ML20210D623

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/86-32 on 861116-1231 & Notice of Violation
ML20210D623
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/23/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20210D627 List:
References
NUDOCS 8702100129
Download: ML20210D623 (2)


See also: IR 05000267/1986032

Text

_.

_ ,

,

r

,

.In Reply Refer To:

.

-

-

Docket: 50-267/86-32.

m 23 g

Public' Service Company of Colorado

ATTN:

R. O. Williams, Jr.

Vice President, Nuclear

Operations

P. O. Box 840

Denver, Colorado

80201

Gentlemen:

This refers to the inspection conducted by Messrs R. E. Farrell and

P. W. Michaud of this office during the period November 16 through

December 31, 1986, of activities authorized by NRC Operating License DPR-34

for Fort St. Vrain Nuclear Generating Station, and to the discussion of our

findings with you and members of your staff at the conclusion of the inspection.

Areas examined during the inspection included operational safety verification,

licensee action on previous identified inspection findings.. licensee action on

licensee event reports (LERs), maintenance, surveillances, reserve shutdown

system, quality assurance, and security. Within these areas, the inspection

consisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the NRC inspectors. The

inspection findings are documented in the_ enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response..should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

-identified inspection findings. The status of these items is identified in

paragraph 3 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management-and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

n-

(

i

s

!

RIV,RPB)/A .R B/A;

/t

~

yG/ ~

1

C: PB/A

[' I:

PB

4/-

'.

ichuad

R Farrell

JP audon

J

JEGa311ardo

l

(

/87

,] /)?/87

l /2b/87

y

t/)p/87

i

\\

8702100129 870123

PDR

ADOCK 05000267

%

,

a

von

I

.

,

, .

Public Service Company of Colorado

-2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

.-,

1 1,f a

j ;,

.L"

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-267/86-32

a

cc w/ enclosures:

J. W. Gahm, Manager, Nuclear

Production Division

'

Fort St. Vrain Nuclear Generating Station

16805 WCR 19 1/2

Platteville, Colorado

80651

P. Tomlinson, Manager, Quality

'

Assurance Division

(SameAddress)

Colorado Radiation Control Program Director

. bec distrib. by RIV:

  • RPB

R. D. Martin, RA

  • Resident Inspector

DRSP

  • Section Chief (RPB/A)
  • RIV File
  • SectionChief(RSB/ES)
  • R&SPB
  • RSTS OPERATOR
  • MIS System

s

  • RSB

M. Emerson, AC

Public Utilities Comission

Enforcement Officer

  • Project Inspector
  • w/766

__ _