ML20210D825

From kanterella
Jump to navigation Jump to search
Concludes That Measures Proposed in Util in Response to NRC Re Results of Visit Concerning Insp Repts 50-348/85-08 & 50-364/85-08 Appear Adequate to Correct Violation 3(B).Matter Resolved
ML20210D825
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/28/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
References
TAC-65285, TAC-65286, NUDOCS 8702100171
Download: ML20210D825 (2)


See also: IR 05000348/1985008

Text

Qg

.e"

JAN 2 81987

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

Alabama Power Company  ;

ATTN: Mr. R. P. Mcdonald

Senior Vice President

'

P. O. Box 2641

! Birmingham, AL 35291

!

Gentlemen:

SUBJECT: INSPECTION REPORT NOS. 50-348/85-08 AND 50-364/85-08

Reference is made to our letter of July 24, 1985, concerning our continuing

evaluation of your denial of Violation 3(B) which is documented in the above

referenced inspection report. Your denial, dated March 20, 1985, has been

extensively reviewed by my Safeguards staff in coordination with the NRC's

Division of Safeguards, Office of Nuclear Materials Safety and Safeguards (0NMSS)

,

and the Office of the Executive Legal Director (0 ELD). The violation warranted a

( further review by the ONMSS Regulatory Effectiveness Review (RER) team which

l visited your facility in February 1986. By letter dated August 28,1986, the

(- Office of Nuclear Reactor Regulation (0NRR) furnished you with the results of

l that visit. As stated in the ONRR letter, certain RER findings may constitute

j violations of your Physical Security Plan and were forwarded to the Regional

> Staff for resolution.

We have concluded that the measures you proposed in your October 13, 1986 letter

in response to the ONRR letter of August 28, 1986, appear adequate to correct

this violation; therefore, we consider the matter to be resolved.

Should you have any questions concerning this matter, please contact us.

Sincerely,

J. Nelson Grace

Regional Administrator

cc: W. O. Whitt, Executive Vice President

J. D. Woodard, General Manager -

Nuclear Plant

W. G. Hairston, III, General Manager -

Nuclear Support

J. W. McGowan, Manager-Safety Audit

and Engineering Review

J. K. 0sterholtz, Supervisor-Safety

Audit and Engineering Review

bcc: (See Page 2)

8702100171 870128

PDR ADOCK 05000348 -

G PDR _

_)__ W j

_-

.,.,. -"'

Alabama Power Company 2

JAN 281987 -

.

bcc: NRC Resident Inspector-

Document Control Desk

' State'of Alabama

-t

J

f

1

i

l

.

>

aa._.-

RII.

}

G s

01/yg/87

RII RII

Q

WTobin

If9 )line RII h

JStohr

RI RI

,

ir HDance DVerrell alker E

12/11/86 /89 g/ /g 01/13/87 01/ th/87 01/3 6/87 -010 b/ 01 L..