Text
_.
_ ,
,
r
,
.In Reply Refer To:
.
-
-
Docket: 50-267/86-32.
m 23 g
Public' Service Company of Colorado
ATTN:
R. O. Williams, Jr.
Vice President, Nuclear
Operations
P. O. Box 840
Denver, Colorado
80201
Gentlemen:
This refers to the inspection conducted by Messrs R. E. Farrell and
P. W. Michaud of this office during the period November 16 through
December 31, 1986, of activities authorized by NRC Operating License DPR-34
for Fort St. Vrain Nuclear Generating Station, and to the discussion of our
findings with you and members of your staff at the conclusion of the inspection.
Areas examined during the inspection included operational safety verification,
licensee action on previous identified inspection findings.. licensee action on
licensee event reports (LERs), maintenance, surveillances, reserve shutdown
system, quality assurance, and security. Within these areas, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the NRC inspectors. The
inspection findings are documented in the_ enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response..should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
-identified inspection findings. The status of these items is identified in
paragraph 3 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management-and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
n-
(
i
s
!
RIV,RPB)/A .R B/A;
/t
~
yG/ ~
1
C: PB/A
[' I:
PB
4/-
'.
ichuad
R Farrell
JP audon
J
JEGa311ardo
l
(
/87
,] /)?/87
l /2b/87
y
t/)p/87
i
\\
8702100129 870123
ADOCK 05000267
%
,
a
von
I
.
,
, .
Public Service Company of Colorado
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
.-,
- 1 1,f a
j ;,
.L"
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-267/86-32
a
cc w/ enclosures:
J. W. Gahm, Manager, Nuclear
Production Division
'
Fort St. Vrain Nuclear Generating Station
16805 WCR 19 1/2
Platteville, Colorado
80651
P. Tomlinson, Manager, Quality
'
Assurance Division
(SameAddress)
Colorado Radiation Control Program Director
. bec distrib. by RIV:
- RPB
R. D. Martin, RA
- Resident Inspector
DRSP
- Section Chief (RPB/A)
- RIV File
- SectionChief(RSB/ES)
- R&SPB
- RSTS OPERATOR
- MIS System
s
- RSB
M. Emerson, AC
Public Utilities Comission
Enforcement Officer
- Project Inspector
- w/766
__ _