ML20210H793

From kanterella
Jump to navigation Jump to search
Confirms 860319 Conversation Re 860321 Mgt Meeting in Region II to Discuss Facility Requalification Exam Results & Corrective Measures & Component Cooling Water Flow Test Results.Proposed Meeting Agenda Encl
ML20210H793
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/20/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8604030165
Download: ML20210H793 (2)


Text

d MAR 2 0 1986 Florida Power and Light Company ATTN: Mr. C. O. Woody Group Vice President

. Nuclear Energy Department P. O. Box 14000 Juno Beach, FL. 33408 Gentlemen:

SUBJECT:

CONFIRMATION OF MEETING ARRANGEMENTS - TURKEY POINT

, DOCKET NOS. 50-250 AND 50-251 ,

This confirms the conversation between Mr. P. Pace of your staff, and Mr. R. D. Walker of my staff, on March 19, 1986, concerning a management meeting to be held at the Region II Office at 9:30 a.m., on March 21, 1986.

We requested this meeting to discuss the Turkey Point requalification examination results and corrective measures, the component cooling water flow test results, and concerns regarding the. intake-cooling water system flow rates.

Snould you have any questions regarding these arrangements, we will be pleased to discuss them.

Sincerely, J. Nelson Grace Regianal Adminittrator

Enclosure:

Proposed Neeting Agenda cp w/ encl:

W . W. Dickey, Vice President Nuclear Operations vC. M. Wethy, Vice President j.TurkeyPointNuclearPlant J. Baker, Plant Manager Turkey Point Nuclear Plant

. W. Bladow, Plant QA Superintendent

. Arias, Jr., Regulatory and

- / Compliance Supervisor V D. A. Chaney, Nuclear Licer. sing Supervisor B60403o165 860320 cc w/ encl:

jNRCResidentInspector $M ADocM 0500o250 PDR j Document Control De State of Florida i RII RI RII i RI

& RI'( \ / <n '

FGuent er:jd 3/.te/86 q Elrod

/h/86 K nciera 3/p/66 AGibb{r 3/3p/86 yef

- 3786 k {RIalke

/>O/86 l

l I(

2e r

MAR 2 013SS ENCLOSURE Proposed Meeting Agenda FLORIDA POWER AND LIGHT COMPANY MEETING WITH NRC March 21, 1986, 9:30 a.m.

I. Introduction R. D. Walker II. Requalification examir.ation results and proposed corrective measures FPL III. Component cooling water system flow test results FPL IV. Intake cooling water system flow concerns FPL V. Closing Remarks R. D. Walker L