, _ _ - _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ - _ _ _ _ _ __-____-__ _ -___-__
AVERAGE DAILY UNIT POER LEVEL DOCKET N0. 50-423 UNIT Millstone Unit No. 3 DATE 1/6/86 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 MONTH December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGI DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
23 PDR ff2,f 0
OPERATING DATA REPORT DOCKET NO. 50'-423 DATE 1/6/86 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 OPERATING STATUS 1.
Unit Name: Millstone Unit 3 NOTES 2.
Reporting Period: December 1985 3.
LicensedThermal. Power (MWt): 170 4.
Nameplate. Rating (GrossMWe): 1208 5.
Design Electrical Rating (Net MWe): 1153 6.
Maximum Dependable Capacity (Gross MWe): 0 7.
Maximum Dependable Capacity (Net MWe): 0 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.
. Power Level To Which Restricted, If Any (Net MWe): 0 10.
Reasons For Restrictions, If Any: Initial Startup This Month Yr To Date
. Cumulative 11.
Hours In Reporting Period N/A N/A N/A 12.
Number of Hours Reactor Was Critical N/A N/A N/A 13.
Reactor Reserve Shutdown Hours N/A N/A N/A 14.-
Hours Generator On Line N/A N/A N/A 15.
Unit Reserve Shutdown Hours N/A N/A N/A 16.
Gross Thermal Energy Generated (MWH)
N/A N/A N/A
~17.
Gross Electrical Energy Generated (MWH)
N/A N/A N/A 18.
Net Electrical Energy Ganerated (MWH)
N/A N/A N/A 19.
Unit Service Factor N/A N/A N/A 20.
Unit Availability Factor N/A N/A N/A
'21.
Unit Capacity Factor (Using MDC Net)
N/A N/A N/A 22.
. Unit Capacity Factor (Using DER Net)
N/A N/A N/A
- 23..
Unit Forced Outage Rate N/A N/A N/A 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration cf Each):
(See Attached) 25.
If Shut Down at End of Report Period, Estimated Date of Startup:
26.
Units in Test Status (Prior to Commercial Operation): Forecast Achieved Initial Criticality 1/23/86 Initial Electricity 2/2/86 Commercial Operation 5/1/86
Operating Data Report Attachment
- 24. Scheduled Shutdowns During Startup Testing
. January 26, 1986 Reactor Trip per Technical Specification during Low Power Physics Tests
- 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> duration.
February 11, 1986 Reactor Trip from 30% power during Ascension Testing - 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> duration.
February 18, 1986 Reactor Trip from 50% power during power Ascension Testing - 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> duration.
February 27, 1986 Reactor Trip from 20% power during power Ascension Testing - 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> duration.
March 14. 1986 Reactor Trip from 100% power during power Ascansion Testing - 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> duration.
i l
l l
UNIT SHUTDOWNS AND POER REDUCTIONS DOCKET N0. 50-423 UNIT Millstone Unit No. 3 DATE 1/6/86 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 REPORT MONTH December Method of L'icensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date Type (1)
(Hours)
Reason (2)
Down Reactor (3) Report #
Code Code Prevent Recurrence N/A N/A S
N/A H
JN/A N/A N/A N/A Initial Plant Startup i
1 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets for C - Refueling 3 - Automatic Scram Licensed Event Report D - Regulatory Restriction 4 - Continued from (LER) File (NUREG-0161)
.E - Operator Training & License
. previous month Examination 5 - Power Reduction 5 F - Administrative (Duration = 0)
Exhibit 1.- Same Source G - Operational Error (Explain) 9 - Other (Explain)
H - Other (Explain).
/
NCRTHEAST UTII.ITIES f[hhhf5 ff[b$i ""' """ '
L L
J ;;:T::OC,"J.ll T"l January 13, 1986 MP-8594 Director, Office of Resource Management U. S. Nuclear Regulatory Comission Washington, D. C. 20555
Reference:
Facility Operating License No. NPF-44 Docket No. 50-423
Dear Sir:
This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 3 Monthly Operating Report 85-1 in accordance with Technical Specifications, Section 6.9.1.5.
One additional copy of the report is enclosed.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY b)$ j%
W. D. R erg Station Superintendent Millstone Nuclear Power Station WDR/DM:se Attachment cc: Regional Administrator, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D.C. (10)
U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D. C. 20555 r