h))lb Mumur Dravo January 30, 1987 James G. Keppler, Director, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Glen Elly, IL 60137 Gentlemen:
In accordance with requirements of Dravo Corporation's Pipe Fabrication Division Quality Assurance procedures, we wish to report components fabricated and shipped by Dravo which were not in accordance with the code of record under which they were fabricated.
The following describes the circumstances, the evaluation, and the action being taken to correct the components:
1.
On January 15, 1987 it was discovered by Dravo that pipe spools had been shipped to the South Texas Project without magnetic particle or liquid penetrant inspection performed on the 4"
and under butt welds.
These pipe spools were to be fabricated as Class 3 to the ASME III 1974 Edition Winter 1975 Addenda of the code.
The Summer 1975 Addenda added the requirement to magnetic particle or liquid penetrant examine 4"
and under butt welds.
2.
A nonconformance was generated and an investigation begun to determine the extent of this problem.
It was determined that 53 pipe spools had been shipped with this nonconforming condition.
The shipments were made between September and December 1986.
3.
Our customer, Bechtel Energy Corporation, was promptly notified on January 16, 1987 by telephone by our Quality Assurance Manager.
4.
Our General Manager was informed of the nonconformance and that it was under evaluation.
5.
A follow-up letter was written to Bechtel Energy Corporation, South Texas Project, on Janauary 20, 1987 (attached) requesting their help to determine if this should be reported under 10CFR Part 21.
8702100077 870130 4g PDR ADOCK 05000498 pfg A
PDR g\\
PIPE FABRICATION DIVISION DR AVO CORPOR ATION 1115 GILM AN STREET M ARIETTA, OH 45750 614 373;7541 JN<l
tmm Dravo 6.
It was determined that 14 of these pipe spools were installed at the South Texas Project and the remainder (39) were in a lay down area.
Arrangements were made to magnetic particle or liquid penetrant the butt welds at South Texas Project on the 14 installed spools and this has been completed.
The remaining 39 are to be returned to Dravo for the required examination.
7.
An investigation followed to determine if a similar condition existed on any nuclear projects in house or shipped during 1986.
This investigation proved negative.
Dravo has not had an answer to our request for evaluation from Bechtel to date but have consulted with Bob Wielgoszinski of Kemper in Chicago.
Both Dravo and Kemper believe this non-conformance described above does not constitute a " substantial safety hazard" reportable under 10CFR21 since this examination was not required on Class 3 systems prior to the Summer 1975 Addenda.
If you require further information regarding this, please contact the writer.
Very truly yours, DRAVO CORPORATION Pipe Fabrication Division i
R.
D. Abele Manager, Technical Services RDA/wlb Attachment
a muur Dravo January 20, 1987 Bechtel Energy Corporation Letter No. ST-YB-9I-57 South Texas Project P. O. Box 2166 Houston, TX 77252 Attention:
Dale Haruglum
Reference:
P. O. 14926-6502 Gentlemen:
This contract specified fabrication was to be to the 1974 Edition thru Winter 1975 Addenda of the ASME Section III Code.
We have just discovered that our sketches did not specify magnetic parr.icle or liquid penetrant examination for 2-1/2" thru 4" butt welds which was added to the ASME III Code in the Summer 1975 Addenda for Class 3 piping.
The branch welds, however, in every case were magnetic particle or liquid penetrant inspected.
We have identified fifty-three fabricated pipe spools which have been shipped to the jobsite that require this additional NDE c n the butt welds only.
We cannot determine at this time if this is reportable under 10CFR Part 21. Therefore, we need to know the status of these spools and your help to determine if this should be reported under 10CFR Part 21.
Yours very truly, DRAVO CORPORATION Pipe Fabrication Division liitig M
E. G. Reno Manager, Quality Assurance EGR/wlb cc:
J.
Lobby - Bechtel M. Wootton - Dravo Luther Seals - Bechtel G. Gardner - Dravo L. Evans - Dravo R. Abele - Dravo ANI - Kemper File PlPE FABRICATION OlVillON OR AVO CORPOR ATION 1115 GILM AN STAEET M ARIETTA. OH 45750 6f4 3 ' 3. ' 5 4 '
P R O C UC T I O N R EP Q R T E
3664 Jan 19 1987 Page 1
Sk Status Piecesack Spec Site Weight liev Shop Squared Shipped Nuecer 1
Shipped CC-2230-WA3-8 CS 3 19 1 1
07/28/86 10/30/86 6 2
Shipped CC-2421-WA3-H CS ~ 3 12 1 1
07/24/86 09/08/86 2 3
Shipped CC-2422-WA3-G CS 4 13 1 1
07/28/86 09/08/86 2 5
Shipped CC-2475-WA3-C CS 3 102 1 1
09/08/86 2 6
Shipped CC-2493-WA3-A CS 3 48 2 1
07/31/86 C9/C8/86 2 7
Shipped CC-2503-CA3-AA CS 3 21 1 1
07/28/86 09/08/86 2 8
Shipped CC-2645-WA3-A CS &
31 1
1 07/30/86 09/08/86 2 9
Shipped CV-2014-KB3-AA SS 4 66 2 3
09/29/86 10/07/86 5 11 Shipped CV-2014-KB3-CC SS 4 101 2 3
11/13/86 12/17/86 7 12 Shipped CV-2021-P83-88 SS &
64 1 3
09/24/86 10/07/86 5 17 Shipped CH-2102-WA3-C CS 3 17 1 1
07/28/86 09/08/86 2 19 Shipped CH-2272-WA3-0 CS 4 17 1 1
08/06/86 10/07/86 5 21 Shipped CH-2343-WA3-E CS 4 17 1 1
08/06/86 09/08/86 2 22 Shissed CH-2347-WA3-A CS 3 41 1 1
08/18/!6 09/08/86 2 26 Shipped CH-2443-WA3-A CS 3 63 1 1
09/22/86 10/01/86 4 25 Shipped CH-2444-WA3-A CS 3 27 1 1
08/14/86 10/01/86 6 26 Shipped CH-2445-WA3-A CS 3 63 1 1
09/22/86 10/01/86 4 27 Shipped CH-2446-WA3-A CS 3 27 1 1
08/13/86 09/08/86 2 28 Shipped CH-2447-WA3-A CS 3 63 1 1
09/22/86 10/01/86 &
36 Shipped V-2007-GA3-KA CS &
110 1 1
12/15/86 12/18/86 8 37 Shipped AF2007-GA3-NA C5 2 34 1 1
10/21/86 10/30/86 6 40 Shipoed AF2009-GA3-KA CS &
115 1 1
12/15/86 12/18/86 8 43 Shipped AF-2009-GA3-NA CS &
216 1 1
10/21/86 10/30/86 6 Shipped AF-2009-GA3-FA CS &
218 1 1
10/21/86 10/30/86 6 47 Shipped AF-2011-GA3-KA CS 4 112 1 1
12/15/86 12/18/86 8 49 Shipped AF-2011-GA3-MA CS &
52 1 1
12/15/86 12/18/86 8 50 Shioped AF-2011-GA3-NA CS &
103 1 1
1C/21/86 10/30/86 6
P R O O U C T I O N R EP O R T E - 3664 Jan 19, 1987 Page 2
Sk Status Piecesack Spec Sire Weight Rev Shop Squared Shipped Number 51 Shipped AF-2013-GA3-F CS 4 157 1 1
12/15/86 12/18/86 8 52 Shipped AF-2013-GA3-G CS &
40 1 1
10/15/86 10/30/86 6 53 Shipped AF-2014-GA3-F CS &
75 1 1
12/15/86 12/18/86 8 54 Shipped AF-2014-GA3-G CS 4 40 1 1
10/15/86 10/30/86 6 57 Shipped AF-2047-GA3-H CS 4 190 1 1
10/06/86 10/30/86 6 59 Shipped AF-2047-GA3-K CS &
190 1 1
10/06/86 10/30/86 6 60 Shipped AF-2047-GA3-L CS &
121 1 1
10/15/86 10/30/86 6 61 Shipped AF-2047-GA3-M CS 4 282 1 1
10/21/86 10/30/86 6 62 Shipped AF-2047-GA3-N CS 4 154 1 1
10/21/86 10/30/86 6 63 Shipped AF-2047-GA3-P CS &
178 1 1
10/15/86 10/30/86 6 64 Shipped AF-2047-GA3-G CS 4 40 1 1
12/15/86 12/18/86 8 73 Shipped CC-2484CA3-G CS 3 64 1 1
10/20/86 10/30/86 6 74 Shipped CC-2484-CA3-H CS 3 59 1 1
10/30/86 6 75 Shipped CC-2496-CA3-E CS 3 64 1 1
10/14/86 10/30/86 6 76 Shipped CC-2496-CA3-F CS 3 59 1 1
10/02/86 10/30/86 6 77 Shipped CC-2507-WA3-A CS 3 22 1 1
08/14/86 09/08/86 2 78 Shipped CC-2508-CA3-H CS 3 64 1 1
10/14/86 10/30/86 6 79 Shipped CC-2508-CA3-J CS 3 63 1 1
10/02/86 10/30/86 6 80 Shipped CC-2520-CA3-0 CS 3 64 1 1
10/14/86 10/30/86 6 81 Shipped CC-2521-CA3-E CS 3 63 1 1
10/02/86 10/30/86 6 93 Shipped CH-2208-WA3-P CS 4 23 1 1
08/06/86 09/C8/86 2 95 Shipped CH-2308-WA3-P CS &
23 1 1
C8/06/86 09/08/86 2 96 Shipped CH-2442-WA3-A CS 3 26 1 1
08/13/86 C9/08/86 2 98 Shipped CV-2015-P83-KK SS 4 121 1
3 10/01/86 10/30/86 6 103 Shipped CH-2199-WA3-0 SS 4 28 0 1
12/15/86 12/18/86 8 212 Shipped CC-2422-WA3-F CS 3 14 0 1
12/09/86 12/18/96 S