Amended Rept Cover Page for Form NIS-1 & Amended Form NIS-2 Rept Pages Which Include Info Re RHR Sys Head Spray Line ModML20210P215 |
Person / Time |
---|
Site: |
Brunswick |
---|
Issue date: |
02/12/1997 |
---|
From: |
CAROLINA POWER & LIGHT CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20210P211 |
List: |
---|
References |
---|
NUDOCS 9708270007 |
Download: ML20210P215 (5) |
|
|
---|
Category:PRESERVICE & INSERVICE INSPECTION & TEST REPTS
MONTHYEARML20210P2151997-02-12012 February 1997 Amended Rept Cover Page for Form NIS-1 & Amended Form NIS-2 Rept Pages Which Include Info Re RHR Sys Head Spray Line Mod ML20113A9771996-05-29029 May 1996 Rev 0 to Form NIS-1, Owner'S Data Rept for ISI for 940820- 960312 ML20117H3151996-05-0808 May 1996 Form NIS-2 Owner Rept for Repair or Replacements ML20087K4341995-07-27027 July 1995 Rev 0 to Rept of 1994-1995 ISI at Brunswick Steam Electric Plant Unit 1 ML20070N8201994-04-28028 April 1994 Rept of 1991-1994 ISI at Brunswick Steam Electric Plant Unit 1, Rev 0 ML20090L3631992-03-12012 March 1992 Rept of 1991/92 Inservice Insp at Brunswick Steam Electric Plant Unit 2,Rev 0 ML20081F3271991-04-29029 April 1991 Rev 0 to Rept of 1990/91 Inservice Insp at Brunswick Steam Electric Plant Unit 1 ML20055C8231990-05-16016 May 1990 Rept of 1989/90 Inservice Insp at Brunswick Steam Electric Plant Unit 2 ML20245L3361989-05-28028 May 1989 Rev 0 to Rept of 1988/89 Inservice Insp at Brunswick Steam Electric Plant Unit 1 ML20151C7531988-06-30030 June 1988 Rept of 1988 Inservice Insp at Brunswick Steam Electric Plant 2 ML20237F8951987-07-0808 July 1987 Results of Inservice Insp on 870213-0613.Insp Conducted Per Requirements of ASME Boiler & Pressure Vessel Code,Section Xi,Article IWA-6220(b) ML20206R9101986-08-29029 August 1986 Rev 0 to Rept of 1986 Inservice Insp ML20153E6381986-01-27027 January 1986 Rev 0 to Rept of 1985 Inservice Insp at Brunswick Steam Electric Plant Unit 1 ML19257D7211980-01-30030 January 1980 Revised Inservice Insp Program for Piping & Welds for Hydrostatic Test Program 1997-02-12
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N3271999-10-21021 October 1999 Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20210M8581999-05-14014 May 1999 B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With ML20206N1791999-04-23023 April 1999 Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20206N1831999-02-28028 February 1999 Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14 BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0210, Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired1998-10-30030 October 1998 Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151Y6211998-09-14014 September 1998 BSEP Rept Describing Changes,Tests & Experiments, for Bsep,Units 1 & 2 ML20151Y6371998-09-14014 September 1998 Changes to QA Program, for Bsep,Units 1 & 2 BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151T5021998-08-0505 August 1998 Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2 BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 ML20236T1961998-07-0101 July 1998 Rev 1 to 2B21-0088, Brunswick Unit 2,Cycle 13 Colr ML20236T1921998-07-0101 July 1998 Rev 1 to 1B21-0537, Brunswick Unit 1,Cycle 12 Colr BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20236T1971998-06-30030 June 1998 Rev 2 to 24A5412, Supplemental Reload Licensing Rept for Brunswick Steam Electric Plant Unit 2 Reload 12 Cycle 13 ML20249B9691998-06-11011 June 1998 Rev 1 to VC44.F02, Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,Nrc Bulletin 96-003 Final Rept BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 ML20247N7501998-04-30030 April 1998 Rev 0 to BSEP Unit 1,Cycle 12 Colr ML20247N7721998-04-30030 April 1998 Rev 0 to J1103244SRLR, Supplemental Reload Licensing Rept for BSEP Unit 1,Reload 11,Cycle 12 ML20217K8461998-04-24024 April 1998 Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 ML20217K3941998-04-24024 April 1998 SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2 ML20217E6841998-04-23023 April 1998 Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD Housings ML20217E7471998-04-21021 April 1998 Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential Welds ML20217B5241998-04-20020 April 1998 SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii) BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 ML20216B1041998-03-0404 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1 1999-09-30
[Table view] |
Text
.- -.v-
, ENCLOSURE 1 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO.1
~
q DOCKET NO. 50-325/ LICENSE NO; DPR-71 -- -1 UPDATE TO FORM NIS 1 AND FORM NIS-2 OWNER'S REPORTS =
AMENDED FORM NIS-1 1 AND FORM NIS-2 PAGES
'.i t
9708270007 970821 -
PDR ADOCK 05000325' G PDR1 4 p- *-
. .~
CAROLINA POWER AND LIGilT COMPANY, POB 1551, RALEIGil, NC 27602 I BRUNSWICK STEAM ELECTRIC PLANT, POB 10429, SOUTIIPORT, NC 28461 ;
UNIT 1, COMMERCIAL SERVICE DATE 03/1707, NB#3901(RPV) l REPORT OF TIIE 1994 TIIROUGII 1995 INSERVICE INSPECTION AT BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 SOUTIIPORT, NORTII CAROLINA 28461-0429 CAROLINA POWER AND LIGIIT COMPANY l RALEIGII, NCRTII CAROLINA COMMERCIAL SERVICE DATE: 3/17/77 REVISION 1 1
4 Prepared By: bMb Date 7/Wf7 l/ / /
Approved By: 4 Iw _ Date 2-/7'77 8 9 j
. ~m CAROLINA POWER AND LIGIIT COMPANY, POB 1551, RALEIGII, NC 27602 BRUNSWICK STEAM ELECTRIC PLANT, POB 10429, SOUTIIPORT, NC 28461 UNIT 1, COMMERCIAL SERVICE DATE 03/17/77, NB#3901(RPV) 10.0 Wit 2 FORMS LitYlWG - 1 theet each Work Request / Job Order No. Work Request / Job Order No.
94 ALGS1 & 94 ALGS2 (Fitting) 95 ADHR1 (Snubbers) 93 BACI1 (Support) 94 APYA1 (Snubber) 94 AJ K1 (Snubber) 94 APWJ1 (Snubber) 94 ANTR 1 (Fitting) 94 APXU1 (Snubber)
ANYT001 (Valve) 94 APWA1 (Snubber) 94 A%TS1 (Fitting) 94 APWF1 (Snubber) 94 AHTT1 (Fitting) 94 APXT1 (SrnJbber) 93 ASGQ1 (Snubber) 94 APWP1 (Snubber) 94 AKKL1 (Fitting) 94 APXP1 (Snubber) 93 BBDX1 (Snubber) 94*APXN1 (Snubber) 94 ANTC1 (Valve) 94 APWT1 (Srnabber) 94 AECR1 (Valve) 94 APYJ1 (Snubber) 94 AGDN1 (Fitting & Screws) 95 ADJC1 (Snubber) 94 AJFN1 (Fitting & Screws) 95 ACTW1 (Fitting) 94 AECS1 (Fitting & Screws) AJN2001 (Fitting) 94 AECT1 (Fitting & Screws) 93 ASGP1 (Snubber) 94 AECU1 (Fitting & Screws) 94-APXW1 (StuJbber) 94 AECW1 (Fitting & Screws) 94 APDE2 (Fitting) R1 94 AECX1 (Fitting & Screws) 94 AECY1 (Fitting & Screws) 94 AEMP1 (Fitting & Screws) 94 AEMQ1 (Fitting & Screws) 94 AEMR1 (Fitting & Screws) f4 AEMT1 (Fitting & Screws) 94 AETB1 (Fitting & Screws) 94 AFAZ1 (Fitting & Screws) 94 AFBA1 (Fitting & Screws) 94 AFBB1 (Fitting & Screws) 94 AG0M1 (Fitting & Screws) 94 AJMA1 (Fitting & Screws) 94 AFBC1 (Fitting & Screws) 94 AFLC1 (Fitting & Screws) 94 AGDL1 (Fitting & Screws) 94 AJUG1 (Fitting & Screws) 94 AKQW1 (Fitting & Screws) 94 ACAX1 (Valve) 94 ANZP1 (Fitting & Screws) 94 AQCK1 (Fitting & Screws) 94 AGDL1 (Fitting & Screws) 94-AJUQ1 (Fitting & Screws) 94 AKQW1 (Fitting & Screws) 94-AQDT1 (Fitting & Screws) 95-AAIF1 (Fitting & Screws) 95-ABLG1 (Fitting & Screws) 95 ABL11 (Fitting & Screws) 95 ABLJ1 (Fitting & Screws) 95-ACXK1 (Support) 95-ADLK1 (Snubber) 95 ADMH1 (Snubber) 95 ADHA1 (Bolting)
ANHUOO2 (Studs & nuts) 94-APW11 (Snubber) 94 APXQ1 (Snubber) 93 AQQH1 (Bolting) 93 AQQ11 (Botting) 94-APYG1 (Snubber) 94-APWN1 (Snubber) 94 APYC1 (Snubber) 94-APWG1 (Snubber) 94 AMCRD (Torus Liner)
_ ,__ g _ ,
- 1. CAROLINA POWER & LIGHT COMPANY, P.O. Box 1551 Raloigh, NC 27602
- 2. CRUNSWICK STEAM ELECTRIC PLANT, P.O. Box 10429, Southport, NC 2B4C1
- 3. Unit No. 1
- 4. Owner Certificate of 3/17/77 Authorization: N/A 5 Commercial Date Gh Ga gig
- 6. National Board N/A
- 9. Components 1-E11-F023 FORM NIS.2 OWNER'S REPORT FOR REPAIRS OR REPLACEKINTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner carolina Power 1 Linht c-w Date tant er 27. 1996
,, Name P.O. Rom 1951. Raleinh. Nc. 27602 Sheet i of _ 1 Address
- 2. Plant Brunawlek stans Electrie Plant Unit i Name P.O. Rom 10429. touthnort. kc. 2M61 un/.10 94 APDf2 Address Repair Orgenlantion P.O. No., Job F3., etes
- 3. Work Performed by Mechanical Maintenance Type Code symbol stamp N/A Nane Authoritation No, M/A BREP P.O. Rom 10429. touthoort. Nc. 2M61 Address Expiration Date M/A
- 4. Identification of System Residual Neat Removat
- 5. (a) Applicable Construction Code AtMr til 19 1 Edition, W/A Addenda, M/A Code Case (b) Applicable Edition of Section XI Utilf red for Repairs or Replacements 19 80WB1A
- 6. Identification of components Repaired or Replaced and Replacement Components ASME Code National Repaired, Stamped Name of Name of Manufacturer Board Other Year Replaced, Component (Yes Manufacturer Serial No. No. Identification Built or Replacement or No)
Pipe HUB Inc NA NA PO 6031270K 1983 Replacement No NT # N07998 Pip Cap Dubose National NA NA Po 805117 1995 Replacement No Energy Services MT # ADZ Pipe Cap Dobose National NA NA PO 805117 1995 Replacement No Energy Services ht #GZ4fE2 l
- 7. Description of work Modification of Head torav tine oer EtR 9400305 l
- 8. Tests conducted: Hydrosgtic 0 Pneunatic O Nominal Operatins Pressure E Other LJ Pressure osi Test Tenp. oF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) site is 8% in. x 11 in., (2) Informa-tion in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numered and the nuter of sheets is recorded at the top of this form.
(12/82) This Form (E 00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, N.Y. 10017
g.
e; '
t FORM NIS-2 (Back) 9, Remarks Waae Applicable Manufacturer's Date Reports to be attached CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this mentee===nt conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Syubot Stamp N/A l C:rtificate of Authorization No. M/A Expiration Date M/A signed - pmTR Devetaner Date be M U , 19 %
j OwnerorOwner'sDesignee,Titlp
( CERTIFICATE OF INSERVICE INSPECTION l - .
(
I,-th) undersigned, holding a valid commission issued by the National Board of Boller and Pressure Vessel Inspectors and the St:to or Province of Marth raretina _and esployed by Hartford Steams Rolter Hartford. rennecticut of have inspected the components described in this Owner's Report during the period J//UfV to Ch4/ff , and state that t3 the best of my knowledge and belief, -the owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his enployer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shaLL be Liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with X4W N g et Q ignature Comeissions kbb M W[
National Board, State, Province, and Endorsements D:to k TdNM 19 E df (12/82)
/M _