ML20210D069
| ML20210D069 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 01/28/1987 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | James O'Reilly GEORGIA POWER CO. |
| Shared Package | |
| ML20210D074 | List: |
| References | |
| NUDOCS 8702100013 | |
| Download: ML20210D069 (3) | |
See also: IR 05000424/1986050
Text
fw
4
JAN 2 g ggg7
.
Docket No. 50-424
License No. CPPR-108
G orgia Power Company
TTN: Mr. J. P. O'Reilly,
Senior Vice President,
Nuclear Operations
P.O. Box 4545
-
Atlanta, GA 30302
,
Gentlemen:
SUBJECT: NRC REVIEW OF V0GTLE READINESS REVIEW APPENDIX J, EQUIPMENT
i
'
QUALIFICATION - REPORT NO. 50-424/86-50
The NRO has completed a detailed review, inspection, and verification of the
subject Appendix which you submitted to the NRC on March 24, 1986.
Two
inspections were conducted at the Vogtle site and the resultant findings were
discussed with members of your staff at the conclusion of these inspections.
Areas contained in the Appendix, which were reviewed, examined, and verified, are
identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, observations of activities in progress, and
review of your licensing commitments.
The concerns that developed from the reviews and inspections of Appendix J are
summarized as one unresolved item and three inspector followup items.
Your
attention is invited to these matters which will be pursued during future
licensing reviews and inspections.
Based upon the NRC review and inspection of those activities identified in the
module, we have determined that the applicant's programs for ensuring proper
,
equipment qualification at Vogtle Unit No. I are acceptable and comply with
i
applicable regulatory requirements.
This decision is based on information
i
'
currently available to the inspectors and reviewers.
Should information
subsequently become available which was not considered during this review or
which conflicts with earlier information, it will be evaluated to determine what
effect it may have on the above conclusion.
Should you have any questions concerning this letter, please contact us.
Sincerely,
8702100 h h $O
i
424
o
J. Nelson Grace
Regional Administrator
Enclosure:
(See page 2)
MOlm
JAH 2 81987
s
.
Georgia Power Company
2
Enclosure:
NRC Inspection Report
cg w/ encl:
6K E. Conway, Senior Vice President &
Project Director
(P' D. Rice, Vice President, Project
Engineering
LR'. H. Pinson, Vice President, Project
Construction
(<' W. Hayes, Vogtle Quality
Assurance Manager
W. C. Ramsey, Manager -
Jeadiness Review
W. B. Bockhold, General Manager,
Nuclear Operations
M Gucwa, Manager, Nuclear Safety
and Licensing
LP A. Bailey, Project Licensing
Manager
A. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
t# E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
wT. G. Ledbetter, Commissioner,
Department of Human Resources
(4'. H. Badger, Office of Planning
and Budget
[p' Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
y Feig, Georgians Against
Nuclear Energy
I B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
Janel
Wr. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
Panel
tf>c A. Linenberger, Jr. , Administrative Judge
Atomic Safety and Licensing Board
Panel
bec w/ encl:
(see page 3)
'
JAN 3 5 WBI
.
Georgia Power Company
3
bec w/ encl:
LF. Reis, GSO
- M. Hill, IE
f
tM Miller, NRR
Brach, GS0
Sinkule, RII
. Christnot, RII
WRC Resident Inspector
Document Control Desk
State of Georgia
.-
elg
MHun[tsjpp{
+
TEConlon
ARHerdt
dnciera
-MSinktria
Ic / /86
j0/>/86
Of/l(t/s6
09/
09/3V86
top /g
1
9,
(b
RII
yy
g
R 'lker
TNovak
BGri es
EChristenbury
i b3jgr)
I"l,86
.[(/p
f
/
/
p6
So
tips'
/ ,y '
1
Sa