ML20210C141

From kanterella
Jump to navigation Jump to search
Proposed Burnup Dependent Tech Specs,Mitigating Reduced Operating Limits as Result of Cycle 8 Reanalysis
ML20210C141
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/10/1986
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML20210C134 List:
References
NUDOCS 8609180253
Download: ML20210C141 (27)


Text

{{#Wiki_filter:a I e o LIST OF FIGURES Number Title Pace 2.1-1 CORE PROTECTION SAFETY LIMIT 9a 2.1-2 CORE PROTECTION SAFETY LIMITS 9b 2.1-3 CORE PROTECTION SAFETY LIMITS 9c 2.3-1 PROTECTIVE SYSTEM MAXIMUM ALLOWABLE SETPOINT 14a 2.3-2 PROTECTIVE SYSTEM MAXIMUM ALLOWABLE SETPOINTS 14b 3.1.2-1 REACTOR COOLANT SYSTEM HEATUP AND C00LDOWN LIMITATIONS 20a 3.1.2-2 REACTOR COOLANT SYSTEM NORMAL OPERATION-HEATUP LIMITATIONS 20b 3.1.2-3 REACTOR COOLANT SYSTEM, NORMAL OPERATION C00LDOWN 20c LIMITATIONS 3.1.9-1 LIMITING PRESSURE VS. TEMPERATURE FOR CONTROL R0D DRIVE 33

                    .PERATION WITH 100 STD CC/ LITER H O 2

3.2-1 BORIC ACID ADDITION TANK VOLUME AND CONCENTRATION VS. RCS 35a AVERAGE TEMPERATURE 3.5.2-1A R0D POSITION LIMITS FOR FOUR-PUMP OPERATION FROM 0 EFPD 48b TO 25 EFPD - ANO-1 3.5.2-1B R0D POSITION LIMITS FOR FOUR-PUMP OPERATION FROM 25 'EFPD 48c TO 200 EFPD - ANO-1 3.5.2-1C R0D POSITION LIMITS FOR FOUR-PUMP OPERATION FROM 200 EFPD 48d TO 380 EFPD - ANO-1 3.5.2-10 ROD POSITION LIMITS FOR FOUR-PUMP OPERATION FROM 380 EFPD 48e TO E0C - ANO-1 3.5.2-2A R0D POSITION LIMITS FOR THREE-PUMP OPERATION FROM 0 EFPD 48f. TO 25 EFPD - ANO-1 3.5.2-2B R0D POSITION LIMITS FOR THREE-PUMP OPERATION FROM 25 EFFD 48g TO 200 EFPD - ANO-1 3.5.2-2C ROD POSITION LIMITS FOR THREE-PUMP OPERATION FROM 200 EFPD 48h TO 380 EFPD - ANO-1 3.5.2-2D R00 POSITION LIMITS FOR THREE-PUMP OPERATION FROM 380 EFPD 481 TO EOC - ANO-1 Amendment No. 52, /I, 92 iv k P [

T.1;f 3.5.2-3A ROD POSITION LIMITS FOR TWO-PUMP OPERATION FROM 0 EFPD 48j TO 25 EFPD 3.5.2-3B R0D POSITION LIMITS FOR TWO-PUMP OPERATION FROM 25 EFPD 48k TO 200 EFPD 3.5.2-3C R0D POSITION LIMITS FOR TWO-PUMP OPERATION FROM 200 EFPD 481 TO 380 EFPD 3.5.2-3D

         '       R0D POSITION LIMITS FOR TWO-PUMP OPERATION FROM 380 EFPD    48m TO EOC 3.5.2-4A   OPERATIONAL POWER IMBALANCE ENVELOPE FOR OPERATION FROM     48n 0 EFPD TO 25 EFPD - ANO-1 3.5.2-4B   OPERATIONAL POWER IMBALANCE ENVELOPE FOR OPERATION FROM     48o 25 EFPD TO 200 EFPD - ANO-1 3.5.2-4C   OPERATIONAL POWER IMBALANCE ENVELOPE FOR OPERATION FROM     48p 200 EFPD TO 380 EFPD - ANO-1 3.5.2-4D   OPERATIONAL POWER IMBALANCE ENVELOPE FOR OPERATION FROM     48q 380 EFPD TO E0C - ANO-1 3.5.2-5  -LOCA LIMITED MAXIMUM ALLOWABLE LINEAR HEAT RATE              48r 3.5.2-6A  APSR POSITION LIMITS FOR OPERATION FROM 0 EFPD TO           48s 25 EFPD - ANO-1 3.5.2-6B  APSR POSITION LIMITS FOR OPERATION FROM 25 EFPD TO          48t 200 EFPD - ANO-1 3.5.2-6C  APSR POSITION LIMITS FOR OPERATION FROM 200 EFPD TO         48u 380 EFPD - ANO-1 3.5.2-60   APSR POSITION LIMITS FOR OPERATION FROM 380 EFPD TO         48v EOC - ANO-1 3.5.4-1    INCORE INSTRUMENTATION SPECIFICATION AXIAL IMBALANCE        53a INDICATION 3.5.4-2    INCORE INSTRUMENTATION SPECIFICATION RADIAL FLUX TILT       53b INDICATION 3.5.4-3    INCORE INSTRUMENTATION SPECIFICATION                        53c 3.24-1    HYDROGEN LIMITS FOR ANO-1 WASTE GAS SYSTEM                 110be 4.4.2-1   NORMALIZED LIFT 0FF FORCE - HOOP TENDONS                     85b 4.4.2-2   NORMALIZED LIFT 0FF FORCE - DOME TENDONS                     85c 4.4.2-3. NORMALIZED LIFT 0FF FORCE - VERTICAL TENDONS                 85d Amendment No. 52, 80, 81, 82, 93,      v 97

r M ,_ Boric Acid Addition Tank Volume and Concentration Vs RCS Average TemDerature -- ANO-1, Cycle 8 Figure 3.2-1 8000 0_PERATION AB0VE AND TO THE LEFT OF THE CURVES IS ACCEPTABLE s 70b0 - 8700 ppm 9500 ppm 6000 - I:n 10000 ppm 5000 - j 12000 ppm 5m [ 4000 -

          .3 E

3000 - E

    .      s.

e 2000 _ 1000 - 0 I I I 200 300 400 500 600 RCS Average Temperature, F Temp., F Required Volume, gal 8700 ppm 9500 ppm 10000 ppm 12000 ppm 579 7308 6657 6306- 5200 532 6126 5580 5289 4355 500 5273 4802 4548 3749 400 2790 2543 2409 1984 300 1234 1129 1070 877 , 200 0 0 0 0 Amendment No. 33, #3,'52, 66, 71 92 35a

1.

6. If a control rod in the regulating or axial power shaping groups is declared inoperable per Specification 4.7.1.2 operation above 60 percent of the thermal power allowable for the reactor coolant pump combination may continue provided the rods in the group are positioned such that the rod that was declared inoperable is contained within allowable group average position limits of Specification 4.7.1.2 and the withdrawal limits of Specification 3.5.2.5.3.

3.5.2.3 The worth of single inserted control rods during criticality are limited by the restrictions of Specification 3.1.3.5 and the Control Rod Position Limits defined in Specification 3.5.2.5. 3.5.2.4 Quadrant tilt:

1. Except for physics tests, if quadrant tilt exceeds 3.1%,

reduce power so as not to exceed the allowable power level for the existing reactor coolant pump combination less at least 2% for each 1% tilt in excess of 3.1%.

2. Within a period of 4 hours, the quadrant power tilt shall be reduced to less than 3.1% except for physics tests, or the following adjustments in setpoints and limits shall be made:
a. The protection system maximum allowable setpoints (Figure 2.3-2) shall be reduced 2% in power,for each 1% tilt.
b. The control rod group and APSR withdrawal limits shall be reduced 2% in power for each 1% tilt in excess of 3.1%.
c. The operational imbalance limits shall be reduced 2%

in power for each 1% tilt in excess of 3.1%.

3. If quadrant tilt is in excess of 25%, except for physics tests or diagnostic testing, the reactor will be placed in the hot shutdown condition. Diagnostic testing during power operation with a quadrant power tilt is permitted provided the thermal power allowable for the reactor coolant-pump combination is restricted as stated in 3.5.2.4.1 above.
4. Quadrant tilt shall be monitored on a minimum frequency of once every two hours during power operation above 15% of rated power.

Amendment No.'6, 2Z, 3Z, 42, 92 47

1 o

3. Except for physics tests or exercising control rods, (a) the control rod withdrawal limits are specified on Figures 3.5.2-1(A-D), 3.5.2-2(A-D), and 3.5.2-3(A-D) for 4, 3 and l 2 pump operation respectively; and (b) the axial power shaping control rod withdrawal limits are specified on Figure 3.5.2-6(A-D). If any of these control rod position l limits are exceeded, corrective measures shall be taKen
           ,                immediately to achieve an acceptable control rod position.

Acceptable control rod positions shall be attained within 4 hours. I 3.5.2.6 Reactor Power Imbalance shall be monitored on a frequency not to exceed 2 hours during power operation above 40% rated power. Ex~ cept for physics tests, imbalance shall be maintained within the envelope defined by Figure 3.5.2-4(A-D). If the imbalance is not within the' envelope defined by Figure 3.5.2-4(A-D), corrective measures shall be taken to achieve an acceptable imbalance. If an acceptable imbalance is not achieved within 4 hours, . reactor power shall be reduced until imbalance limits are met. 3.5.2.7 The control rod drive patch panels shall be locked'at al.1 times with limited access to be authorized by the Superintendent. Bases The power-imbalance envelope ~ defined in Figure 3.5.2-4(A-D) is based on (1) LOCA analyses which have defined the maximum linear heat rate (see Figure 3.5.2-5), such that the maximum cladding temperature will not exceed the Final Acceptance Criteria and (2) the Protective System Maximum Allowable Setpoints (Figure 2.3-2). Corrective measures will be taken immediately should the indicated quadrant tilt, rod position, or imbalance be outside their specified boundaries. Operation in a' situation that would cause the Final Acceptance Criteria to be approached should a LOCA occur is highly improbable because all of the power aistribution parameters (quadrant tilt, rod position, and imbalance) must be at their limits while l i i i l Amendment No. 6, 2Z, 31, #3, 52, 48 92 .

                        --               , , , - - - . - , - - . . - . . - - , ,   ,,,,--..va--, , , -   - - . , ,
 , T, ,

Rod Position Setpoints for 4-Pump Operation From 0 to 25+10/-0 EFPD -- AN0-1 Cycle 8 Figure 3.5.2-1A 110 (300,102)

                                                                     'l     )            (283.6,102)          >

100 - (277.5,90) 90 .. SHUTDOWN MARGIN LIMIT 80 - (262.5,78) g 70 OPERATION OPERATION IN RESTRICTED

      @   60   -           THIS REGION IS NOT N                    ALLOWED 50 (130.5,48)                    (176.5,48) 40   _

E 30 - PERMISSIBLE

               -                                                                 OPERATING 20 REGION        -

(67.5,13) 10 _ (0,6.9) 0 t I I i i e i i i i i t i I l 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 80 100 0 20 40' 60 l I l t 1 I Group 7 0 20 40 60 80 100 t i I I t 1 Group 6 0 20 40 60 80- 100 Rod Index, % WD Group 5 Amendment No. 6, 7J, 6, 57, 71, 92 48b

  ,1, L

Rod Position Setpoints for 4-Pump Operation From 25+10/-0 to 200+ 10 EFPD ' AN0-1 Cycle 8 Figure 3.5.2-1B 110 gg _ (198,102) (266.5,102) ,, 90 - (266.5,90) p SHUTDOWN MARGIN LIMIT 80 - (257.5,78) OPERATION u 70 RESTRICTED E m OPERATION IN 60 - THIS REGION IS

     ,                NOT ALLOWED 50  -

[, (130.5,48) (176.5,48)

      $     40  -

3

     "                                                                                  PERMISSIBLE
                -                                                                       OPERATING 30 REGION 20   -

ig _ (67.5,13) (0.6.9) 0 ' ' ' ' ' ' ' ' ' ' ' ' ' ' 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 0 20 40 60 80 100 t t I I I I Grovo 7 ~ 0 20 40 60 80 100 l I i 1 i I Group 6 l 0 20 40 60 80 100 Rod Index, % WD Group 5 Amendment No. 48c ,

I . s Rod Position Setpoints for 4-Pump Operation From 200+10 to 380+10 EFPD -- ANO-1 Cycle 8 Figure 3.5.2-1C (266.5,102)(300,102) 100 - (232.2,102) - ; O

                    ~

90 - (266.5,90) > 80 ( 53.5,78) PERATION ESTRICTED

      +'         -

70 E co OPERATION IN THIS 60 - REGION IS NOT ALLOWED w te 50 (159.5,48) 176.5,48) 40 E PERMISSIBLE 30 - OPERATING REGION 20 10 0 (U'!'8) i i i i i i i i i i > i i 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 0 20 40 60 80 100 i t i I I I Group 7 0 20 40 60 80 100 i f f i t l Group 6 0 20 40 60 80 100 Rod Index, % WD Group 5 l l l Amendment No. 48d . t

Rod Position Setpoints for 4-Pump Operation After 380+10 EFPD -- ANO-1 Cycle 8 Figure 3.5.2-10 110 (266.7,102)(300,102) (234.8,102) - ' 100 - 90 - < (253.5,90) SHUTDOWN MARGIN LIMIT 80 OPERATION D(253.5,78) ESTRICTED

       "      70   -

E OPERATION IN THIS g REGION IS NOT g 60 ALLOWED 50 - (156.2,48) (176.5,48) f 40 30 - PERMISSIBLE 0PERATING 20 - REGION 10 - i 0,5.9) - 0 i l i i i e i i i i i i e i 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 0 20 40 60 80 100 I I i i e i 0 20 40 60 80 100 i l i i i l Group 6 O 20 40 60 80 100 Rod Index, % WD Group 5 i i Amendment No. 48e . l

T. Rod Position Setpoints for 3-Pump Operation From 0 to 25+10/-0 EFPD -- ANO-1 Cycle 8 Figure 3.5.2-2A 110 100 - 90 - (300,77) 80 (198.8,77) (283.9,77) > h 70 - (277.5,67) SHUTDOWN MARGIN LIMIT 60 - (262.5,58)

      %                                                         OPERATION 50                                                  RESMICTED
                 -    OPERATION IN THIS
        .,            REGION IS NOT ALLOWED
                  ~
      ,                                   (130.5,36)

(176.5,35.5) 30 -

                  ~

PERMISSIBLE OPERATING 10 - (0,5.1 467.5,9.75) REGION 4 0 i i e i i i i i I i 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 0 20 40 60 80 100 i e i i i Group 7 0 20 40 60 80 100 t I i l I I Group 6 0 20 40 60 80 100

                ,      ,    ,     ,    ,          i                      Roc Index, % WD Gruop 5 Amendment No. 21, 31, f3, E2, 71, 92                 48f              ,

Rod Position Setpoints for 3-Pump Operation from 25+10/ 0 to 200+10 EFPD -- AND-1 Cycle 8 Figure 3.5.2-2B l 100 - s 90 - 80 - (266.5,77)(300,77) (198.8,77) ' O , 0 h SHUTDOWN MARGIN LIMIT (266.5,67) >

   *o 60    -

(257.5,58) OPERATION IN THIS OPERATION e REGION IS NOT RESTRICTED - 50 ~ 3 ALLOWED Fu 40 - y (130.5,36) (176.5,35.5). 30 - 20 - PERMISSIBLE OPERATING 10 .(0,5.1) (67.5,9.75) 0 t i i I t t I i i t I e i i 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 0 20 40 60 80 100 t t t t f i Group 7 0 20 40 60 80 100 I i 1 1 I I O 20 40 60 80 100 Rod Index, % WD roup 5 Amendment No. 489

0 . Rod Position Setpoints for 3-Pump Operation From 200+10 to 330+10 EFPD -- ANO-1 Cycle 8 Figure 3.5.2-2C 110 100 - 90 - 80

                 .                                                                       (   6. ,       ( 0,77)

(233.1,77)  : p- - . O jf 70

                ~

(266.5567) > oo SHUTDOWN MARGIN LIMIT 5? - ( 53.5,58) 63 60 OPERATION IN THIS JPERATION 13 REGION IS NOT rESTRICTE - 3 50 ALLOWED s' 40 (159.5,36) p (175.5,35.5) 30 . PERMISSIBLE 20 OPERATING ' REGION

                                                                                                                              ~

10 - (0,4.3) (83.9,75) 4 0 , I , , , , , , , , , , l i , l 0 20 40 60 80 100 120 140 160 180 200 220 240 250 280 300 0 20 40 60 80 100

                                                                '                  '         '      f        ' ;J l                                                                                           Group 7 l                                     0,        20     40   60 80               100 I      I   ,    ,                  l Group 6 0      20    40     60 80         100 Rod Index, % WD Group 5 l

l Amendment No. 48h

                                                                                                                              +

r < -

                                                                                ,m    - .,        -       --          e w - -

Rod Position Setpoints for 3-Pump Operation After 380_+10 EFPD -- ANO-1 Cycle 8 Figure 3.5.2-2D 110 , 100 - 90 _ 80 - (267.3,77) (300,77) (235.8,77) ' 70 - y <(253.5,67) N 60 - SHUTDOWN MARGIN LIMIT OPERATION

                                                                                                    >(253.5'58)

OPERATION IN THIS RESTRICTED

   '5    50    -     REGION IS NOT w                 ALLOWED d
   ,                                                                  (176.5,35.5) 30 20                                                              PERMISSIBLE OPERATING REGION 10    - (0,4.4)                (80.5,9.75) 0          I       '   '   '     '     '      '      ' '       '               '      '     '   '

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 0 20 40 60 80 100 t t i I t i Group 7 0 20 40 60 80 100 t t I I I 1 0 20 40 Gr up 6 60 30 100 8 I ' ' ' ' Rod Index, % WD Group 5 Amendment No. 481 , n . - - . , , , - , --, ,--,, +-

9 Rod Position Setpoints for 2-Pump Operation Frem 0 to 25+10/-0 EFPD -- ANO-1 Cycle 8 110 9#* **~^ 100 -  ; 90 - 80 N 70 - o y 60 -

   %                                                                                                               (300,52) 50   _                                               (200.5.52)                             (284.3,52)         p c'                                        SHUTOOWN MARGIN LIMIT                                   (277.5,44) 40   -      OPERATION IN THIS                                                                                              '

["s REGION IS NOT ALLOWED OPERATION RESTRICTED 30 - (130.5,24) 20 - (176.5,23)  : PERMISSIBLE 10 -(0,3.4) OPERATING REGION a ' (67.5,6.5) - 0 i i i i i i i , , , , , , , 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 0 20 40 60 80 100 t t I e i a Group 7 " 0 20 40 60 80 10C I i t i g g 0 20 40 60 80 100

                 '       '     '    '     '             '                               Rod Index, ". WD Group 5                                                                                                    ,

Amendment No. ly, 31, /3, 57, 71. 92 48j

0 .. Rod Position Setpoints for 2-Pump Operation Frcro 25+10/-0 to 200+10 EFPD -- ANO-1 Cycle B Figure 3.0.2-33 110i -~7

                                                        '~

4 4 100 -  ! i l i l 90 [' t 80 d L

                   ~

h 70 m -

  ~         60                                                                                                      3 Y                                                                 (260.5,52) e           (266.052)gygg-)d e,*--
                  ~

50 Sh'n093N '

    ,                     CPERATION IN THIS 5-                      REGION IS NOT                                    '               (266'.5dC'0' j

40 - ALLOWED MARGIN 1.IMU 7,j opgRnMN (E57.52Gk

                                                                                                              ^

D

                                                                    /         FISTRictFj /                          y 30     -

(130,S.2Ojp f

                                                                 /                 g#                                1 1

20 -

                                                   /             /*,,A-{y3,3.g       .
                                               / pe#

3E miMIBl3 Of 10 - (0,3.0

                                                                                    .hE,   At W3 (67.E,6,5)                                                                    ]

O i i i e t i ._..L.A , .&,.. A _. ,j~ &_4.,L _J 0 20 40 60 80 100 00 7.40 150 I?0 1'f0 220 14's E5G EP.9 200  ; O 23 M 00 F40 10 L , ~ .s 3J ,.... . L e ,.L.-. 4 % ) . StGM i td 0 20 40 >3D 100 I I . _f , ' 4 , - - nJ Group 5 0 20 40 60 80 1]O i i r e -

                                                   .3                               !Od .hdeh 4. ti$

Group 5 l Ar.ercent No. 4%

Rod Position 59tpoints for 2-Nap Operation Frca 200+JO to 3e0110 EFFD '- ANO-1 C3 :le 8 Figure 3.5.2-3C

                                       = _ -

719 m a. I 30 , I 30 ' .. y 70 p

                      ~

n. 6V w [M o (2i4.9,52 (266.5,52)(300,52) t- e

        **       SG SHUTDOWN MARGIfl LIMIT             (266,5,44)6

("i g- OPERATION .G TMs OPERATIO4 g- VIGION IS M07 E5TRICTED (253.5.38) A.t0WE0 gl "

                 *io t

0 59.5.24 g

                 ;,9       ,
                                                                        /                    {l76.E,23)

PERFilSSIBLE

S j OPERATIflG b ' J_ _ ! .

(O' d _ r W V (G) 6.5) REGl0N _t r t_ _ 1_ l __ _ ,,,, l _ f f i f f 4 0 20 to 63 90 100 1$3 e 160 180 200 220 240 260 280 300 0 2C 40 60 80 100 t I  ! t f i Gro*)p 7 0 20 40 50 80 100 t Q_ _t 1 1. 1 Group 6 0 20 40 60 30 E00 t .t .e i t a Rod Index, % WD Groep 5 Amend mr.t No. 481 i

o, Rod Position Setpoints for 2-Pump Operation Af ter 380+10 EFPD -- ANO-1 Cycle 8 Figure 3.5.2-3D 110 100 , 90 - 80 y 70 - 8 m 60 -

    %                                                                             (268.2,52)(300,52)
    )

50 - (237.7,52).. " - OPERATION IN THIS SHUTOOWN MARGIN LIMIT ' 40 - OPERATION g REGION IS NOT RESTRICTEn >(253.5,38) ALLOWED 30 - 20 - PERfilSSISLE OPERATING 10 - (0,2.9) REGION (80.5,6.5) 0 ~ t I i i i i i f f i e i e i 0 20 40 60 80 '100 120 140 160 180 200 220 240 260 280 300 0 20 40 60 80 100 i i I i i i Group 7 , 0 20 40 60 80 100 l i i i i i Group 6 0 20 0 60 80 100 Rod Index, % WD Group 5 i Amec.Jment No. 48m l

Operational Power Imbalance Setpoints for Operation From 0 to 25+10/-0 EFPD -- ANO-1, Cycle 8 Figure 3.5.2-4A

                                                                                 --110

(-10.1,102) ,

                                                                                 --1001(10.8,102)

(-20.2,92) , , (12.2,92) (-25.'9,80) , 80 s (16.8,80) OPERATING ' 70 REGION

                                                                                 --60 RESTRICTED                                        RESTRICTED REGION                       a    -.50            REGION E

88 --40

                                                                          .N j; -     30 x
     ,                                                                        .--20 h

j! ..10 1 I t t l A I i 1 1 40 20 -10 0 10 20 30 40 50 Axial Power Imoalance, % I l l l l Amendment No. 71, 57, 92 48n - l

          -.   , ~ - , _ - - _ , - - - - _-                   ---    _ .-                           , - - - - _ _       _ - - _ _ - - _.

Operational Power Imbalance Setpoints for Operstion From 25+10/-0 to 200+10 EFP0 -- ANO-1, Cycle 8 Figure 3.5.2-48 ,

                                                 -- 110

(-18.0,102)

                                                 - - 100 1,(14.6.102)

(-18.2,92) **

                                                   - 90

(-24.7,80) . 80 0(16.2,80) PERMISSIBLE OPERATING REGION 70 60 RESTRICTED RESTRICTED REGION . REGION 50 E g- 40 N

                                            , -      30 0                                  .
                                              .-- 20 b

c. 10 e i 1 1 1 1 1 I I I 40 20 -10 0 10 20 30 40 50 Axial Power Imbalance, % P i i kendment No. 480 l l I

   <,                                                                                         }

Operational Power Imbalance Setpoints for Operation From 200+10 to 380+10 EFPD -- AN0-1, Cycle 8 Figure 3.5.2-4C , f

                                                             - 110

(-22.5,102) e

                                                          -- 100 1, (13.0,102)

(-22.6,92) **

                                                          -- 90          h

(-25.9,80) d - 80 (16.2,80) PERMISSIBLE OPERATING -' 70 REGION 60 RESTRICTED RESTRICTED , REGION REGION

                                                          .' 50 E-          40
                                                   '8 -        30 a

C- 20 E E-- 10 , e a e a f f f  ? I g 40 20 -10 0 10 20 30 40 50 Axial Power Imbalance, % ) . 1 i Anendment No. 48p

a e Operational Powe ' Imbalance Setpoints for Operation After3801,10 EFPD -- AND-1, Cycle 8 Figure 3.5.2-4D

                ~
                                                             ~

110 (-23.6,102) (12.0,102)

                                                             ~

100 (-26.3,92) (14.0,92)

                                                             -  - 90

(-26.7,80)O -- 80 )(16.2,80) PERMISSIBLE OPERATING - 70 REGION

                                                             ~-

60 RESTRICTED u RESTRICTED REGION gj '- 50 REGION

                                                          $-- 40
a. 30 20 2 --

10

                        .       .    . i        i                e i_     i    i       y
                      -50      -40  -

30 10 0 10 20 30 40 50 Axial Power Imbalar.ce, % Anendment No. 48q

                              ,   y            _.       m              ,p  3               = . ,   . , , . -   -.-. 4,
 , sy.      -,

LOCA Limited Maximum Allowable Linear Heat Rate , Figure 3.5.2-5 , 20 , , , , , , , , , , , 18 - - C, s, _ _ 7',"- y 16 - ,/ -

       %                                             /         s E 

G _ /

                                                        /
                                          ~
       %                                            i 3         -        '                    '                                                                                                                                  -

14 j C / g _ - 5 0-1000 mwd /mtU

  • 12 -

___ 1000-2600 mwd /mtU _. After 2600 mwd /mtU _ 10 1 I I I I I I I ' ' '

                'O                      2                          4                             6'                            8              10                                    12 Axial Location of Peak Power From Bottom of Core, ft Amendment.No. #7, 52, 77, 92                                                           48r
                     ,,n..      . - .
                                              .n-,,     , -                , . . , , . - -          - . . - . . - - .       ,. s -.,-.. -    ,   - , - - - . . , . , . - , , ,

1 e APSR Position Setpoints for Operation From 0 to 25+10/-0 EFPD -- ANO-1, Cycle 8 Figure 3.5.2-6A 110 (9.5,102) (33.3,102)

                                                      ^

100 - RESTRICTED 90

                                  -     '(9.5,90)                 (43.5,90) 80,                                       (48.5,78) 2
                                 -(0.75.8) 70
                      $    60   -

t a 50 PERMISSIBLE

                        .                          OPERATING                       (100,47.1)  I REGION h-40      -

2 30 - 20 - 10 - 0 i i i e i e i i i 0 10 20 30 40 50 60 70 80 90 100

                                                               % Withdrawn Amendment No. JJ, f 3, sg. 7J. 92, 97              48s e

APSR Position Setpoints for Operation From 25+10/-0 to 200+10 EFPD -- ANO-1, Cycle 8 Figure 3.5.2-6B 110 (9.5,102) (33.3,102)

                             -                                                              RESTRICTED 100 REGION
                                    '(9.5,90)            (43.5,90) 90   -

80 (48.5,78) 70 _ E 60 PERMISSIBLE OPERATING GION o (100,47.1) ' u -

                     -  40 5

j 30 20 - 10 - 0 e i i e i i e i i 0 10 20 30 40 50 60 70 80 90 100

                                                       % Withdrawn l

l l l Amendment No. 48t l

, a a APSF; Position Setpoints For Operation From 200+10 to 380+10 EFPD - ' AN0-1, Cycle 8 Figure 3.5.2-6C s

110 (9.5,102) (33.3,102) 100 RESTRICTED

                                                    'N               REGION 90   -       > (9.5,90)

(0,75.8) '

                 ,,                                                      (100,77.7) g!    70   -

m 60 h} - PERMISSIBLE

                 %.                               OPERATING 50   -                     REGION w

5 40 5-30 - 20 - 10 - 0 I i ' ' ' ' ' ' ' 0 10 20 30 40 50 60 70 80 90 100

                                                      % Withdrawn Amendment No.                                       48u
 ,, .. s a APSR Position Setpoints for Opdration After 380 + 10 EFPD -- ANO-1, Cycle 8 Figure 3.5.2-6D
                       ~

110 100 l 90 80 - 70 - APSR INSERTION NOT ALLOWED IN THIS TIME INTERVAL I 60 - 8 50 - t u 40 - C I 30 - u 20 10 - 0 ' ' ' ' ' ' ' ' ' 0 10 20 30 40 50 60 70 80 90 100

                                                                              % Withdrawn l

1 Amendment No. JI, fJ, 52, 77, 97, 97 48v - I

                                                                                      .---,,--,---,,-,,.n..,,----,,--,v,-,        , , , , - , - , , - - - --
             - , ,, --   -n - - , , , - - .                .  .w,--   - - , - ,

o,* o 9

4. 7 REACTOR CONTROL R0D SYSTEM TESTS 4,7,1 Control Rod Drive System Functional Tests
           ' Applicability Applies to the surveillance of the control rod. system.

Objective To assure operability of the control rod system. Specification 4.7.1.1 The control rod trip insertion time shall be measured for each control rod at either full flow or no flow conditions following

                        -each. refueling outage prior to return to power. 'The maximum control rod trip insertion time for an operable control rod drive mechanism, except for the Axial Power Shaping-Rods (APSRs), from the fully withdrawn position to 3/4 insertion
                        -(104 inches travel) shall not exceed 1.66 seconds at reactor coolant   full flow conditions or 1.20 seconds for no flow conditions.

of power will notForcause the APSRs it shall be demonstrated that loss rod movement. If-the trip insertion time above is not met, the rod shall be declared inoperable.

4. 7.1. 2 If a control rod is misaligned with its group average by more than an indicated nine (3) inches, the rod shall be declared inoperable and the limits of Specification 3.5.2.2 shall apply.

The rod with the greatest misalignment shall be evaluated first. The position of a rod declared inoperable due to misalignment shall not be included in computing the average position of the group for determining the operability of rods with le'ser s misalignments.

4. 7.1. 3 I'f a control rod cannot be exercised, or if ~it cannot be located with absolute or. relative position indications or in or out limit lights, the rod shall be declared to be inoperable.

Bases The control rod trip insertion time is the total elapsed time from power interruption at the control rod drive breakers until the control rod has completed 104 inches of travel from the fully withdrawn position. The specified trip time is based upon the safety analysis in-FSAR, Section 14. Each control rod drive mechanism shall be exercised by a movement approximately two (2) inches of travel every two (2) weeks. This requirement shall apply to either a partial or fully withdrawn control rod at. reactor operating conditions. Exercising the drive mechanisms in this manner provides assurance of reliability of the mechanisms. A rod is considered inoperable if it cannot be exercised, if the trip insertion time is greater than the specified allowable time, or if the rod Amendment No. 21 102 L}}