O NRC MONTHLY OPERATING REPORT
-\\
DOCKET NO.
50-206 UNIT NAME SONGS - 1 DATE March 13, 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 OPERATING STATUS ~
- 1. Unit-Name: San Onofre Nuclear Generating Station, Unit 1
- 2. Reporting Period:
February 1986
- 3. Licensed Thermal Power. (MWt):
1347
- 4. Nameplate Rating (Gross MWe):
456
- 5. Design Electrical Rating (Net MWe):
_436
- 6. Maximum Dependable Capacity (Gross MWe):
456
- 7. Maximum Dependable Capacity-(Net MWe):
436
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA
- 9. Power Level To Which Restricted, If Any (Net MWe):
390
- 10. Reasons Fo-Restrictions, If Any:
Self-imposed power level limit to control steam generator tube corrosion.
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period i
- 12. Number Of Hours Reactor Was Critical.
672.00 1416.00 164,000.00 0.00 0.00 96,103.29
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 0.00 0.00 92,371.77
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00 l
- 16. Gross Thermal Energy Generated (MWH) 0.00 0.00 117,310,227.05 l
- 17. Gross Electrical Energy Generated (MWH)-
0.00 0.00 39,829,634.00
- 18. Net Electrical Energy Generated (MWH)
(
852.00)
(2,092.00) 37,638,383.00
- 19. Unit Service Factor 0.00%
0.00%
56.32%
- 20. Unit Availability Factor 0.00%
0.00%
56.32%
r
- 21. Unit Capacity Factor (Using MDC Net) 0.00%
0.00%
52.64%
1
- 22. Unit Capacity Factor'(Using DER Net) 0.00%-
0.00%
52.64%
- 23. Unit-Forced Outage Rate 0.00%
0.00% __
21.12%
j~
- 24. Shutdowns Scheduled 0ver Next 6 Months (Type, Date, and Duration of Each):
Refueling, November 21, 1985, 170 day duration (now in progress).
i
- 25. If Shutdown At $nd 0f Report Period, Estimated Date of Startup:
May 1986
~
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 7596u B603260493 e60228g6 DR ADOCK O
.,,.,.-,,.,r.~
,w....---,c
,,,e r * - - - -
-5 e
r *
,,.. n.
- o.
AVERAGE DAILY UNIT: POWER LEVEL' 4
-DOCKET N0.
50-206-UNIT SONGS - 1 l
DATE March 13, 1986 COMPLETED BY
-E. R. Siacor
. TELEPHONE'
'(714) 368-6223 J
f MONTH: February 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0.00 17'
-0.00 2
0.00 18 0.00 3
0.00 19 0.00 4
0.00 20 0.00' f
l 5
0.00 21 0'.00 6
0.00 22 0.00~
7 0.00 23 0.00 l
8 0.00 24
-0.00 9
0.00 25 0.00' 10 0.00 26' 0.00 11-0.00
'27 0.00 12 0.00 28 0.00
-13 0.00 29 NA 14 0.00 30 '-
NA~
15 0.00 31 NA l
16 0.00-
.7596u b'
I
m, UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-206 UNIT NAME. SONGS - 1 REPORT MONTil FEBRUARY 1986 DA1 E Marnh 13, 1986 COMPLETED BY L.
H.
S i a co r TELEPil0NE (J14) 368-6223 Method of Shutting Down System Componont Cause & Correctivo 1
Du ra t ion 2
3 LER 4
4 Action to No.
Date Type
( flou rs )
Reason Reactor No.
Code Code Prevent Recurrence 93 851121 S
672 C
4 NA NA NA Refueling /Hackfit Work, 1
2 3
4 F-Fo rced Reason:
Method:
IEEE Std. 803-1983 S-Scheduled A-Equipment fa i lure ( Expla in) 1-Manual B-Ma intenance or Test 2-Manual Sc ra m.
'C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Continuation from E-Operator Training Be License Examination Previous Month F-Adm i n i s t ra t i ve 5-Reduction of.20%
G-Ope ra t i ona l Error ( Expla in) or Creater in the H-Other (Explain)
Past 24 flours 6-Other (Expla in) 7596u
. ~-
1-
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET 50-206 UNIT SONGS - 1 DATE Mamh 1i. 1ons i
COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 DATE TIME EVENT i
February 1 0001 The Unit is in Mode 6,-day 71 of the refueling /backfit work outage.
February 12 0913 Entered Mode 5.
i February 28 2400 Unit is in Mode 5, day 98 of the refueling /backfit work outage.
i a
i l
t L
i i
4 -
i
...a P~
zt-REFUELING INFORMATION 2
DOCKET NO.
50 206
. UNIT SONGS - I' DATE March 13, 1986
~CCMPLETED BY E.~ R. Siacor TELEPHONE (714) 368-6223 MONTH:
February 1986
~ 1.
Scheduled date for next refueling shutdown.
March 1988 2.
Scheduled date for restart following refueling.
j June 1988 3.
Will refueling or' resumption of operation thereafter require a Technical Specification change or.other license amendment?
Not yet determined What will these be?
l Not yet determined 4.
Scheduled date for submitting proposed licensing action and supporting information.
Not yet determined l
5.
Important Licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis j
methods, significant changes in fuel' design, new operating procedures.
Not yet determined 6.
The number of fuel assemblies, a)' In the core.
157 b) In_the spent fuel storage pool.
146-7.
Licensed spent' fuel: storage capacity. 216 Intended change in spent fuel storage _ capacity. NONE~
- 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
March 1988 7596u m-r e
.~
w-m
fD Southem Califomia Edison Company SAN ONOFRE NUCLEAR GENERATING STATION P. O. BOX 128 SAN CLEMENTE CALWORNIA 92672 H.E. MORGAN TELEPHONE-sr r.on....c'"
March 13, 1986 Director Office of Resource Management
.U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
Subject:
. Docket No. 50-206 Monthly Operating Report for February 1986 San Onofre Nuclear Generating Station, Unit 1 Enclosed is the Monthly Operating Report as required by Section'6.9.1.10 of Appendix A, Technical Specifications to Provisional Operating License DPR-13 for San Onofre Nuclear Generating Station, Unit 1.
Please contact us if we can be of further assistance.
Sincerely, MbM Enclosures cc:
J. B. Martin (Regional Administrator, USNRC Region V)
F. R. Huey (USNRC Senior Resident Inspector, Units 1, 2 and 3)
INP0 Records Center