ML20210E027
| ML20210E027 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/10/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20210E035 | List: |
| References | |
| NUDOCS 8609220084 | |
| Download: ML20210E027 (3) | |
See also: IR 05000424/1986073
Text
-
-f &
r
-3
SEP 101986
Docket No. 50-424
License No. CPPR-108
,9eorgia Power Company
VATTN: Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
GentlemGn:
SUBJECT: NRC INSPECTION REPORT N0. 50-424/86-73
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
P. T. Burnett and A.' R. Long on August 18-22, 1986.
The inspection included a
review of activities authorized for your Vogtle facility.
At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
i
1
5
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/ encl:
(See page 2)
0609220004 e60910
ADOCK 05000424
G
l
\\
/
.
-
-
-
-
-
r
'
,
SEP 101986
Georgia Power Company
2
.
pc w/ encl:
,fJ.P.O'Reilly,SeniorVicePresident
fuclearOperations
\\ E. E. Conway, Senior Vice President &
Project Director
p.O. Foster,VicePresident, Project
Support
/#. D. Rice, Vice President, Project
Engineering
4. H. Pinson, Vice President, Project
Construction
M( T. Beckham, Vice President &
General Manager - Operations
(.R. A. Thomas, Vice President,
Licensing
N D. S. Read, General Manager,
, quality Assurance
CC. W. Hayes, Vogtle Quality
Assurance Manager
[X.C.Ramsey, Manager-
, Readiness Review
(C. B. Bockhold, General Manager,
Nuclear Operations
LA. Gucwa, Manager, Nuclear Safety
and Licensing
' M. H. Googe, Project
Construction Manager
/,Er D. Groover, Quality
Assurance Site Manager -
Construction
Lt. A. Bailey, Project Licensing
Manager
LGr F. Trowbridge, Esq. , Shaw,
Pittman, Potts and Trowbridge
/JrW. Churchill,Esq.,Shaw,
Pittman, Potts and Trowbridge
% L. Blake, Jr., Esq., Shaw,
Pittman, Potts and Trowbridge
\\J. E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
U( G. Ledbetter, Commissioner,
Department of Human Resources
C. H. Badger, Office of Planning
and Budget
t D( Kirkland, III, Counsel,
Office of the Consumer's Utility
G. Council
D
C. Teper, Georgians Against
Nuclear Energy
(cc w/enci cont'd - See page 3)
}
,
.
SEP 101986
'
'
Georgia Power Company
3
(cc w/enci - cont'd)
c E. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
1 Panel
9Dr.O.H. Paris,AdministrativeJudge
Atomic Safety and Licensing Board
_ Janel
W. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
. Panel
J. P. _ Garde, Citizens Clinic, Director
Government Accountability Project
bec w/ enc 1:
t. Reis, GS0
'
"W. M. Hill, IE
M. Miller, NRR
W. Brach, ED0
M. Sinkule, RII
E. Christnot, RII
NRC Resident Inspector
Document Control Desk
State of Georgia
l
'
l
(
ur
t:1b
e
)
%
09///86
09// /86 f/fg 09 y /86
i
Y
r
'ih Icc4
.
_-
-
_