ML20210B532
| ML20210B532 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/30/1987 |
| From: | Scace S, Stetz J NORTHEAST NUCLEAR ENERGY CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20210B537 | List: |
| References | |
| MP-10323, NUDOCS 8705050350 | |
| Download: ML20210B532 (1) | |
Text
c c
e NORTHEAST tmIJTIES 5
l L 7 2lC U ~,'I'" T ~
NRfFoR![ CONNECTICUT 00101 7llJ:.7,i"J2J'.;! J "*"*'
am)55 68" L
L J ::":::::: : '::l":::::
April 30, 1987 MP-10323 Docket No. 50-336 U. S. Nucicar Reguintory Commission Document Control Desk Wanhington, D. C.
20555 l
Referencet 1.
Facility Operating License No. DPR-65 l
2.
Docket 50-336 3.
ASME Boiler and Pressure Vessel Code 1980 Edition and Addenda through Winter 1981 l
Centlement l
In accordance with Reference 3. the Millstone Unit 2 1986 Innervice l
Innpection Report is submitted for your information and use.
In-I spections covered in this report were performed during the refueling shutdown of September to December, 1986 Ynura truly.
NORTIIEAST NUCI.FAR ENERGY COMPANY FORT Stephen E. Scace Station Superintendent M111stonc Nuclear Power Station f ff b/b[Stdzl*
ohn P.
BY Unit i Superintendent Millatone Nuclear Power Station l
SI'.S / RTa r mo l
l Attachment 0
1 \\
070D050350 070 00 PDR ADOCK 00000136 0
FI)R
-