ML20210C026
| ML20210C026 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 01/12/1987 |
| From: | Zech G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| References | |
| NUDOCS 8702090298 | |
| Download: ML20210C026 (3) | |
Text
oWiul January 12, 1987 Docket Nos. 50-327, 50-328 License Nos. DPR-77, DPR-79 Tennes e Valley Authority ATTN. Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:
SUBJECT:
MEETING
SUMMARY
- SEQUOYAH, DOCKET NOS. 50-327 AND 50-328 This refers to the two management meetings conducted at the Sequoyah site on December 11, 1986. The meetings were held to discuss two issues:
(1) The status of ongoing improvement programs and other restart issues, and (2) TVA licensing activities. Summaries of the meeting topics are provided in Enclosure 1.
A list of attendees at the meetir.gs is shown in Enclosure 2.
It is our opinion that these meetings were beneficial and provided both the NRC and TVA a better understanding of the issues.
An effort should be made to schedule a followup meeting at a later date.
In accordance with Section 2.790 of NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning these matters, we will be pleased to discuss them.
Sincerely, Original signed by Gary G. Zech, Director Division of TVA Projects
Enclosures:
1.
Meeting Summary 2.
Meeting Attendees cc w/encis:
(See page 2) 8702090298 870112 DR ADOCK 05000327
)
PDR g
ZE YS
s Tennessee Valley Authority 2
January 12, 1987 c w/encls:
. L. Abercrombie, Site Director h.SequoyahNuclearPlant R. Wallace, Plant Manager VR. W. Cantrell, Acting Director
- 3 Nuclear Engineering p. L. Gridley, Director M.NuclearSafetyandLicensing R. Harding, Site Licensing Manager fccw/encls:
J.' N. Grace, RII gH. R. Denton, NRR v 4. L. Thompson, NRR A.M. Taylor,IE B. Hayes, 01
. R. Connelly, 01A
. P. Barr, RII
/RCResidentInspector NRC Document Control Desk State of Tennessee l
i r
RII RI RI G
.er n arroll h rr 1
7 1/f/87 ly/87 s
i 1
4 ENCLOSURE 2 MEETING ATTENDEES 1.
Personnel attending the meeting on startup activities U. S. Nuclear Regulatory Commission G. G. Zech - Director, Division of TVA Projects K. P. Barr - Branch Chief, Division of TVA Projects K. M. Jenison - Senior Resident Inspector Sequoyah Nuclear Plant Tennesee Valley Authority H. L. Abercrombie - Site Director W. G. Andrews - Site Quality Manager P. R. Wallace - Plant Manager M. R. Harding - Site Licensing Manager D. W. Wilson - Sequoyah Project Engineer, Department of Nuclear Engineering L. M. Nobles - Plant Superintendent B. M. Patterson - Maintenance Superintendent G. B. Kirk - Compliance Licensing Manager J.- H. Sullivan - Plant Operations Review Staff Supervisor B. E. Schofield - Licensing Engineer T. E. Spink - Replacement Parts Program Manager 2.
Personnel attending the meeting on TVA licensing activities U. S. Nuclear Regulatory Commisssion G. G. Zech - Director, Division of TVA Projects K. P. Barr - Branch Chief, Division of TVA Projects K. M. Jenison - Senior Resident Inspector Sequoyah Nuclear Plant Tennessee Valley Authority R. L Gridley - Manager Nuclear Safety and Licensing M. R. Harding - Site Licensing Manager G. B. Kirk - Compliance Licensing Manager 3