ML20209J291

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Emergency Plan Implementing Procedures,Including Rev 8 to EP M-4 Re Earthquake & Rev 3 to EP M-10 Re Fire Protection of Safe Shutdown Equipment. Related Correspondence
ML20209J291
Person / Time
Site: Diablo Canyon  
Issue date: 03/05/1985
From: Shiffer J
PACIFIC GAS & ELECTRIC CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20209J296 List:
References
CON-#485-058, CON-#485-58 DCL-85-091, DCL-85-91, OL, NUDOCS 8511110434
Download: ML20209J291 (4)


Text

055 fCOOV RELATTn crmTMPONDmCE

$O PACIFIC OAS AND E LE C T RIC C O M PANY 15 e's)g4:

7 4rti n scatt stacrv. s4u ra4=cisco catiroania 94tos pg,g March 5,1985

$[ 6 7 :::...

m,,\\;

PGandE Letter No.i DCL-85-091 Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Re: Docket No. 50-275, 0L-DPR-80 Docket No. 50-323 0 L-Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedure Updates

Dear Mr. Martin:

In accordance with Section V, " Implementing Procedures," of 10 CFR 50, Appendix E, PGandE is submitting one copy of the updates to the detailed Implementing Procedures (Enclosure 3) for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan. These updates are 1tsted in Enclosure 1.

Concurrently, twc copies of each update are being submitted to the Document Control Desk.

Some of the updates contain privacy / proprietary information. This privacy / proprietary information has been bracketed in accordance with NRC Generic Letter 81-?7 and is identified in Enclosure 2 Kindly acknowledge receipt of the above material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

Sincerely, W. A. Raymond for J. D. Shiffer Enclosures cc:

R. T. Dodds R. Fish Document Control Desk (2)

Service List cc w/o enc 3:

G. W. Knighton

'/-

8511110434 850305 PDR ADOCK 05000275 F

PDR

1.

PGandE Lettgr No.: DCL-85-091 ENCLOSURE 1 Updates Included In This Submittal i

DIABLO CANYON EMERGENCY PLAN IMPLEPENTING PROCEDURES E

Volume 3A Updated Table of Contents EP M-4, Revision 8 EP P-10, Revision 3 l

1 i

i i

l i

4 0502d/0005K i

.. ~

PGandE Lettgr N3.: DCL-85-091 4.

ENCLOSlfRE 2 Location of Privacy / Proprietary information Procedure:

EP M-4 Pages 6 and 10 i

j l

i l

t t

r j

i l

4 i

i I

I i

P 1

'I 0502d/0005K

. =

PGandE Lstttr No.: DCL-85-091 1

i ENCLOSURE 3 4

4 a

4 Updates to Diablo Canyon f

Emergency Plan Implementing Procedures i

4 5

1 4

't

.i i

i p

I

[

C I

I t

0602d/0005K 1

. _ _ _. - _. _ -. _ _ _. _ _.. _. _. _ -, _. _ _, _ _