Text
.
p; t-E if r
MONTHLY OPERATING REPORT
{.
DOCKET NO.
50-483
[
UNIT NAME CALLAWAY UNIT 1 3
DATE 1/s/a6 COMPLETso BY D. B: PRATTE f
TELEPHONE (314) 676-8460 u
PART A OPERATIONS
SUMMARY
Unit running at 100% for the month of December with the following exceptions:
1.
l l
- 1) On 12-8-85 the unit tripped due to a negative rate reactor trip resulting
,j h
f from a manuni turbine run back. Manual run back was due to loss of
'A' Main Feed Pump.
- 2) On 12-14-85 the unit load was reduced to repair leaks on 'A' High~ Pressure Feedwater heaters.
- 3) on 12-26-85 the unit trippe.1 due to a spurious OT DELTA T spike on Loon I with Loon III in test.
On 12-28-85. the unit was returned to full power.
(
PART B PORV AND SAFETY VALVE
SUMMARY
NONE l9 I
4 (ij 5
I B604020059 B51231
__ 9. V
~
PDR ADOCK 05000483 CA-#804 R
// j 05/09/84 5,;
I QDP-ZZ-04204
[
Page 1 of 4 l
wwww.
n
Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT callaway DATE 1/8/86 COMPLETED BY D.
B.
PRATTE TELEPHONE (314) 676-8460 MONTH DECEMBER 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) i 1140 jy 1190 1140 2
ja 1123 1 9 1121 j
3 19 -
I 4
1122 1124 gg
~
1126 21 1124 5
1128 1125 6
22 1126 1126 7
23 1132 8
24 3
0 3
1199 346 10-26 463 1010 gg yy 202 1121 870 12 g
l 13 1116 2g 1082 1065 1126 94 gg 15 1060 33 1199 ll 1101 16 l
I 4,
CA-#804 05/09/84 i-Page 2 of 4 QDP-ZZ-04204 f
9 Y*
LG2L?cBuh&EhkT2%GGi1L?lli':WMi?J.?L 1%iWX'WT... :R& ' : '4.
.T -
~
It 5
Part D t
f OPERATING DATA REPORT 50-483 1
00CKET NO.
Callaway UNIT DATE 1/8/86 D. B. PRATTE COMPLETED BY (314) 676-8460 TEl.EPHONE i
YTD CUM OPERATING STATUS 744 8760 9062.5
- 1. REPORTING PERIOD:
DECEMBFR 19R5 GRogg MOURS IN REPORTING PERIOD:
3411 max. DEPENo. CAPACITY (WWo.Neti:
1120
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWti:
i OESIGN ELECTRICAL RATING tesWo. Net):
1171*
At stretch power level, etc.
NA
- 3. POWER LEVELTO WHICH RESTRICTED (IF ANY) (MWo. Net!:
- 4. REASONS FOR RESTRICTION (IF ANYl:
THl'S MONTH YR TO DATE CUMULATIVE
'r b97.2 8161 R463.5
- 5. NUMSER OF HOURS REACTOR WAS CRITICAL 0
0 0
- 8. REACTOR RESERVE SHUTDOWN HOURS...
676 7.884.9 8.I87.4
.7.' HOURS GENERATOR ON LINE..
O O
o 5
- 8. UNIT RESERVE SHUTDOWN HOURS
)
........2,212,562 25,015.992 26.017.516
- 9. GROSS THERMAL ENERGY GENERATED (MWHI 760,607 8,474,763 8.813.943
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWHI........
723.984 8.045.764 8.368.ZS7 I
11.' NET ELECTRICAL ENERCY GENERATED (MWM)
F 93.7%
93.2%
91.47
- 12. R E ACTOR SERVICE F ACTOR.....................
93.7%
93.7%
91.4?
- 13. REACTCR AVAILABILITY PACTOR...............
k' 90.8%
90.0%
9 0.1 *r d
- 14. UNIT SERVICE F ACTOR..............................
t 90.8%
90.07 90.17 d
- 15. UNIT AVAILABILITY PACTOR..........................
I t
- 18. UNIT CAPACITY FACTOR (using MDC:...................
86.9%
82.07 A? W 83.1%
78.47 7 R. 9'7
)
- 17. UNIT CAPACITY PACTOR (Umng Dessen MWel..............
9.1%
6.4T 6.27
- 18. UNIT FORCED OUTAG E PATE..........................
- 19. SHUTDOWNS SCHEDULED OVER hExT S MONTHS ITYPE. DATE. ANO DURATION OF EACHl:
Refuel 2/28/86, approximately 42 days.
I
- 20. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
i r
e j
i
)u,b Page 3 of 4 k
n..n.._,,..n.._.._.,..,.,,,
,b y
[v, y
p?
Part E DOCKET NO.
50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME. Callaway w[j
??
QATE 1/8/86 COMPLETED BY _ D. B. PRATTE REPORT MONTil DECEMBFR 1985 TELEPHONE (314) 676-8460 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR C
NO.
DATE S: SCHEDULED (HOURS)
HEASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS 28 12/8/8::
F 43 A
3 High Negative Rate Reactor Trip during power reduction due to loss of ' A' Main Feed Pt:np.
LER 85-051-00 29 12/14/F 5 S
48 B
1 Repair leaks on 'A' High Press Feedwater heaters.
29 12/26/1 5 P
25 A
3 Reactor Trip due to spurious OT DELTA T on Loop I while Loop III in test.
LER 85-054-00
SUMMARY
REASON ETHOO A: EQUleMENT FAILURE (EXFLAIN)
I: MANUAL.
3: MAINT.OR TEST 2: MANUAL SCRAM C: REFUELING 3: At TOMATIC5 CRAM D: REGULATORY.RESTIUCTION 4: OT1IER (EXPLAlse E: OPERATOR TRAINING AND LICENSL EXAMINATION F ADedNISTRATIVE G OrfRATIONAL FRROR(EXFLAIN)
CA-#809 il OTHER(EXFLAIN) 05/09/84
age 4 of 4 QDP-ZZ-04204 wmw,~ -- m.w wn
~,.
I: 1 aes
==m axac cumu Cohey Piont January 9, 1986 Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1236
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT DECEMBER 1985 The enclosed Monthly Operating Report for December 1985 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
kw &
S. E. Miltenberger Manager, Callaway Plant Yf h MET /WRC/DBF/drs Enclosure ec: Distribution attached l
Mailing Address:P.O. Box 620 Fulton,MO65251
E i...
cc-distribution for ULNRC-1236 with enclosures Mr. James G. Keppler Regional Administrator-Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission
. Region III 799 Roosevelt Road Glen Ellyn,.IL 60137 t
Director Office'of Inspection & Enforcement U. S. Nuclear Regulatory-Commission-Washington, DC 20555-r NRC Resident Inspector 7
i W
4 m
+
?
a..
..