ML20210N680
| ML20210N680 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/25/1986 |
| From: | Travers W Office of Nuclear Reactor Regulation |
| To: | Standerfer F GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20210N685 | List: |
| References | |
| CON-NRC-TMI-86-096, CON-NRC-TMI-86-96 NUDOCS 8610060613 | |
| Download: ML20210N680 (2) | |
Text
$4:=
L<
DISTRIBUTION h
DN 50-320 Local PDR NRC PDR DCS THI Site r/f TMI HQ r/f September ?_5, 1986 FJMiraglia NRC/TMI 86-096 WDTravers HTMasnik Docket No. 50-320 CJCowgill TAMoslak Mr. F. R. Standerfer LChandler Vice President / Director, Till-2 ACRS GPU Nuclear Corporation I&E P. 0.^ Box 480 M-Town Office
!!iddletown, PA 17057 Service List
Dear Hr. Standerfer:
Subject:
Storage of Upper End Fittings
References:
1.
GPUN letter, 410-86-L-0132, dated August 16, 1986, F. R.
Standerfer to W. D. Travers, " Storage of Upper End Fittings" 2.
GPUN letter, 4410-86-L-0160, dated September 9, 1986, F.
- ~
R. Standerfer to W. D. Travers, "End Fitting Storage" 3.
NRC memorandum, C. R. Harotta, NHSS-TCB, to L. H. Thonus, NRR-THICPD, dated Septenber 18, 1986, regarding c
criticality analyses of 55 gallon drums The Nuclear Regulatory Comission (NRC) staff has completed its review of your August 16, 1986 proposal for storage of upper end fittings and the additional information provided in your September 9,1986 letter (references 1 and 2).
The nethodology and assumptions used in your calculational nodels are conservative.
In addition, the staff has perfermed independent confimatory calculations. Both your results and the staff's results denonstrate that a large shutdown margin exists for both single drums and a large planar array of 55 gallon drums.
+
We therefore approve loading and storage of the array of 55 gallon druas as described in your submittal. This approval is contingent upon submittal of related procedures subject to Technical Specification 6.8.2.
Since the shutdown margin is provided by the soluble boron should limit those activities (i.e. hydrolasing) your operational procedures i
which could introduce non-borated water in the storage area. These procedures should also provide for periodic reverification of the boron concentration if the storage interval is protracted.
c Sincerely, ccGMAI SKMED BY Wi%m D. Trovwes U. D. Travers Director THI-2 Cleanup Project Directorate ames >
8610060613 860925 PDR ADOCK 05000320
.c
'U
- su=== = >
P PDR
..y.
4..
..s.
[
nac ronu sie tio-soi sacu 024o OFFICIAL RECORD COPY
lilaa...
77 7 ~ -
H F
Standerfer 2
September 25, 1986 cc:
T. F. Demitt R. E. Rogan S. Levin J. R. Frew e
J. J. Dyrne 4
A. II. iiiller Service Distribution List (seeattached) 1 L
4 1
43 i,
i J
I g.
4 4
m
"'C'> IMICPD...... IMI
.IM T
" " * > lJ Pr.
ct
.f,,,
H,,
port DAM) 9 g
O F F I C I A.L-. R E C O R, D C O, P Y,-. -.- -
NEC FORM 318 (10 80) NRCM O240
..