Forwards Readiness Review Program Module 22 Independent Design Review Insp Rept 50-424/86-128 on 850415-861009. Design Process Acceptable W/Conditional Acceptance of One Item Re safety-related Electrical Cables
ML20210C955
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 01/09/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20210C958 List:
References
NUDOCS 8702090486
Download: ML20210C955 (3)


See also: IR 05000424/1986128

Text

-

--.

-

\\

wwe

.

.

.

JAN 0 91987

Docket No. 50-424

License No. CPPR-108

Gporgia Power Company

MTTN: Mr. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302.

Gentlemen:

SUBJECT: NRC REVIEW 0F V0GTLE, UNIT 1 READINESS REVIEW MODULE NO. 22,

INDEPENDENT DESIGN REVIEW (IDR) - REPORT N0. 50-424/86-128

'The NRC has completed a detailed review, inspection, and verification of the

subject module.

Technical inspections were conducted at the Vogtle site, IDR

reviewer offices in Boston, MA, and Architect / Engineer offices in Los Angeles,

CA.

The resultant findings were discussed with members of your staff at the

conclusion of these inspections.

These inspections monitored the conduct of the

IDR from preparation of review plans, through review plan implementation and

concluded with inspections of the resolution of observations including

implementation of corrective / preventative actions.

The NRC's conclusion

regarding Module 22 acceptability includes the independent design review

conclusions associated with the civil / structural modules, viz., Mndule 1

(Reinforced Concrete Structures), Module 8 (Structural Steel) and Module 13

(Foundations and Backfill, Coatings and Post Tensioning).

The results of Module 22 reviews and inspections are summarized into the

categories of acceptable, conditionally acceptable, and/or unacceptable.

Your

attention is invited to these matters which will be pursued during future

licensing reviews and inspections.

Based on the NRC review and inspection of those activities identified in the

module, we have determined that the design process at Vogtle, Unit 1 is acceptable

and complies with applicable regulatory requirements. One item was identified as

conditionally acceptable. Georgia Power's Readiness Review Program IDR observation

22-F11, identified that safety-related electrical cables in vertical trays may

not be adequately supported. After review of preliminary supporting documentation

provided by the architect-engineer, the IE inspection team concluded that the

intent of General Design Criteria 2 may not have been met. This issue has been

referred to NRR for subsequent resolution. This decision was based on information

currently available to the inspectors and reviewers.

Should information subsequently become available which was not considered during

this review or which conflicts with earlier information, it will be evaluated to

determine what effects it may have on the above conclusion.

,

m"Te MHP

'

G

.reat

-

<

.

.

Georgia Power Company

2

JAN 0 91987

Please contact us should you have any questions concerning this letter.

Sincerely,

Signed by M. L. Ernst

J. Nelson Grace

Regional Administrator

Enclosure:

Report No. 50-424/86-128

[ccw/ encl:

. P. O'Reilly, Senior Vice President

I.NuclearOperations

E. Conway, Senior Vice President &

Project Director

td Whitney, General Manager,

Project Support

,

M D. Rice. Vice President, Project

Engineering

.

d H. Pinson, Vice President, Project

Construction

,

W T. Beckham, Vice President,

'

Plant Hatch

6(. A. Thomas, Vice President,

i

Licensing

d S. Read, General Manager,

Quality Assurance

d W. Hayes, Vogtle Quality

Assurance Manager

  1. C. Ramsey, Manager -

Readiness Review

S. B. Bockhold, General Manager,

)luclear Operations

j

T. Gucwa, Manager, Nuclear Safety

[

and Licensing

y D. Groover, Quality

Assurance Site Manager -

fonstruction

V

b. A. Bailey, Project Licensing

) tanager

!

4. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

d L. Blake, Jr., Esq., Shaw,

Pittman, Potts and Trowbridge

d E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

(cc w/ encl cont'd - see page 3)

_

.

..

Georgia Power Company

3

JAN 0 91987

(gc w/ encl cont'd)

(I. G. Ledbetter, Commissioner,

yepartmentofHumanResources

(/. H. Badger, Office of Planning

,and Budget

LY. Kirkland, III, Counsel,

Office of the Consumer's Utility

. jCouncil

M. Feig, Georgians Against

N. Nuclear Energy

B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

t[r.O.H. Paris,AdministrativeJudge

. Atomic Safety and Licensing Board

fanel

(K. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

b

w/ enc 1:

Reis, 0GC

M. Hill, IE

. Miller, NRR

g Brach, ED0

M. Sinkule, RII

E. Christnot, RII

/CResidentInspector

Document Control Desk

State of Georgia

A.l S

fg

/5k'Gnmes

Es car

A"'7

WQ_

AM}$

/408 f'W

I/7 / 87

I/1/87

1/7/87

RII

RII

RII

R

RII

f

WS

h

/

EChristnot

MSinkule

VLBrownlee

RWalk r

ErnJt

R/ M 86

42/ /86

R/--18E

12/.__JB6_

01/f/87

t/2./ B7

'/ /6/

I/'1/87

l/7/ s'