JAN 0 91987
Docket No. 50-424
License No. CPPR-108
Gporgia Power Company
MTTN: Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302.
Gentlemen:
SUBJECT: NRC REVIEW 0F V0GTLE, UNIT 1 READINESS REVIEW MODULE NO. 22,
INDEPENDENT DESIGN REVIEW (IDR) - REPORT N0. 50-424/86-128
'The NRC has completed a detailed review, inspection, and verification of the
subject module.
Technical inspections were conducted at the Vogtle site, IDR
reviewer offices in Boston, MA, and Architect / Engineer offices in Los Angeles,
CA.
The resultant findings were discussed with members of your staff at the
conclusion of these inspections.
These inspections monitored the conduct of the
IDR from preparation of review plans, through review plan implementation and
concluded with inspections of the resolution of observations including
implementation of corrective / preventative actions.
The NRC's conclusion
regarding Module 22 acceptability includes the independent design review
conclusions associated with the civil / structural modules, viz., Mndule 1
(Reinforced Concrete Structures), Module 8 (Structural Steel) and Module 13
(Foundations and Backfill, Coatings and Post Tensioning).
The results of Module 22 reviews and inspections are summarized into the
categories of acceptable, conditionally acceptable, and/or unacceptable.
Your
attention is invited to these matters which will be pursued during future
licensing reviews and inspections.
Based on the NRC review and inspection of those activities identified in the
module, we have determined that the design process at Vogtle, Unit 1 is acceptable
and complies with applicable regulatory requirements. One item was identified as
conditionally acceptable. Georgia Power's Readiness Review Program IDR observation
22-F11, identified that safety-related electrical cables in vertical trays may
not be adequately supported. After review of preliminary supporting documentation
provided by the architect-engineer, the IE inspection team concluded that the
intent of General Design Criteria 2 may not have been met. This issue has been
referred to NRR for subsequent resolution. This decision was based on information
currently available to the inspectors and reviewers.
Should information subsequently become available which was not considered during
this review or which conflicts with earlier information, it will be evaluated to
determine what effects it may have on the above conclusion.
,
m"Te MHP
'
G
.reat
-
<
.
.
Georgia Power Company
2
JAN 0 91987
Please contact us should you have any questions concerning this letter.
Sincerely,
Signed by M. L. Ernst
J. Nelson Grace
Regional Administrator
Enclosure:
Report No. 50-424/86-128
[ccw/ encl:
. P. O'Reilly, Senior Vice President
I.NuclearOperations
E. Conway, Senior Vice President &
Project Director
td Whitney, General Manager,
Project Support
,
M D. Rice. Vice President, Project
Engineering
.
d H. Pinson, Vice President, Project
Construction
,
W T. Beckham, Vice President,
'
Plant Hatch
6(. A. Thomas, Vice President,
i
Licensing
d S. Read, General Manager,
Quality Assurance
d W. Hayes, Vogtle Quality
Assurance Manager
- C. Ramsey, Manager -
Readiness Review
S. B. Bockhold, General Manager,
)luclear Operations
j
T. Gucwa, Manager, Nuclear Safety
[
and Licensing
y D. Groover, Quality
Assurance Site Manager -
fonstruction
V
b. A. Bailey, Project Licensing
) tanager
!
4. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
d L. Blake, Jr., Esq., Shaw,
Pittman, Potts and Trowbridge
d E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
(cc w/ encl cont'd - see page 3)
_
.
..
Georgia Power Company
3
JAN 0 91987
(gc w/ encl cont'd)
(I. G. Ledbetter, Commissioner,
yepartmentofHumanResources
(/. H. Badger, Office of Planning
,and Budget
LY. Kirkland, III, Counsel,
Office of the Consumer's Utility
. jCouncil
M. Feig, Georgians Against
N. Nuclear Energy
B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
Panel
t[r.O.H. Paris,AdministrativeJudge
. Atomic Safety and Licensing Board
fanel
(K. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
b
w/ enc 1:
Reis, 0GC
M. Hill, IE
. Miller, NRR
g Brach, ED0
M. Sinkule, RII
E. Christnot, RII
/CResidentInspector
Document Control Desk
State of Georgia
A.l S
fg
/5k'Gnmes
Es car
A"'7
WQ_
AM}$
/408 f'W
I/7 / 87
I/1/87
1/7/87
RII
RII
RII
R
RII
f
WS
h
/
EChristnot
MSinkule
VLBrownlee
RWalk r
ErnJt
R/ M 86
42/ /86
R/--18E
12/.__JB6_
01/f/87
t/2./ B7
'/ /6/
I/'1/87
l/7/ s'