Interim Deficiency Rept DER 85-43 Re Lack of Compliance to Util Requirements for Class Q1E Matls.Initially Reported on 851230.Final Rept Delayed Until 860514
ML20210M953
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/11/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-36068, ANPP-36068-EEVB, DER-85-43, NUDOCS 8605020417
Download: ML20210M953 (2)


Text

____ __ -

s Arizona Nuclear Power Project g

P.o. box 52034 e PHOENIX, ARIZONA 85072-2034 gj April 11, 1986 b

n.

ANPP-36068 /EEVBJr/LAS /DRL-92 r11 2

co us e U. S. Nuclear Re8ulatory Commission

~~

h h

3 Region V 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Palo Verde Nuclear Generating Station (PVNGS)

Units 2, 3 Docket Nos. 50/529, 530

Subject:

Time Extension For Report - DER 85-43 A 50.55(e) Potentially Reportable Deficiency Relating to Lack of Compliance to Bechtel/ANPP Requirements For Class Q1E Materials File: 86-006-216; 86-056-026; D.4.33.2

Reference:

(A) Telephone Conversation Between R. C. Sorenson and T. R. Bradish on December 30, 1985 (Initial Reportability, DER 85-43)

(B) ANPP-34803, Dated January 24, 1986 (Interim Report, DER 85-43)

(C) ANPP-35350, Dated February 28, 1986 (Interim Report, Rev. 1, DER 85-43)

Dear Sir:

The NRC was notified of a Potentially Reportable Deficiency in Reference (A), and Interim Reports were issued by Reference (B) and (C). At that time, it was esti-mated that a Final Report would be available by April 14, 1986.

Due to additional questions raised during the last audit of the Brown Boveri facil-ity, the vendor was unable to adequately address all of the concerns.

It is now expected that this information will be finalized by May 14, 1986, at which time a complete report will be submitted.

Very truly yours, G*t a

8605020417 860415 E. E. Van Brunt, Jr.

PDR ADOCK 05000529 Executive Vice President Project Director EEVB/DRL/1df Idf/001/ DER 85-43 cc: See Page Two I

IEM7

DER 85-43, Time Extension Mr. D. F. Kirsch Acting Director ANPP-36068-EEVBJ/LAS/DRL-92.11 April 10, 1986 Pa8e 2 cc:

J. M. Taylor, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 A. C. Gehr (4141)

R. P. Zimmerman (6295)