Text

c OPERATING DATA REPORT DOCKET NO.

50-245 DATE 860106 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS-1.

Unit Name:

-Millstone Unit 1 Notes 2.

Reporting Period:

December 1985 3.

Licensed Thermal Power (MWt):

2011 4.

Nameplate Rating (Gross MWe):

662 5.

Design Electrical Rating (Net MWe):

660 6.

Maximum Dependable Capacity (Gross MWe):

684 7.

Maximum Dependable Capacity (Net MWe):

654 4

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 744 8760 132288 12.

Number Of Hours Reactor Was Critical 258.5 7324.4 101078.8 13.

Reactor Reserve Shutdown Hours 0

58.7 2834.5 14.

Hours Generator On-Line 201.5 7252.7 98189.2 15.

Unit Reserve Shutdown Hours 0

67.2 93.7

16. Gross Thermal Energy Generated (MWH) 335918 14205929 180614198 17.

Gross Elec. Energy Generated (MWH) 115000 4804600 60701296 18.

Net Electrical Energy Generated (MWH) 106767 4585612 57889772 19.

Unit Service Factor 27.1 82.8 74.2 20.

Unit Availability Factor 27.1 83.6 74.3 21.

Unit Capacity Factor (Using MDC Net) 21.9 80.0 66.9 22.

Unit Capacity Factor (Using DER Net) 21.7 79.3 66.3 23.

Unit Forced Outage Rate 0

1.3 12.4 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY

~

INITIAL ELECTRICITY N/A COMMERCIAL OPERATION 9604030153 B51231 PDR ADOCK 05000245 R

PDR 1e

n AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-245 UNIT Millstone 1 DATE 860106 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Ext. 4400 MONTH December 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

~3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 32 8

0 24 174 9

0 25 493 10 0

26 608 11 0

27 644 12 0

28 653 13 0

29 M2 14 0

30 659 15 0

31 658 16 0

-INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt, i

l l

I i

DOCKET NO.

50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 1 DATE 860106 I

COMPLETED BY G. Newburgh-REPORT MONTH December 1985 TELEPHONE (203) 447-1791 Ext. 4400 l

2 l

No.

Date Type Duration Reason Method of Licensee Systeg Compogent Cause & Corrective l

(Hours)

Shutting Event Code Code Action to 3

i Down Reactor Report #

Prevent kecurrence l

L l

9b 851201 5

542.5 C

4 N/A N/A N/A Refueling Outage l

l-l 1

2 3

4 l

F:

Forced Reason:

Method:

Exbibit G - Instructions i

S:

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data l

B-Maintenance or Test 2-Manual Scram Eritry Sheets for Licensd l

C-Refueling 3-Automatic Scram Event Report (LER) File i l

D-Regulatory Restriction 4-Continued from (NUREG-0161) l E-Operator Training & License Examination previous a.onth F-Administrative 5-Power Reduction 5

G-Operational Error (Explain)

(Duration = 0)

Exhibit 1 - Same Source H-Other (Explain) 6-Other (Explain) e O

REFUELING INFORMATION REQUEST 1.

-Name of facility: Millstone 1 2.

Scheduled date for next refueling shutdown: May 1987 3.

Schedule date for restart following refueling: August 1987 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes, Technical Specification Changes Regarding:

(1) Maximum Average Planar Linear Heat Generating Rate (2) Maximum Critical Power Ratio 5.

Scheduled date(s) for submitting licensing action and supporting information:

Spring 1986 6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

200 GE8B Fuel Assemblies 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) In Core: (a) 580 (b) 1546 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

2184 Assemblies 9.

The projected date'of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1987, Spent Fuel Pool Full Core Off Load Capability is Reached.

1991. Core Full, Spent fuel Pool Contains 2146 Bundles.

I i

OPERATING DATA REPORT DOCKET NO. 50-245 DATE 851108 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS 1.

Unit Name:

Millstone Unit 1 Notes 2.

Reporting Period:

October 1985

  • 0ctober 1985 revised 3.

Licensed Thermal Power (MWt):

2011 4.

Nameplate Rating (Gross MWe):

662 5.

Design Electrical Rating (Net MWe):

660 6.

Maximum Dependable Capacity (Gross MWe):

684 7.

Maximum Dependable Capacity (Net MWe):

654 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr. - to-Date Cumulative 11.

Hours In Reporting Period 745 7296

~130824 12.

Number Of Hourr, Reactor Was Critical 582.8 7065.9 100820.3 13.

Reactor Reserve Shutdown Hours 0

58.7 2834.5 14.

Hours Generator On-Line 579.0 7051.2 97987.7 15.

Unit Reserve Shutdown Hours 0

67.2 93.7 16.

Gross Thermal Energy Generated (MWH) 1105552 13870011 180278280 17.

Gross Elec. Energy Generated (MWH) 365900 4689600 60586296 18.

Net Electrical Energy Generated (MWH) 347832 4481586 57785746 19.

Unit Service Factor 77.7 96.6 74.9 77.7 97.6 75.0 20.

Unit Availability Factor 21.

Unit Capacity Factor (Using MDC Net) 71.4 93.9 67.5 66.9 1

22.

Unit Capacity Factor (Using DER Net) 70.7 93.1

__~

12.4 23.

Unit Forced Outage Rate 3.4

1. 4 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Presently shutdown for 5 week refueling outage 25.

If Shut Down At End Of Report Period, Estimated Date of Startup: November 28,1985 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION i

l 1

DOCKET NO. 50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 1 DATE 851108 COMPLETED BY G. Newburgh REPORT MONTH October 1985 TELEPHONE (203) 447-1791

  • revised Ext. 4400 l

2 No.

Date Type Duration

??ason Method of Licensee Systeg.

Compogent Cause & Corrective (Hours)

Shutting Event Code Code

~ Action to 3

Down Reactor Report #

Prevent Recurrence 8

851007 F

20.3 B

3 83-020 JD PSV Worn scram pilot valves were replaced and the preventive maintenance program nas been accelerated.

9 851025 S

145.7 C

1 N/A N/A NA Refueling outage scheduled from 851025 to 851128 1

2 3

4 F:

Forced Reasra:

Method:

Exhibit G - Instructions 5:

Scheduled A-Ecsipment Failure (Explain) 1-Manual for Preparation of Data B-P4intenance or Test 2-Manual Scram Entry $heets for Licensea C-kefueling 3-Automatic Scram Event Report (LER) File D a gulatory Restriction 4-Continued from (NUREG-0161) e E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5

G-Operational Error (Explain)

(Goration = 0)

Exihibit 1 - Same Source H-Other (Explain) 6-Other (Explain) 9

OPERATING DATA REPORT DOCKET NO.

50-245 DATE 860106 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS 1.

Unit Name:

Millstone Unit 1 Notes 2.

Reporting Period:

November 1985

  • November 1985 revised 3.

Licensed Thermal Power (MWt):

2011 4.

Nameplate Rating (Gross MWe):

662 5.

Design Electrical Rating (Net MWe):

660 6.

Maximum Dependable Capacity (Gross MWe):

684 7.

Maximum Dependable Capacity (Net MWe):

654 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr. - to-Date Cumulative

11. Hours In" Reporting Period 720 8016 131544
12. Number Of iburs Reactor Was Critical 0

7065.9 100820.3 13.

Reactor Reserve Shutdown Hours 0

58.7 2834.5 14.

Hours Generator'Un-Line 0

7051.2 97987.7 15.

Unit Reserve Shutdown Hours 0

67.2 93.7 16.

Gross Thermal Energy Generated (MWH).

0 13870011 180278280 17.

Gross Elec. Energy ~ Generated (MWH) 0 4689600 60586296 18.

Net Electrical Energy Generated (MWH)* -2741 4478845

  • 57783005 19.

Unit Service Factor 0

88.0 74.5 20.

Unit Availability Factor 0

88.8 74.6 21.

Unit Capacity Factor (Using MDC Net) 0 85.5 67.2 22.

Unit Capacity Factor (Using DER Net) 0 84.7 66.6 23.

Unit Forced Outage Rate 0

1.4 12.4 24.

Shutdowis Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down At End Of Report Period, Estimated Date of Startup: December 16, 1985 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION i

r i

DOCKET NO. 50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 1 DATE 851210 COMPLETED BY G. Newburgh REPORT MONTH NOVEMBER 1985 TELEPHONE-(203) 447-1791 Nrevised Ext. 4400 l

2 No.

Date Type Duration Reason Method of Licensee Systeg Compogent' Cause & Corrective (Hours)

Shutting Event Code Code Action to 3

Down Reactor Report #

Prevent Recurrence 9a *851101 S

720 C

4 N/A

'N/A N/A Refueling Outage.

l l

1 2

3 4

F:

Forced Reason:

Method:

Exhibit G - Instructions S-Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual. Scram Entry Sheets for LicensG C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161) l E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5

G-Operational Error (Explain)

(Duration = 0)

Exihibit 1 - Same Source-H-Other (Explain) 6-Other (Explain) e O

O A

General Offices

  • Seiden Street, Berlin, Connecticut v co-ec+ cue us.' -e ac== co- -

P.O. BOX 270 l

"$'""""*"**"C""

HARTFORD. CONNECTICUT 06141-0270

- [1", *[~,,,,

7 1

(203) 666-6911 L

L J

. mi.

.y..

January 13, 1986 MP-8595 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Reference:

Provisional License DPR-21 Docket No. 50-245

Dear Sir:

In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed. One additional copy of the report is enclosed.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY U h 2.,A

/

W. D. Rombe Station Superintendent Millstone Nuclear Power Station WDR/GSN:jlc

Enclosures:

(

)

cc:

Director, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D. C. (10)

U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D.C. 20555 l

f l

f

\\

l

\\