ML20209J214

From kanterella
Jump to navigation Jump to search
Notifies That Requalification Program Evaluation Scheduled for Wk of 861208.Encl Ref Matl Requested by 861003 in Order to Assist Examiner in Preparing for Visit
ML20209J214
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 09/12/1986
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Taylor J
DAIRYLAND POWER COOPERATIVE
References
NUDOCS 8609160206
Download: ML20209J214 (3)


Text

-

~-

j-SEP 121986 4

- Docket No. 50-409 i

Dairyland Power Cooperative i

ATTN: ~Mr. J. W. Taylor General Manager 2615 East Avenue.- South-j La Crosse, WI 54601

Dear Mr. Taylor:

~

SUBJECT:

REQUALIFICATION PROGRAM EVALUATION In a telephone conversation between Mr. R. D. Lanksbury, Chief Examiner, and 4

Mr. L. Kelley, Training Supervisor, arrangements were made for an evaluation of the requalification program at the LaCresse Boiling Water Reactor (LACBWR).

The evaluation visit is scheduled for the week of December 8, 1986.

4 For this visit, the NRC examiner will administer NRC prepared written, oral, and walk through examinations. When the NRC examiner arrives at the site, he 1

will meet with the appropriate facility personnel to review the schedule for those examinations.

For.the examiner to adequately prepare for this visit, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1, " Reference Material Requirements for Requalification Program Evaluations," by October 3, 1986. Mr. Kelley has been advised of our reference material requirements and where they are to be sent.

This request for information was approved by the Office of Management-and Budget under Clearance Number 3150-0101, which expires May 31, 1989.

Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3203, New Executive Office Building, Washington, D. C. 20503.

i Thank you for your consideration in this matter.

If you have any questions j

on the evaluation process, please contact R. D. Lanksbury (312) 790-5579.

Sincerely, f>YMna? Sfgned & C. W. W i

8609160206 860912 PDR ADOCK 05000409 V

PDR l

Charles W. Hehl, Chief Operations Branch

Enclosure:

As stated See Attached Distribution i

l RIII RIII RIII RlII p

k'/

Lanksbury/mab Burd ck Boyd (,

Hehl 09/09/86

}

qP

}v p

b I

Dairyland Power Cooperative 2

SEP 121%6 Distribution cc w/ enclosure:

J. Parkyn, Plant Superintendent L. Kelley, Training Supervisor DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII John Stang, NRR John J. Duffy, Chief Boiler Section Mary Lou Munts, Chairperson Wisconsin Public Service 4

Commission

' Spark Burmaster,' Coulee Region Energy Coalition l

cc w/o enclosure:

W. A. Paulson, Project Manager, NRR J. Hannon, Acting Branch Chief, OLB 1

1

ENCLOSURE 1 Reference Material Requirements for Requalification Program Evaluation 1.

All administrative procedures (as applicable to reactor operation or safety) 2.

All integrated plant procedures (normal or general operating procedures) 3.

Emergency procedures (emergency instructions, abnormal, or special procedures) procedure, when appropriate) g procedures (initial core-loading Fuel-handling and core-loadin 6.

7.

Annunciator procedures (alarm procedures, including set points) 8.

Radiation protection manual (radiation control manual or procedures) 9.

Emergency plan

10. Technical Specifications
11. Lesson plans (training manuals, plant orientation manual, systems descriptions)
12. Systems operating procedures
13. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams

)

14. Copies of facility R0 and SR0 requalification examinations administered l

during the past 2 years

15. An index of administrative, operating, abnonnal and emergency procedures
16. Plant technical data (curve) book All of the above referenced material should be approved, final issues and should be so marked. Uncontrolled, preliminary, or other such issues will not be acceptable. All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.

.