Informs That Feed Line Break Analysis Presented in 860731 Application to Amend Licenses DPR-53 & DPR-69 Redone W/More Limiting Moderator Temp Coefficient Input,In Effort to Simplify Upcoming Unit 2 Cycle 8 Reload Application
ML20210B293
Person / Time
Site: Calvert Cliffs 
Issue date: 02/03/1987
From: Elkins D
BALTIMORE GAS & ELECTRIC CO.
To: Mcneil S
Office of Nuclear Reactor Regulation
References
FCM-87-022, FCM-87-22, NUDOCS 8702090122
Download: ML20210B293 (2)


Text

'

1 i

BALTIMORE GAS AND ELECTRIC CHARLES CENTER. P.O. BOX 1475 BALTIMORE, MARYLAND 21203 NUCLEAR ENGINEERING SERVICES DEPARTMENT CALVERT CUFFS NUCLEAR POWER PLANT LUS8Y, MARYLANO 20657 February 3,1987 FCM 87-022 Mr. S. A. McNeil Office of Nuclear Reactor Regulation Nuclear Regulatory Commission Washington, D.C. 20555

SUBJECT:

Pending Moderator Temperature Coefficient (MTC) Technical Specification Change

REFERENCE:

(a) Letter, 3.A. Tiernan (BG&E) to A.C. Thadani (NRC), " Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Request for Amendment", July 31,1986 (b) Letter, C.H. Poindexter (BG&E) to E.3. Butcher, Jr. (NRC), Docket No. 50-318, " Request for Amendment to Operating License DPR-69, Seventh Cycle License Application", August 30,1985 Reference (a) requests a change to the positive MTC limit to facilitate implementation of the 24-month fuel cycle program. Although we hope to resolve the questions which remain unresolved between the NRC and BG&E concerning the request, the Feed Line Break analysis presented in that submittal has been redone with a more limiting MTC input, in an effort to uncomplicate the upcoming Unit 2 Cycle 8 Reload License submittal. In fact, there is now no connection between the Reference (a) submittal and Unit 2 Cycle 8 safety analyses.

The Feed Line Break event was reanalyzed with a more limiting postive MTC limit that ramps down from +.7% delta Rho / F at 70% power to +.3% delta Rho / F at 100%. This MTC limit results in a peak reactor coolant system (RCS) pressure of less than the 110%

RCS design pressure.

The upcoming Unit 2 Cycle 8 license submittal will reference only briefly the Feedline Break Analysis results as they were bounded by the reload analysis reference cycle results. The reference cycle for the upcoming Cycle 8 is Unit 2 Cycle 7 (Reference (b)).

D. S. Elkins Senior Engineer Fuel Cycle Management DSE/Imt ll 080 I 8702090122 870203 a

PDR ADOCK 05000318 gQ p

PDR

Fc=bru::ry 3,1987 FCM 87-022 i

Page 2 cc: M. E. Bowman L. E. Saiyards W. C. Holston W. P. McCaughey

3. E. Baum (C-E) 3AM/ File: Licensing