ML20210C743

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/86-48 & 50-251/86-48 on 870114.No Violations or Deviations Noted
ML20210C743
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/14/1987
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML20210C749 List:
References
NUDOCS 8702090451
Download: ML20210C743 (2)


See also: IR 05000250/1986048

Text

, _ .

' '

JAN 14 ggy s{I a.. . -

Docket Nos. 50 250, 50-251

License Nos. DPR-31, DPR-41

Florida Power and Light Company

ATTN: Mr. C. O. Woody

Group Vice President

Nuclear Energy Department

P. O. Box 14000

Juno Beach, FL 33408

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-250/86-48 AND 50-251/86-48

This refers to the Nuclear Regulatory Comission (NRC) inspection conducted by

S. J. Vias on December 15-19, 1986. The inspection included a review of activities

authorized for your Turkey Point facility. At the conclusion of the inspection,

the findings were discussed with those members of your staff identified in the

enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

l- i

'

David M. Verrelli, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc: (See page 2)

8702090451 870114

PDR ADOCK 05000250

0 PDR

LE01 l

.

- _ - _ _ _ _ _

.

.

'_ .( M 1 4157

Florida Power and Light Company 2

cc w/ encl:

C. M. Wethy, Vice President

Turkey Point Nuclear Plant

C. J. Baker, Plant Manager

Turkey Point Nuclear Plant

L. W. Bladow, Plant QA Superintendent

J. Arias, Jr., Regulatory and Compliance

Supervisor

bec w/ enc 1:

NRC Resident Inspector

Document Control Desk

State of Florida

"r ias /

jlake

"w

ARHerdt

"gr-

S

p/13/86

1:/q/8$ /$/8) 10/W/8f I

l

. . . . . . . . . .