0 NRC MONTHLY OPERATING REPORT DOCKET NO.

5_0-206 UNIT NAME SONGS - 1 DATE January 14. 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 OPERATING STATUS

1. Unit Name:

Sar Onofre Nuclear Generatina Station, Unit 1

2. Reporting Period:

December 1985

3. Licensed Thermal Power (MWt):

1347

4. Nameplate Rating (Gross MWe):

456

5. Design Electrical Rating (Net MWe):

436

6. Maximum Dependable Capacity (Gross MWe):

456

7. Maximum Dependable Capacity (Net MWe):

436

8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since.I.ast Report, Give Reasons:

NA

9. Power Level To Which Restricted, If Any (Net MWe):

390

10. Reasons For Restrictions, If Any:

Self-impo_ sed power level limit to control steam cenerator tube corrosion.

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744.00 8 76_0.00 162,584.00 1
12. Number Of Hours Reactor Was Critical 0

6,783.91 96,103.29

14. Hours Generator On-Line 0

0 0

13. Reactor Reserve Shutdown Hours 0

6.730.90 92,371.77

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Therrral Energy Generated (MWH) 0 8.122,911.75 117.310,227.05
17. Gross Electrical Energy Generated (MWH) 0 2,619,000.00 39,829,634.00
18. Net Electrical Energy Generated (MWH)

(1.866.00) 2.457,762.00 37,640,475.00

19. Unit Service Factor 0.00*o 76.84?;

56.81%

20. Unit Availability Factor
0. 00?e 76.84?;

56.81%

21. Unit Capacity Factor (Using MDC Net) 0.0%

64.35";

53.10?;

22. Unit Capacity Factor (Using DER Net) 0. 00?.

64.35?e 53.10*J

23. Unit Forced Outage Rate 0.00; 12.38?s 21.12?e
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling, November 21. 1985. 170 day duration (now in progress).

25. If Shutdown At End Of Report Period, Estimated Date of Startup:

May 1986

26. Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 7596u B604020003 g51231 DR ADOCK O 26 l

l I

~ _. -. - _ -

p

.t-'

a e

AVERAGE DAILY UNIT POWER LEVEL 4

.i DOCKET NO.

50-206-UNIT-SONGS - 1 DATE January 14, 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 MONTHi. December 1985

' DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

.(MWe-Net)

-(MWe-Net)

I l'

O.00 17 0.00' 2

0.00 18-0.00 3

0.00 19 0.00 4

0.00 20 0.00.

5 0.00 21 0.00 6

0.00 22 0.00 7

0'.00 23 0.00 i

[

8' O.00-24 0.00 9

0.00 25 0.00 10 0.00 26 0.00 11 0.00 27 0.00 12 0.00 28 0.00

-13 0.00-29-0.00 14 0.00 30 0.00 o

4 15-0.00 31 0.00 16 0.00 1

i l

-7596u

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET 206 UNIT SONGS

'1 DATE

~

January 14. 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 DATE TIME EVENT

December l' 0001 Unit remained shutdown for refueling and through backfit outage work.

December 31-2400

m e

1

.,,m

'l

.3 -

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET'NO. $0-206 REPORT MONTH DECEMBER 1985 UNIT NAME SONCS -

1..

' DATE J u m y I '+. 1700 COMPLE1ED BY E.

R.

S l aco r

. TELEPHONE (7141 368-6223 Method of Shutting' System Component Cause & Corrective

'l Down 1

Dura t ion 2

3 LEFs 4

'4

. Action to-No.

Date Type (Hours) -Reason Reactor No.

Code

' Code Prevent Recurrence 93 S

744 C

'4 NA

'NA NA Refueling.

?

1 2

3 4.

F-Fo rced Reason:

Hethod:

IEEE Std. 803-1983 S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Ma intenance or Test 2-Ma r..ia l. Sc ram.

C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continua tion f rom E-Operator Training & License Examination Previous Month F-Adm in i s t ra t ive 5-Reduction of 20%

G-Ope ra t iona l Error (Explain)

~. or Creater in the H-Other ( Expla in)

. Past 24 Hours 6-Other ( Expla in) 7596u

e;

e REFUELING INFORMATION DOCKET NO.

50-206 UNIT SONGS - 1 DATE Janunry 14. 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 MONTH:

December 1985 1.

Scheduled date for next refueling shutdown.

March 1988 2.

Scheduled date for restart following refueling.

June 1988 3.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Not yet determined What will these be?

Not yet determined 4.

Scheduled date for submitting proposed licensing action and supporting information.

Not yet determined 5.

Important Licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Not yet determined 6.

The number of fuel assemblies.

a) In the core.

157 b) In the spent fuel storage pool. 94 7.

Licensed spent fuel storage capacity.

216 Intended change in spent fuel storage capacity. NONE 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity..

March 1988

(

7596u

E.

r-

^

f [5 Southem Califomia Edison Company SAN ONOFRE NUCLEAR GENERATING STATION h.

p. O eOx i2s SAN CLEMENTE, CALIFORNIA 92672 H E. MORGAN TELEPHONE ETATK)N MANAGER (7143 384 624,.

I January 14, 1986 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Subject:

Docket No. 50-206 l,

Monthly Operating Report for December 1985 San Onofre Nuclear Generating. Station, Unit 1 l

Enclosed is the Monthly Operating Report as required by Section 6.9.1.10 of

. Appendix A, Technical Specifications to Provisional Operating License DPR-13 l

for. San Onofre Nuclear Generating Station, Unit 1.

Please contact us if we c~an be of further' assistance.

Sincerely, N$ N Enclosures cc:

J. B. Martin (Regional Administrator, USNRC Region V)

F. R..Huey (USNRC Senior Resident Inspector, Units 1, 2 and 3)

INPO Records Center t

t i

..