c y
PRfRTTypaugy Etscruic Mwye,g m
v $24=
kNh 1901 GratioiStreet. St. Louis I
NT 71 FIL Q '
September 19, 1986 Mr. James G. Keppler Regional Administrator USNRC Region III 799 Roosevelt Road Glen Ellyn, IL 60137 ULNRC-1372
Dear Mr. Keppler:
CALLAWAY PLANT FACILITY OPERATING LICENSE NPF-30 SAFETY-RELATED_ MOTOR-OPERATED VALVE PROGRAM
References:
1)
NRC I & E Bulletin No. 85-03, dated November 15, 1985 2)
ULNRC-1309, dated May 14, 1986 3)
C. E. Norelius Letter to D. F.
- Schnell, dated August 1, 1986 This letter is being written to document the time extensions granted to Union Electric by the NRC for responding to an NRC request for additional information.
t Reference 1 required holders of Operating Licenses to review and document the design basis for the operation of safety-related motor-operated valves (MOVs) in the high pressure coolant injection / core spray and emergency feedwater systems that are required to be tested for operational readiness in accordance with 10 CPR 50.55 (g).
The results of this review and the design basis documentation were transmitted per Reference 2.
The preliminary NRC review of the Callaway MOV submittal resulted in a request to Union Electric for additional information (Reference 3) to be submitted by September 3, 1986.
l By telecon on August 19, 1986, with Mr. E. G. Greenman (USNRC Region III) Union Electric was granted an extension until September 19 to provide this additional information.
This extension was granted to allow Union Electric to utilize i
information presented to NRR by Motor Operated Valve Analysis And i
l Test System (MOVATS) Inc. at a meeting held in Washington on September 4, 1986.
As a result of the September 4 meeting, Union Electric
$h' #
i\\0 agreed to submit the MOVATS Inc. program for NRC approval.
This program has generic applications for plants that intend to n
8609240349 860919 PDR ADOCK 050004G3
$[p221986 G
PDR Maihng Addiost P.O Box 149, St Louis, MO 63166
3 utilize MOVATS to satisfy the requirements of Bulletin 85-03.
After discussions with MOVATS Inc., Union Electric recognized the need for additional time to properly prepare the MOVATS/Callaway program.
An additional 30 days was discussed with and agreed to by Mr. Greenman in a telecon on September 18.
Union Electric will provide the updated response to Bulletin 85-03 by October 17, 1986, which will include the MOVATS program for testing of motor-operated valves.
Very truly yours, f
/
D. W. Capone Manager - Nuclear Engineering WEK/ mat l
l i
l
<.,n s
cc:
Gerald Charnoff, Esq.
Shaw, Pittman, Potts & Trowbridge 1800 M. Street, N.W.
Washington, D.C.
20036 Nicholas A. Petrick Executive Director SNUPPS 5 Choke Cherry Road Rockville, Maryland 20850 C. W. Hehl Division of Projects and Resident Programs, Chief, Section lA U.S.
Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Bruce Little Callaway Resident Of fice U.S. Nuclear Regulatory Commission RRil Steedman, Missouri 65077 Paul O'Connor Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 316 7920 Norfolk Avenue Bethesda, MD 20014 Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102