ML20210K782

From kanterella
Jump to navigation Jump to search
Certifies That Item 1.a of Attachment 1 to License NPF-46 Complete for Initial Entry Into Mode 2.Operability of All Sys Required for Mode 2 Demonstrated by Successfully Meeting Acceptance Criteria in Tech Specs
ML20210K782
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/18/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-36284-EEVB, NUDOCS 8604290054
Download: ML20210K782 (1)


Text

y ICA Arizona Nuclear Power Project T

g P.O BOX 52034

  • PHOENIX. ARIZON A 85072-2034

'f ANPP-36284-EEVB/JRB-94.04 E/

Pp.

0!

44)*,

b Y3 i,,*

April 18, 1986 Mr. John B. Martin Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission - Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596

Subject:

Certification of the Operability of All Required Systems for Initial Entry Into Mode 2

Reference:

PVNGS Unit 2 Operating License NPF-46

Dear Mr. Martin:

As required by the Palo Verde Nuclear Generating Unit 2 Operating License, NPF-46, I am hereby certifying that item 1.a of Attachment I to the license has been completed for the initial entry into Mode 2.

The operability of all systeas required for Mode 2 has been demonstraced by successfully meeting the acceptance criteria in the PVNGS Technical Specifications.

This has been accomplished by the completion of the applicable surveillance tests or by preoperational testing, which verifies the meeting requirements of the Technical Specifications and which were performed within the required surveillance interval or by operability as demonstrated for Modes 3, 4, 5 and 6.

Very truly yours, dv.

n E.E. Van Brunt, Jr.

Executive Vice. President Project Director EEVB/JRB/bsc cc:

R. Zimmerman A. Gehr

~

8604290054 860418 PDR ADOCK 05000529 PDR P

pg i

ZED /

_