Text

_

e t,..

.q

' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-3S4 UNIT Hope Creek Gen. Station DATE 09/11/86 COMPLETED BY Mike Phillips TELEPHONE 609-339-3738 MONTH August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 88.5 2

0 18 84 3

0 19 43 4

0 2g 22.3 5

0 21 27.5 6

0 22 60.3 0

7 23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 7.6 29 0

14 81.7 3g 0

l 15 88 31 0

16 83.3 Oi

'yd t\\ \\\\

8609190285 860331 l

PDR ADOCK 05000354 R

PDR l

    • h OPERATING DATA REPORT DOCKET NO.

50-354 UNITHODe Creek Gen. Station DATE 09/11/86--

COMPLETED BY Mike Phillipg___

TELEPHONE 609-339-3738 OPERATING STATUS l.

REPORTING PERIOD Aug. 86 GROSS HOURS IN REPORTING PERIdD 744 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt) 3293-MAX. DEPEND. CAPACITY (MWe-Net)_____1067_____

DESIGN ELECTRICAL RATING (MWe-Net) 1_0 6 7_ _ _ _ _ _

None 3

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net) 4.

REASONS FOR RESTRICTION (IF ANY)

THIS YR TO MONTH DATE CUMULATIVE 5.

NO. OF HOURS REACTOR WAS CRITICAL 303.9 936.4 936.4 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 0

1 7.

HOURS GENERATOR ON LINE' 183._4 183.4 183_.4_

8.

UNIT RESERVE SHUTDOWN HOURS 0

_0 0

9.

GROSS THERMAL ENERGY GENERATED (MWH) 128,340 128,340 128,340

19. GROSS ELECTRICAL ENERGY GENERATED (MWH) 20590 20590 20590
11. NET ELECTRICAL ENERGY GENERATED (MWH) 2587_

2587 2587

12. REACTOR SERVICE FACTOR i
13. REACTOR AVAILABILITY FACTOR 4
14. UNIT SERVICE FACTOR
15. UNIT AVAILABILITY FACTOR
16. UNIT CAPACITY FACTOR (Using Design MDC)
17. UNIT CAPACITY FACTOR (Using Design MWe) i
18. UNIT FORCED OUTAGE DATE
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION) :
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

4 9/1/86

[

21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) :

FORECAST ACHIEVED INITIAL CRITICALITY

,6/2_8/86 j

INITIAL ELECTRICITY 8/1/86 COMMERCIAL OPERATION

_11/24/M

OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-354 UNIT NAME Hope Creek Gen. Station DATE September 11, 1986 COMPLETED BY Mike 9hillips August TELEPHONE (609) 339-3738 REPORT MONTH METHOD OF SHUTTING DOWN THE TYPE REACTOR OR F FORCED DURATION-REASON REDUCING CORRECTIVE ACTION /

NO.

DATE S SCHEDULED (HOURS)

(1)

POWER (2)

COMMENTS 1

8/l S

149.75 B

1 Planned outage for drywell work 2

8/8 F

84 A

1 Inoperable torus Vacuum breakers.

Reactor shutdown required by Tech Specs.

i 3

8/22 S

204.25 B

2 Shutdown from Out-side the Control Room (Power Ascen-sion Test).

Nine I

day outage to I

inspect Bailey Logic Cards.

l 4

8/31 F

18.5 A

3 Automatic Scram on l

Reactor low water I

level.

I

SUMMARY

l l

~

HOPE CREEK GENERATING STATION MONTHLY OPERATING

SUMMARY

August 1986 On August 1, 1986, the main generator was sychronized to the grid for the first time and the unit operated at 27MWe for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> before being taken off the line in support of a scheduled shutdown.

On August 8, 1986, a design problem was discovered with the Reactor Building to Torus Vacuum breakers which rendered the components inoperable and resulted in a unit shutdown.

After an extensive review and implementation of corrective action, the unit was

(

restarted on August 12, 1986.

The Shutdown from Outside the Con-trol Room test to hot shutdown was successfully completed on 3

August 22, 1986.

A continuation of the test to cold shutdown was not successful because of a stuck open Safety Relief Valve which occurred late in the test.

The later portion of the procedure will be rerun at a future date.

The unit remained in COLD SHUTDOWN after the test for approximately the remainder of the month for an inspection of Bailey Alarm Modules.

4

SCHEDULED SHUTDOWNS (ITEM 19)

TYPE DATE DURATION 1.

LOP Test - Scram See below 3 days 2.

MSIV Isolation - Scram 11/12/86 2 days 3.

Load Rejection - Scram 11/17/86 4.5 days The Lop test was initially'run on 09/11/86 but various equipment problems resulted in the test being aborted. The new date for the test is currently under review by station management.

[

OPSEG Public Service Electnc and Gas Company P.O. Box L Hancocks Bridge, New Jersey 08038 Hope Creek Operations September 11, 1986 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION UNIT 1 DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for August are being forwarded to you.

Sincerely yours, feh'Wb%

R. S. Salvesen General Manager Hope Creek Operations WJM: bas Distribution CC Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Enclosures b

The Energy People xam)l l,s

- - _