ML20210D184
| ML20210D184 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 02/04/1987 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20210D187 | List: |
| References | |
| NUDOCS 8702100031 | |
| Download: ML20210D184 (2) | |
See also: IR 05000456/1986061
Text
o
.
FEB 041987
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. J. M. Jacobson
and D. E. Jones of this office on November 20, 25, 26; December 10, 12, 17,
18, 30, 31, 1986, and January 7, 8, 14, 29, 1987, of activities at the Braidwood
Station, Units 1 and 2, authorized by NRC Operating License No. NPF-59 and
Construction Permit No. CPPR-133 and to the discussion of our findings with
Mr. C. W. Schroeder and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined dering
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance wP
10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
10Eiginal. Sicned by J J. nurisen
~~
J. J. Harrison, Chief
Engineering Branch
Enclosure:
Inspection Reports
No. 50-456/86061(DRS); and
No. 50-457/86045(DRS)
See Attached Distribution
,
!
V
0G%
. f
hlI
III
R
i
A
f4y
RII
hIg
'
/
'acobson/nma
anielson
Weil
Lit e
Ha ri on
e 9
,p n
n
m.n
-n
8702100031 870204
l
ADOCK 05000456
[dC /
G
,
.
Commonwealth Edison Company
2
FEB 041987
Distribution
cc w/ enclosure:
'
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
E. E. Fitzpatrick, Station
Superintendent
P. L. Barnes, Regulatory
Assurance Supervisor
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr., Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, 0GC
J. Moore, OGC
G. Berry, OGC
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
,