclear Energy Division Gulf States Utilities Company Louisiana Department of P. O. Box 2951 Environmental Quality Beaumont, Texas 77704 P. O. Box 14690 Baton Rouge, Louisiana 70898 Richard M. Troy, Jr., Esq.

Assistant Attorney General in Charge Mr. J. David McNeill, III State of Louisiana Department of Justice William G. Davis, Esq.

234 Loyola Avenue Department of Justice New Orleans, Louisiana 70112 Attorney General's Office 7434 Perkins Road Resident Inspector Baton Rouge, Louisiana 70808 P. O. Box 1051 St. Francisville, Louisiana 70775 H. Anne Plettinger 3456 Villa Rose Drive Gretchen R. Rothschild Baton Rouge, Louisiana 70806 Louisianians for Safe Energy Inc.

1659 Glenmore Avenue Baton Rouge, Louisiana 70775 Regional Administrator, Region IV U.S. Nuclear Regulatorv Commission Office of Executive i.ector for Operations l

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 9

e

Enclosure Definitions

" TAC No." - Internal NRC identifier used for resource tracking "MPA No." - Multiplant action number (NRC number)

"LIC ACT COMPLETE" - date staff approved your proposed implemention of the generic action. Use date (e.g., month / year) of SER or letter date providing written approval

" STATUS" - use " complete" if implementation of the generic action is now complete; otherwise " projected" for future implementation dates

" COMPLETION DATE" - use month / year for actual or projected implementation.

~

9 e

5 mm

.[ y PageNo.

1 03/02/86 FACILITY IMPLEMENTAT!DN RIVER BEND STAT!DN PROJECT MANAGER - STEPHEN STERN e

TAC NO. MFA 8 TITLE LIC ACT COMPLETION COMPLETION COMPLETE STATUS DATE Eypassed & Int;erable Status Indicatica

// Projected 04/30/97-Er;*. Expertise en Shift

// Frojected 04/30/97 Fire Prctectica Tech Specs.

//

/ /

TDI Diesel Engines

//

//

Naphreys Ccncerns (Mark !!! issues)

//

/ /

Hydrogen Centrol-De;raded Cere

// Projected 04/30/87 A-01 Inservice Inspection Progras

// Projected

/ /

A-14 Itservice Test Frogras

// Projected 08/29/87 A-17 Irplementation cf Reg. Guide 1.97

// Frejected 04/30/6' A-20 laplesentatica cf ATW3 Rule

//

/ /

E-43 Adequacy cf Statica Elect Distrib Velt

/ / Projected

/ /

E61029 E-76 ATW3 1.1-Fost Trip Review

//

//

M6103! E-77 ATW5 2.!-Equipaent Classif & Vender IF

/ /

//

n61031 2-78 ATW3 3.1.1 & 3.1.2 Pest Maint Testing

//

//

Kb10!2 1-26 ATWS 2.2 -S-R Coe;cnents

//

//

H51064 E-87 ATWS 3.2.113.2.2 S-R Ccaponents

//

//

M61034 B-E9 ATWS 3.2.3 - Tech Spec-S-P. Ecepenents

//

//

M61065 B-92 ATW3 4.5.1 Reacter Trip Sys Reliatility

//

//

K61035 E-93 ATW5 4.5.214.5.3 Test Alternatives

//

/ /

F-B Centrol Roca tesign Review

//

//

F-Ba ECRD (HEDs)

// Projected

//

F-9 Safety Paraseter Display Systes

//

//

DBil 9

m