O NRC MONTHLY OPERATING REPORT

-\\

DOCKET NO.

50-206 UNIT NAME SONGS - 1 DATE March 13, 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 OPERATING STATUS ~

1. Unit-Name: San Onofre Nuclear Generating Station, Unit 1
2. Reporting Period:

February 1986

3. Licensed Thermal Power. (MWt):

1347

4. Nameplate Rating (Gross MWe):

456

5. Design Electrical Rating (Net MWe):

_436

6. Maximum Dependable Capacity (Gross MWe):

456

7. Maximum Dependable Capacity-(Net MWe):

436

8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted, If Any (Net MWe):

390

10. Reasons Fo-Restrictions, If Any:

Self-imposed power level limit to control steam generator tube corrosion.

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period i
12. Number Of Hours Reactor Was Critical.

672.00 1416.00 164,000.00 0.00 0.00 96,103.29

13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 0.00 0.00 92,371.77
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00 l
16. Gross Thermal Energy Generated (MWH) 0.00 0.00 117,310,227.05 l
17. Gross Electrical Energy Generated (MWH)-

0.00 0.00 39,829,634.00

18. Net Electrical Energy Generated (MWH)

(

852.00)

(2,092.00) 37,638,383.00

19. Unit Service Factor 0.00%

0.00%

56.32%

20. Unit Availability Factor 0.00%

0.00%

56.32%

r

21. Unit Capacity Factor (Using MDC Net) 0.00%

0.00%

52.64%

1

22. Unit Capacity Factor'(Using DER Net) 0.00%-

0.00%

52.64%

23. Unit-Forced Outage Rate 0.00%

0.00% __

21.12%

j~

24. Shutdowns Scheduled 0ver Next 6 Months (Type, Date, and Duration of Each):

Refueling, November 21, 1985, 170 day duration (now in progress).

i

25. If Shutdown At $nd 0f Report Period, Estimated Date of Startup:

May 1986

~

26. Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 7596u B603260493 e60228g6 DR ADOCK O

.,,.,.-,,.,r.~

,w....---,c

,,,e r * - - - -

-5 e

r *

,,.. n.

o.

AVERAGE DAILY UNIT: POWER LEVEL' 4

-DOCKET N0.

50-206-UNIT SONGS - 1 l

DATE March 13, 1986 COMPLETED BY

-E. R. Siacor

. TELEPHONE'

'(714) 368-6223 J

f MONTH: February 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0.00 17'

-0.00 2

0.00 18 0.00 3

0.00 19 0.00 4

0.00 20 0.00' f

l 5

0.00 21 0'.00 6

0.00 22 0.00~

7 0.00 23 0.00 l

8 0.00 24

-0.00 9

0.00 25 0.00' 10 0.00 26' 0.00 11-0.00

'27 0.00 12 0.00 28 0.00

-13 0.00 29 NA 14 0.00 30 '-

NA~

15 0.00 31 NA l

16 0.00-

.7596u b'

I

m, UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-206 UNIT NAME. SONGS - 1 REPORT MONTil FEBRUARY 1986 DA1 E Marnh 13, 1986 COMPLETED BY L.

H.

S i a co r TELEPil0NE (J14) 368-6223 Method of Shutting Down System Componont Cause & Correctivo 1

Du ra t ion 2

3 LER 4

4 Action to No.

Date Type

( flou rs )

Reason Reactor No.

Code Code Prevent Recurrence 93 851121 S

672 C

4 NA NA NA Refueling /Hackfit Work, 1

2 3

4 F-Fo rced Reason:

Method:

IEEE Std. 803-1983 S-Scheduled A-Equipment fa i lure ( Expla in) 1-Manual B-Ma intenance or Test 2-Manual Sc ra m.

'C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation from E-Operator Training Be License Examination Previous Month F-Adm i n i s t ra t i ve 5-Reduction of.20%

G-Ope ra t i ona l Error ( Expla in) or Creater in the H-Other (Explain)

Past 24 flours 6-Other (Expla in) 7596u

. ~-

1-

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET 50-206 UNIT SONGS - 1 DATE Mamh 1i. 1ons i

COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 DATE TIME EVENT i

February 1 0001 The Unit is in Mode 6,-day 71 of the refueling /backfit work outage.

February 12 0913 Entered Mode 5.

i February 28 2400 Unit is in Mode 5, day 98 of the refueling /backfit work outage.

i a

i l

t L

i i

4 -

i

...a P~

zt-REFUELING INFORMATION 2

DOCKET NO.

50 206

. UNIT SONGS - I' DATE March 13, 1986

~CCMPLETED BY E.~ R. Siacor TELEPHONE (714) 368-6223 MONTH:

February 1986

~ 1.

Scheduled date for next refueling shutdown.

March 1988 2.

Scheduled date for restart following refueling.

j June 1988 3.

Will refueling or' resumption of operation thereafter require a Technical Specification change or.other license amendment?

Not yet determined What will these be?

l Not yet determined 4.

Scheduled date for submitting proposed licensing action and supporting information.

Not yet determined l

5.

Important Licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis j

methods, significant changes in fuel' design, new operating procedures.

Not yet determined 6.

The number of fuel assemblies, a)' In the core.

157 b) In_the spent fuel storage pool.

146-7.

Licensed spent' fuel: storage capacity. 216 Intended change in spent fuel storage _ capacity. NONE~

- 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

March 1988 7596u m-r e

.~

w-m

fD Southem Califomia Edison Company SAN ONOFRE NUCLEAR GENERATING STATION P. O. BOX 128 SAN CLEMENTE CALWORNIA 92672 H.E. MORGAN TELEPHONE-sr r.on....c'"

March 13, 1986 Director Office of Resource Management

.U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Subject:

. Docket No. 50-206 Monthly Operating Report for February 1986 San Onofre Nuclear Generating Station, Unit 1 Enclosed is the Monthly Operating Report as required by Section'6.9.1.10 of Appendix A, Technical Specifications to Provisional Operating License DPR-13 for San Onofre Nuclear Generating Station, Unit 1.

Please contact us if we can be of further assistance.

Sincerely, MbM Enclosures cc:

J. B. Martin (Regional Administrator, USNRC Region V)

F. R. Huey (USNRC Senior Resident Inspector, Units 1, 2 and 3)

INP0 Records Center

. Y/