Interim Deficiency Rept DER 85-38 Re QA Audit at Ge. Initially Reported on 851108.Auditing of GE Facility Continuing.Final Rept Delayed Until 860414
ML20210H706
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/13/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-35514-EEVB, DER-85-38, NUDOCS 8604030134
Download: ML20210H706 (2)


Text

v.

s 3

d.%",

-e Va o

Arizona Nuclear Power Project

's.

O 9

P O BOX 52034 e PHOENIX. ARIZONA 85072-2034 March 13, 1986 d

ANPP-35514-EEVBJr/LAS/DRL-92.11 U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Valnut Creek, California 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Palo Verde Nuclear Generating Station (PVNGS)

Units 2 and 3 Docket Nos. 50-529, 530

Subject:

Time Extension for Report - DER 85-38 A 50.55(e) Potentially Reportable Deficiency Relating to QA Audit at General Electric File:

86-006-216; 86-056-026; D.44.2

Reference:

(A) Telephone Conversation Between A. Hon and T. P. Siegfried on November 8, 1985 (Initial Reportability - DER 85-38)

(B) ANPP-34165, dated December 4, 1985 (Interim Report - DER 85-38)

(C) ANPP-34394, dated January 3, 1986 (Time Extension - DER 85-38)

(D) ANPP-35134, dated February 14, 1986 (Time Extension - DER 85-38)

Dear Sir:

The NRC was notified of a Potentially Reportable Deficiency in Reference (A), an Interim Report was transmitted by Reference (B) and Time Exten-sions were issued by References (C) and (D). At that time, it was esti-mated that a Final Report would be available by March 14, 1986.

Auditing of the GE facility is currently being conducted to verify implementation of corrective action identified in the accepted GE responses.

It.is now expected that this information will be finalized by April 14, 1986, at which time a complete report will be submitted.

Very truly ours

- E CU L

^

E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVBJr/DRL:ske cc: See Page 2 8604030134 860313 g0 PDR ADOCK 050 9

S Y%)l

.ANPP-35514-EEVBJr/LAS/DRL-92.11 March 13, 1986 DER 85-38 Time Extension Mr. D. F. Kirsch-Acting Director Page 2 cc:

J. M. Taylor, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 A. C. Gehr (4141)

R. P. Zimmerman (6241)

Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339