Forwards Rept for Predecisional Enforcement Conference on 970418 Re Violations Identified in Insp Repts 50-440/96-16, 50-440/96-17 & 50-440/96-18
ML20210H512
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/04/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CENTERIOR ENERGY
Shared Package
ML20210H513 List:
References
50-440-96-16, 50-440-96-17, 50-440-96-18, EA-96-482, EA-96-542, EA-97-047, EA-97-47, NUDOCS 9708140053
Download: ML20210H512 (3)


See also: IR 05000440/1996016

Text

b

August 4, IP97

,

-

,. ] [

EA 96 482

EA 97.047 -

%[

EA 96 542-

f

Mr. Lew W. Myers

Vice President - Nuclear

I

.

'

Centerior Service Company

j-

P. O. Box 97, A200

Perry, OH 44081

,

- SUBJECT:

NRC PREDECISIONAL ENFORCEMENT CONFERENCE REPORT

'

. Dear Mr. Myers:

This refers to a Predecisional Enforcement Conference conducted by

Mr. A. Bill Beach, Regional Administrator, and other members of the Region 111

staff on April 18,1997. The Predecisional Enforcement Conference was conducted to

discuss the apparent violations identified in Inspection Reports 50-440/96016,

50-440/96017, and 50-440/96018 involving fire protection (EA 96-482), a defective

.

,

circuit breaker (EA 96 542), ar,d inadequate reactivity control (EA 97-047), respectively.

'

We have enclosed a report summarizing the discussion.

.

You will be notified by separate correspondence of our decision regarding the enforcement

action based on the information presented and discussed at the Predecisional Enforcement.

Conference. No response is required until you are notified of the proposed Enforcement

Action.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and the enclosures will be placed in the NRC Public Document Room (PDR). We will gladly

discuss any questions you have concerning this Predecisional Enforcement Conference.

Sincerely,

/s/ Marc Dapas for

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No. 50-440

License No. NPF-58

Enclosure: Predecisional Enforcement

Conferenca Report

PLEASE SEE PREVIOUS CONCURRENCES

!

DoctMENT NAME: fWNSPfFTSPOWERSPEIRPER90018.ENF

To ,eemve a copy of this docurrent, irdcate in the box "C" = Copy without attachterW *E" = Copy with ettach/enet 'N' = No copy

overs

m

m

m

m

NM 5

Schwebenalco

Wrght

Clayton

Grant /Dapes

DATE

8/ 19 7

B! 19 7

8/ ~ 197

8/ 19 7

vern. int ntcono cost

1

9708140053 970804

~

llglllJll.lgllll[ll

PDR

ADOCK 05000440

l.

.

. . .

G

PDR

g

i

.

_

- _ . . .

-_

_ . _ _ .

_

_

.

EA 96 482

- EA 96 542

EA 97-047

Mr. Lew W. Myers

Vice President Nuclear

Centerior Service Company

P. O. Box 97, A200

4

Perry, OH 44081

,

SUBJECT:

NRC PREDECISIONAL ENFORCEMENT CONFERENCE REPORT

Dear Mr. Myers:

This refers to a Predecisional Enforcement Conference conducted by Mr. A. B. Beach,

Regional Administrator, and other members of the Region ill staff on April 18,1997.

The Predecisional Enforcement Conference was conducted to discuss the apparent

_violations identified in Inspection Reports 50-440/96016, 50-440/96017, and

50-440/96018 involving fire protection (EA 96 482), a defective circuit t,reaker

(EA 96 542), and inadequate reactivity control (EA 97-047), respectively. We have

enclosed a report summarizing the discussion.

You will be notified by separate correspondence of our decision regarding the enforcement

action based on the information presented and discussed at the Predecisional Enforcement

.

Conference - No response is required until you ere notified of the proposed Enforcement

Action.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and the enclosures will be placed in the NRC Public Document Room (PDR). We will gladly

discuss any questions you have concerning this Predecisional Enforcement Conference.

Sincerely,

Geoffrey E. Grant, Director

Division of Reactor Projects

,

'

Docket No. 50-440

License No. NPF-58

. Enclosure: Predecisional Enforcement

Conference Report

DOCUMNT NAME: R:\\lNSPfW"T SPOWERSPEHR\\PEh0601..ENF

To secove a copy of thes document, indecete in the bou 'C' = Copy wrthout ettech!anct 'E' = Copy with attach /enet

'N' = No copy

h

b

0FFICE

NH

NU

NH

NN

(4

o, tm e p/pl/

SAP

w t a

C.,

Cwton

==

seh

w,.o

'

'

.ib.,

.i t ,,,

.a i.,

.i v.,

nr,

.

,

,

S_-

"'

L W. Myers:

-2-

cc w/ encl::

H; L. Hegrat, Manager,

-

Regulatory Affairs

- W. R. Kanda, Director, Quality and

,

_

_ Personnel Development

J. J. Powers, Director,

_

. Nuclear Engineering Department

- W. R. Kanda, General Manager,

- Nuclear Power Plant Department

H. Bergendahl, Director Plant Services

Terry J.- Lodge, Esq.

5tse Liaison Officer, State of Ohio -

_

Robert E. Owen, Ohio :

Department of Health

. C. A. Glazer, State of Ohio

Public Utilities Commission-

Distribution:

-

.

Docket File w/enci

SRI Perry w/enct

PUBLIC IE-01 w/ encl

DRP w/ encl

OC/LFDCB w/ encl

Rlli PRR w/ encl

Project Manager, NRR w/enct

CAA1 w/ encl (E mail)

A. B.- Beach, w/ encl

Rlli Enf.~ Coordinator, w/enci

Deputy RA, w/enci-

DRS (2) w/enci

,

TSS w/ encl

DOCDESK (E-mail)

J. Lieberman, OE w/enci-

J. Goldberg, OGC w/ encl