Docket No.' 50-423 B12500 t

j l

l I

i Attachment I i

Millstone Nuclear Power Station, Unit No.~ 3 Proposed Revision to License Condition i

i l

l l

l l

l i

May,1987 B705060003 870501 PDH ADOCK 05000423 l

p PDR 1

I

JAN 31 1986

_4 (3)

Containment Average Temperature (Section 3.11, SSER 4)*

Prior to startup following the first refueling outage,-the qual-ified life of electrical equipment within the scope of 10 CFR 50.49 located inside containment shall be recalculated based on the actual temperatures monitored inside containment during the first cycle of operation.

(4)

N-1 Loop Operation (Section 4.4.7 SER, Section 4.4.7, 15.10, SSER 4)

Three loop operation is prohibited until outstanding issues are resolved to the satisfaction of the NRC staff.

(5)

Inservice Inspection Program (Section 5.2.4.3, SER, 6.6.3 SER)

Prior to May 25, 1986, NNECO shall submit the inservice inspection program which conforms to the ASME Code in effect on November 25, 1984 inaccordancewith50.55a(g)(4),forNRCstaff review and approval.

(6)

Instrumentation for Monitoring Post Accident Conditions R.G. 1.97 Revision 2 Requirements (Section 7.5.2.6, SER, 55ER 4 )

NNEC0 shall install and have operational instrumentation to monitor containment sump water temperature at the first l

schedaled outage of sufficient duration after procurement is complete but no later than startup after the first refueling outage.

J 2

% og rp_ Am b

\\ usartT W 1

l i

f[

  • The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.

l t

,a l

ta st ser 'A' Prior to startup following the second refueling outage, NNECO cnall install and have operational instrumentation to monitor containment cump water temperature, w