ML20210D576
| ML20210D576 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 01/29/1987 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | James O'Reilly GEORGIA POWER CO. |
| Shared Package | |
| ML20210D580 | List: |
| References | |
| NUDOCS 8702100117 | |
| Download: ML20210D576 (3) | |
See also: IR 05000424/1987004
Text
yf
a
,
/
-
,
JAN 2 919g7
Docket Nos. 50-424, 50-425
License Nos. CPPR-108, CPPR-109
Georgia Power Company
vATTN: Mr. James P. O'Reilly
Senior Vice President-Nuclear
Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-424/87-04 AND 50-425/87-04
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
R. W. Newsome on January 5 - 9, 1987.
The inspection included a review of
activities authorized for your Vogtle facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
-
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
I
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
t
t
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
,
Enclosure:
l
l
NRC Inspection Report
i
cc:
(See page 2)
l
l
8702100117 870129
ADOCK 05000424
GD\\
Ill
s
JAN 2 91987
-
Georgia Power Company
2
cc w/ encl:
M. E. Conway, Senior Vice President &
Project Director
'M Whitney, General Manager Project
Support
/ D. Rice, Vice President, Project
Engineering
g. H. Pinson, Vice President, Project
Construction
d W. Hayes, Vogtle Quality
fssuranceManager
W. B. Bockhold, General Manager,
Nuclear Operations
d4 Gucwa, Manager, Nuclear Safety
and Licensing
(K. H. Googe, Project
Construction Manager
/ A. Bailey, Project Licensing
Manager
S V F. Trowbridge, Esq., Shaw,
Pittman, Potts and Trowbridge
L8', W. Churchill, Esq. , Shaw,
W.fittman,PottsandTrowbridge
E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
d G. Ledbetter, Commissioner,
Jepartment of Human Resources
W. H. Badger, Office of Planning
and Budget
W ,. Kirkland, III, Counsel,
Office of the Consumer's Utility
Jouncil
E. Feig, Georgians Against
Nuclear Energy
(W.' B. Margulies, Esq. , Chairman,
Atomic Safety and Licensing Board
Panel
(Df . O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
fanel
IG'. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
bec:
(See page 3)
'-
JAN 2 919g7
,
Georgia Power Company
3
bgc w/ encl:
vE. Reis, OGC
W. M. Hill, IE
f(. Miller, NRR
Brach, EDO
()(f.Sinkule,RII
. Christnot, RII
A C Resident Inspector
Document Control Desk
State of Georgia
4
kb
fik 4'< li
tt
/97
h)
-1/
"%
[g
gw/87
,J7/87
1/Q87
some:es
lake
ARherdt
t
'
l