ML20210E722

From kanterella
Jump to navigation Jump to search
Forwards Rev 13 to Physical Security Plan for Facilities for NRC Review Under 10CFR50.54(p) & Description of Changes.Rev 13 to Plan Incorporates Textual & Figure (Drawing) Changes. Encls Withheld (Ref 10CFR73.21)
ML20210E722
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/04/1987
From: Morgan H
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 8702100352
Download: ML20210E722 (1)


Text

.

n ?"?:'

pl vaw Southem Callfomia Edison Company.

SAN ONOFRE NUCLEAR GENERATING STATION P. O. BOX 128 SAN CLEMENTE. CALIFORNIA 92672 TELEPHONE

~.H.E. MORGAN FEB 4 1987 U. S. Nuclear Regulatory Commission Director, Office of Nuclear Reactor Regulation Attention: Document Control Desk Division of Licensing Washington, D.C.

20555 Gentlemen:

Subject:

Change to Provisional Operating Licenses Docket Nos. 50-206, 50-361 and 50-362 Physical Security Plan (PSP), Revision 13 San Onofre Nuclear Generating Station, Units 1, 2 and 3 This letter forwards Revision 13 to the U. S. Nuclear Regulatory Commission (NRC) approved August 1983 " Physical Security Plan, San Onofre Nuclear Generating Station, Units 1, 2 and 3" for NRC review under 10 CFR 50.54(p).

Page x to this plan (an attachment to the enclosure) provides a chronology of the current NRC review status for each revision to this plan (Revisions 0 through 13).

Revision 13 to this plan incorporates textual and figure (drawing) changes which are designed to mitigate any Safeguards vulnerabilities which may have resulted from the loss of a copy of the PSP.

Distribution of this plan revision is regulated under 10 CFR 50.4(b)(4)(iii) for 10 CFR 50.54(p) review purposes. Accordingly, enclosed are four (4) copies (signed original and three copies) of the description of the changes and of Revision 13 to the plan which is notification of the changes. Two (2) copies have also been submitted to the Regional Administrator, NRC Region V.

l The changes described in the enclosure and its attachments, do not decrease

'the safeguards effectiveness of this plan.

The enclosure and its attachments contain " Safeguards Information" and must be protected under 10 CFR 73.21.

Sincerely, 870210035287hh206 Mb I

hDR ADOCK 05 PDR Enclosure g

cc: Regional Administrator, NRC Region V (2 copies)

F. R. Huey (NRC Senior Resident Inspector, SONGS 1, 2 and 3) i L

SAFEGUARDS INFORMATION DECONTROLLED UPON REMOVAL OF A1TACHMENT(S)