Monthly Operating Repts for Jan 1987
ML20210F553
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/31/1987
From: Fay C, Krause C
WISCONSIN ELECTRIC POWER CO.
To:
References
CON-NRC-87-013, CON-NRC-87-13 VPNPD-87-056, VPNPD-87-56, NUDOCS 8702110105
Download: ML20210F553 (9)


Text

..- --.

OPERATING DATA REPORT' 4

DOCKET NO. 50-266 DATE February 5,-1987 COMPLETED BY C. W. KRAUSE 1-TELEPHONE 414 221 2001 OPERATING STATUS l

1. UNIT NAME: POINT: BEACH NUCLEAR PLANT UNIT 1

. NOTES

2. REPORTING PERIOD:

JANUARY'1987

3. LICENSED THERMAL POWER (MWT): 1518.
4. NAMEPLATE RATING (GROSS MWE):

523.8 I

5. DESIGN ELECTRICAL RATING (NET MWE): 497.

l

6. MAXIMUM DEPENDABLE CAPACITY (GROSS dWE): 509.
7. MAXIMUM DEPENDABLE CAPACITY (NET hWE): 485.

j

8. If CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE j

THIS MONTH-YR TO DATE CUhulATIVE j

11. HOURS IN REPORTING PERIOD 744 744 142,344 NE
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0-744.0 116,122.4 O"D
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 645.4 O@
14. HOURS' GENERATOR ON LINE 744.0 744.0 113,438.4 bO
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 832.0 i

m:c

16. GROSS THERMAL ENERGY GENERATED (MWH) 1,127,392-1,127,392 155,831,742 j

0,

17. GROSS ELECTRICAL ENERGY GENERATED (MUH) 386,760 386,760 52,480,730 i

,O

18. NET. ELECTRICAL ENERGY' GENERATED (MWH) 371,259 371,259

.49,960,181 d

19. UNIT SERVICE FACTOR 100.0 100.0 79.7

$g

20. UNIT AVAILABILITY FACTOR 100.0 100.0 80.3 j

No

21. UNIT CAPACITY FACTOR (USING MDC NET) 102.9 102.9~

71.9

22. UNIT CAPACITY FACTOR (USING DER NET) 100.4 100.4 70.6
23. UNIT FORCED OUTAGE RATE

.0.0-0.0 2.2 l

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE,.'DATE, AND DURATION OF EACH):

Seven-week refueling and maintenance outage scheduled to conunence April 3,.1987.

g

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE 0F STARTUP: NOT SHUTDOWN i

T DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

DOCKET NOo 50-266 UNIT NAME Point Beach, Unit 1-DATE February 5, 1987 COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH January 1987 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY.

POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

501 11 475 21 499 2

503 12 500 22.

499-3 501 13 500 23 497 4

501 14 501 24 497 5

502 15 500 25 499 6

502 16 499 26 498 7

502 17 499 27 502 8

500 18 499 28 500 9

501 19 498 29 500 10 498 20 497 30 500 500 EQR-28a (04-86)

^M Z

oc mW

.. m.

o cn i

(D M m cD

-W to m o

00 w

D' M rt (D o (D

0, @

c o, 7

Type 1 o,

Duration (Hours) w

x: o m MEOW >W l

(D s i e i i e i$

Reason 2 00>

OWW3MO gt g f-@ $ 2 E'g D t@ (D o

@$H.

H. "

Method of

"$5.@$7*$g Shutting DOwn

^ H in D 0 et H D (D Reactor 3

@ O rt in M O D W D 1

M D M H-M LQ D tt C

tW>DHN O

c' E

H H et @ M (D m H-H W

H-WW W

WO H

H M< MH-@

O H-(D (D D M @ M D in MH

  • O D M

vM W H rt C

O to M

O BDM HM M tD M

tQ H-et @

O O

In W

m rt rt e ZM H

^

H-O<

t 3

M O

M t

D t

D O

to H

H ct W

W H-H-

D D

System Code 4 q

W W

t mm ik (4 N H 3 D

M c

W Component ONNO>230 Code 5 et @ M O C 6 > O,

~

D' Q, (D D rt D D a C

(D c < ft O c c H

O M n H-H 5 m w H

@OD>HH (D

H

- 0. c c et 4

O (D

in W H In Z

M t" rt O O to V O (A H-M H W D' O cn A m O,c D 0 5 O

H-rt M

Hm HOeC D

Q, 0 m oc MO>Z 0m3 (n

t" 2 H w w

C N@

MNMH D

M N t" (D m M

Z m

a H.

M M

@O M

Z M

M D0 e

O D'

t" Q, % D' rt M H-M > 0 H-M W

W rt M O' W@

H:

H.

H.

@O.

rt W t rt O ct N

H- @ M C H-m o M

HD@Q M<

@ H-I

@ rt t M@

A O tr D to NWH (D

H

+

M tt W.

^NND D>

A C

(n B

> rn OO N * > W o r

M I

to t ct

@ rt N

D' H M H-to W W M (n

(D O C O

P M O m O

O2UO U

1 M W D' m c

et et M W M

o tn O H-O C C

O H

%O o n H D t>

D H S @ H-H (n

CD tt w

4 H

' NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.

50-266 Unit Name Point Beach Unit 1 Date February 5, 1987 Completed By C. W. Krause Telephone 414/221/2001 Unit 1 operated at 500 MWe net throughout the period with no trips or significant power reductions.

Safety-related maintenance performed during the period included replacement of a torque switch on a valve in the residual heat removal system and rebuilding a motor operator of a valve in the service water system line which cools one of the spent fuel pit heat exchangers.

J i

y-,-

OPERATING DATA REPORT DOCKET NO. 50-301 DATE February 5, 1987 COMPLETED BY C. W. KRAUSE TELEPHONE 414 221 2001 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2

. NOTES

2. REPORTING PERIOD:

JANUARY 1987

3. LICENSED THERMAL POWER (MUT): 1518.
4. NAMEPLATE RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MWE): 497.
6. HAXIMUM DEPENDABLE CAPALITY (GROSS MWE): 509.
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 744 744 127,129
12. NUMBER OF HOURS REACTOR WAS CRITICAL 710.3 710.3 111,521.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 209.4
14. HOURS GENERATOR ON LINE 703.0 703.0 109,692.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 244.2
16. GROSS THERMAL ENERGY GENERATED (HWH) 1,037,881 1,037,881 154,504,882
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 354,630 354,630 52,352,260-
18. NET ELECTRICAL ENERGY GENERATED (MWH) 338,709 338,709 49,868,307
19. UNIT SERVICE FACTOR 94.5 94.5 86.3
20. UNIT AVAILABILITY FACTOR 94.5 94.5 86.5
21. UNIT CAPACITY FACTOR (USING MDC NET) 93.9 93.9 80.0
22. UNIT CAPACITY FACTOR (USING DER NET) 91.6 91.6 78.9
23. UNIT FORCED OUTAGE RATE 0.0 0.0 1.2
24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

DOCKET NO.

50-301

~

UNIT NAME Point Beach, Unit 2 DATE February 5, 1987 COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH January 1987 4

AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY.

POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 4

1 492 11 498 21 498 2

339 12 495 22 499 3

495 13 498 23 496 4

497 14 498 24 495 5

498 15 497 25 499 6

498 16 490 26 498 7

497 17 26 27 495 8

496 18

-9 28 498 9

498 19 345 29 498 10 496 20 496 30 498 499 EQR-28a (04-86)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-301

~

UNIT NAME Point Beach Unit 2 DATE February 5, 1987 REPORT MONTH January 1987 COMPLETED BY C. W. Krause TELEPHONE 414/221-2001

~

M bn c

c^

a oM c

o M

e

-H W o

tD o E,

cm e

4s m

oc4 ee oe 5o m

o -a U Licensee Event ue o.t Cause & Corrective Action No.

Date g

$3 fide Report No.

$,0

$0 To Prevent Recurrence s

m o

gym a

m 9

870102 S

21.0 B

5 N/A ZZ ZZZZZZ Power reduction began as' requested by the WE system control office.

Power was further reduced to repair i

I a main feed pump bearing.

Power was increased after a brief hold i

l due to secondary chemistry.

10 870117 S

41.0 B

1 N/A AB ZZZZZZ Planned maintenance outage to repair a packing follower on an RCS flow transmitter isolation l

valve.

4 Exhibit G-Instructions 3 Method:

1F:

Forced 2 Reason:

S:

Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced Load SExhibit I-Same Source F - Administrative 6 - Other (explain)

G - Operational Error (explain)

H - Other (explain)

EQR-28B (06-86)

1 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket.No.

50-301 Unit Name Point Beach Unit 2 Date February 5, 1987 Completed By C. W. Krauce Telephone 414/221-2001 Unit.2 operated at 498 MWe net throughout the period.

On

-January 2, 1967, at 12:30 AM, load was reduced for load follow purposes.

Shortly thereafter, load was further reduced to repair ;

a main feed pump bearing.

An administrative hold was placed on

~

power increase due to pH levels on the suction side of the pump.

About four hours later, the hold was~ removed and the unit was back at full power at 11:30 PM.

On January 17, 1987, a brief outage commenced for repair of an RCS flow transmitter isolation valve which had been leaking.

During the outage, main. steam isolation valve 2017 failed to completely close during a stroke test.

Both MSIVs were repaired..The event is being reported as a supplement to LER 86-004 which reported a similar occurrence.

No other safety-related maintenance was performed during the period.

s t

,_m

I Wisconsin Electnc eom couem 231 W. MICHIGAN. P.O. BOX 2046. MILWAUKEE, WI 53201 (414) 221-2345 VPNPD-87-056 NRC-87-013 February 6, 1987 Document Control Desk U.

S. NUCLEAR REGULATORY COMMISSION Washington, D.

C.

20555 Gentlemen:

Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of January 1987.

Very truly yours,

(

(It. V ' /

C. W./F Vice President Nuclear Power Attachments Copies to R.

S.

Cullen, PSCW NRC Regional Administrator, Region III Office of Inspection and Enforcement NRC Resident Inspector

}b i

.