Monthly Operating Rept for Dec 1985
ML20210H200
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/31/1985
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8604020715
Download: ML20210H200 (4)


Text

- - . - . - . a. . . ,: -. _. . . . ._ ..

F,Q O M 377 3124 (THU301.02.'06 10s04 HO.2 PAGE 3 OPERATING DATA REPCRT ~

' WNP-2 f

~

.'~ 02-Jan-86 I

f

, 1. DOCKETa 50-397

2. REPORTING PERIOD: Dec-85 OUTAGE +0N-LINE HOURS 744
3. UTILITY CONTACT:- .- . LEONARD HUTCHISON (509) 377-2486 q

0 LICENBED THERMAL POWER (MWt): 3323

5. NAPEPLATE RATING (SROSS NWe> 1200.1

> 6. DESIGN ELECTRICAL RATING (NET MWe)i 1100 '

l 7. MAXIMLM DEPENDABLE CAPACITY: .(GROSS MWe): 1140 O. MAXIMUM DEPENCABLE CAPACITY' (NET MWe): 1095 l IF GES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

l9. -------

10. POWER TO WHICH RESTRICTED, IF ANY.(NET MWe) 775 MWe NET
11. REASONS FOR RESTRICTIONS, IF ANY: "B" RRC PUMP IN0PERABLE 1

q -____- _______------- ---------- -

I MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS '

744 8760 9200.2

'13. HOIRS REACTOR CRITICAL 744.0 6899.6 7316.1

10. RX RESERVE SHTDWN Nts , O.0 0.0 0.0

.15. HRS GENERATOR ON LINE j 730.4 6628.0 7026.4 10.-UNIT RESERVE SHUTDOWN HOURS 0.0 0.O 0.0 L 17. GROSS THERMAL ENERGY (MWH) ! 1711125 16350652 17564200

" 10. GROSS ELECTRICAL ENERGY (MWH) 557090 5396320 5823250

, 19. NET. ELECTRICAL ENERGY (MWH) 536309 5176387 5586773 I 20. UNIT SERVICE FACTOR ' 98.2% 75.7% 76.4%

21. UNIT AVAILABILIfY FACTOR 98.2% 75.7% 76.4%

. 22. UNIT CAPACITY' FACTOR (MDC NET) 65.8% 54.0% 55.5%.

I: 23. UNIT CAPACITY FACTOR (DER NET) 65.5% 53.7% 55.2%

20. UNIT FORCED OUTAGE RATE' < 1.8% 10.2%. 10.2%

f_25.FORCEDOUTAGE' HOURS '

13.6 756.9 798.6

\

!. 26. SHUTDOWNS SCHEDULED.'OVER THE NEXT'6 MONTHS (TYPE,DATE, DURATION):

! __ RFFilFI TNG_f@flTCNANrF 01]Edf,.1,5fB5,JS,B_6Q.Say.S. ___-__-_____-_-_

l 27. IF CURRENTLY EHUTDOWN ESTIMATED STARTUP DATE:

8604020715 e5i231 PDR R ADOCK 05000397 --+

L b% w PI)R

\t

\k I e .., > .

y

. . . DOCKET NO. 50-397 , ..

UNIT iWiE.' WNP-2 ,

DATE 1-2-86 LNIT SIRJTDOWNS / REDUCTIONS COMPLETED BY L.B. HUTCHIS0N REPORT PERIOD DEC 1985 TELEPilotE (509)377-2486 month, yea'r NO, DAT TViT HDuitS REASON METHOD LER nut 0ER SYS1EM C(NPONENT CAUSE & C0lWECTIVE ACTION 10 litEVENT llECUlstENCE 85-02P 7-1-85' F 0 A 5 -

CB' PUMPXX POWER OUTPUT LIMITED TO 72% DUE TO IN0PERABILITY 0F "B" RRC PUMP ,

85-18' 12-6-85 S 13.63 B 1 --

CB PUMPXX REACTOR POWER WAS REDUCED AND GENERATOR TAKEN OFF LINE DURING THE DRYWELL ENTRY FOR INSTALLING A POWER SUPPLY TO RRC PUMP VIBRATION TEST INSTRU-MENTATION.

1 I- I -

I SLfftARY l WNP-2 OPERATED AT A REDUCED POWER LEVEL DURING THE ENTIRE MONTH WITH ONE SHUTDOWN. .

TYPE REASON METil0D SYSTEM & POMP 0 TENT F-Forced A-Equip Failure . F-Admin 1-Manual Exhibit F & H -

S-Schcd D-Maint or Test G-Oper Error' 2-Manual Scram Instruction,s for C-Refueling Il-Other 3-Auto Scram Preparation of D-Rc0ulatory Restriction 4-Cmtinued Data Entry Sheet E-Operator Training -

5-Reduced Load Licensee Event fleport

& License Examination 9-Other (LER) File.(NUREG-0161)

s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397

- _ _ . ~ - - - - - - - - -

UNIT WNP-2

~ DATE 1/2/86 COMPLETED BY L.B. HUTCHISON TELEPHONE (509)377-2486 MONTH DECEMBER 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) 1 736 37 755

  • 2 738 '

752

' 1s -

3 744 751 i,

4 745 750 20 5 750 752' 21 s 605 752 22 ,

7 195 751 23 s 566 M 24 f , 739 747 25 to 754 28 747 11 755 752 27 12 752 752 2s .

13 749 754 2s- -

14 748' 754 ao _

15 747 753 31 __

to 752 5

INSTRUCTIONS .

On this form, list the average daily unit power level in htWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

'these Sgures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explam the apparent anomaly.

- - ' m mr % m,..y. . _ .

s g.

-6

_ Washington Public Power Supply System 3000GeorgeWashingtonWay P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 January 6, 1986 Docket No. 50-397 Director Office of Resource Management U.S. Nuclear Regulatory Comission

~ Washington, D. C. 20555

Dear Sir:

Subject:

. NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for December 1985 as required by our Technical Specifications -6.9.1.6.

Very- truly yours, hf0 sw C. M. Powers (M/D 927M)

WNP-2 Plant Manager-

-CMP /lc Enclosure cc: Mr. John B. Martin - NRC, Region V Mr. A. D. Toth -